1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08.

Slides:



Advertisements
Similar presentations
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE meeting at LBNL 10.Feb.2005 DAQ system for KEK test beam Hardware Software Processes Architecture SciFi.
Advertisements

January 11, Data Format for MICE Trackers Tracker Data Readout Basics Preliminary Tracker Data Format and Suitability for VME Data Transfers. Questions.
MICE Fiber Tracker Electronics AFEII for MICE (Front end readout board) Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs.
CMS Week Sept 2002 HCAL Data Concentrator Status Report for RUWG and Calibration WG Eric Hazen, Jim Rohlf, Shouxiang Wu Boston University.
Status of MICE Tracker System H. Sakamoto, Osaka University (on behalf of the MICE Collaboration) International Muon Ionization Cooling Experiment (MICE)
First Results from Tracker 1  Cryostat Commissioning  AFE/VLSB Firmware and Readout  Cosmic Ray Setup  Tracker Readout  Software  Trigger Timing.
Workshop Goals MICE Controls and Monitoring Workshop September 25, 2006 A. Bross.
Tracker DAQ Makoto Yoshida (Osaka Univ.) MICE Frascati 2005/6/27.
MICE Tracker Readout Overview channel AFE II-t boards - 8 Visible Light Photon Counter (VLPC) cassettes - 4 cryostats.
1 VLPC system and Cosmic Ray test results M. Ellis Daresbury Tracker Meeting 30 th August 2005.
SciFi Tracker DAQ M. Yoshida (Osaka Univ.) MICE Tracker KEK Mar. 30, 2005.
MICE Tracker Front End Progress Tracker Data Readout Basics Progress in Increasing Fraction of Muons Tracker Can Record Determination of Recordable Muons.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Introduction/Overview AFE-IIt firmware development VLSB firmware development Hardware progress.
Tracker Controls MICE Controls and Monitoring Workshop September 25, 2005 A. Bross.
2005/10/22 MICE CM at RAL, Tracker Parallel, Makoto Yoshida 1 KEK test beam - introduction - M. Yoshida MICE CM tracker parallel 2005/10/ /10/22.
Linda R. Coney – 24th April 2009 Online Reconstruction & a little about Online Monitoring Linda R. Coney 18 August, 2009.
Linda R. Coney – 24th April 2009 Online Monitoring and Reconstruction Linda R. Coney 4 June, 2009.
DAQ for KEK beam test M.Yoshida (Osaka Univ.). Components VLPC readout –Stand Alone Sequencer (SASeq) Slow < 100Hz –Buffering VLPC data with VME interface.
Tracker 2 Cryo &Electronics Update Linda Coney, UC Riverside Terry Hart, U Mississippi Ben Freemire, IIT Malcolm Ellis, Brunel University ADB MICE Collaboration.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 DDAQ Trigger o Reminder: DAQ Trigger vs Particle Trigger o DAQ Trigger o Particle Trigger 1) Possible.
MICE Workshop Sept 2004 AFEII for MICE Recall: AFEs mount on ether side of the VLPC cass, with fibers going to the VLPCs between them. AFE has 8 identical.
Status of the preparation for KEK test beam M. Yoshida (Osaka Univ.) MICE VC 2005/9/14.
MICE Tracker Readout Increased Data Readout Rate VLSB Development 16 AFE II t boards 8 Visible Light Photon Counter (VLPC) cassettes 4 cryostats.
1 MICE/AFE II t Update IIT Analog Front End (AFE) Test Stand AFE Conceptual Design Report (CDR) Terry Hart, Illinois Institute of Technology, February.
DEMONSTRATION FOR SIGMA DATA ACQUISITION MODULES Tempatron Ltd Data Measurements Division Darwin Close Reading RG2 0TB UK T : +44 (0) F :
MICE Tracker Readout and Data Acquisition; Solenoid Magnetic Field Measurement Terry Hart for the MICE Collaboration, Illinois Institute of Technology,
MICE CM26 March '10Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM25 o DAQ System Upgrade o Luminosity Monitors o Sequels of.
Cryo Update and Power Distribution Alan Bross Tracker Parallel – MICE CM October 7, 2007.
Takashi Matsushita Imperial College T. Matsushita 1 Tracker Status.
1 MICE Tracker Update M. Ellis UKNFIC Meeting 25 th August 2005.
Imperial College Tracker Slow Control & Monitoring.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Aug 5, 2013.
MICE CM25 Nov 2009Jean-Sebastien GraulichSlide 1 Detector DAQ Issues o Achievements Since CM24 o Trigger o Event Building o Online Software o Front End.
1 Online Calibration of Calorimeter Mrinmoy Bhattacharjee SUNY, Stony Brook Thanks to: D. Schamberger, L. Groer, U. Bassler, B. Olivier, M. Thioye Institutions:
11 October 2002Matthew Warren - Trigger Board CDR1 Trigger Board CDR Matthew Warren University College London 11 October 2002.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 Delay FPGA I/O Clock40.
MICO July 07Jean-Sébastien GraulichSlide 1 Detector DAQ Status o Overview – Hardware status o Installation at RAL o DAQ workshop o Current Activities Jean-Sebastien.
Tracker Summary Alan Bross MICE CM October 10, 2007.
1 MICE Tracker Readout Update, Preparation for Cosmic Ray Tests Cosmic Ray Tests at RAL AFE-IIt Firmware Development VLSB Firmware Development Summary.
C. Combaret DIF_GDIF_MDIF_D ASU 6x 24 HR2 ASU USB Hub RPi USB2 DCC SDCC RPi USB 1 hub+Rpi for 4 cassettes 1 DCC for 8 cassettes (1 spare) Trigger.
Rome 4 Sep 04. Status of the Readout Electronics for the HMPID ALICE Jose C. DA SILVA ALICE.
Features of the new Alibava firmware: 1. Universal for laboratory use (readout of stand-alone detector via USB interface) and for the telescope readout.
Dec.11, 2008 ECL parallel session, Super B1 Results of the run with the new electronics A.Kuzmin, Yu.Usov, V.Shebalin, B.Shwartz 1.New electronics configuration.
Tracker Timing and ISIS RF Edward Overton 1. At CM32… 2 Had done some preliminary checks on the ISIS RF. Was beginning to think about how to handle the.
January 31, MICE DAQ MICE and ISIS Introduction MICE Detector Front End Electronics Software and MICE DAQ Architecture MICE Triggers Status and Schedule.
MICE Phase 1 Koji Yoshimura KEK June
DAQ Status for cosmic-ray test in RAL Hideyuki Sakamoto MICE Phone meeting 12 th July 2007 Contents Status Setup for cosmic-ray test bench Schedule.
1M. Ellis - 17th May 2007 SciFi Decoding (Everything you never wanted to know but couldn’t avoid going over and over)  VLSB Data (unpacking to AFE, MCM,
1 AFE IIt/VLSB Update Terry Hart, MICE Tracker Phone Conference September 5, 2007.
1Malcolm Ellis - Tracker Meeting - 28th November 2006 Electronics - Station Acceptance  Hardware: u 1 MICE cryostat with 1 VLPC cassette. u VME crate,
1 MICE Tracker Readout Update AFE IIt firmware development VLSB firmware development Hardware progress Summary Terry Hart, MICE Tracker Meeting, August.
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
1 MICE Tracker Readout Update Introduction/Overview TriP-t hardware tests AFE IIt firmware development VLSB firmware development Hardware progress Summary.
Tracker Cosmic Ray Test 2011 Linda R. Coney UC Riverside CM 29 - February 16, 2011.
Detector Summary Tracker. Well, as far as the tracker hardware is concerned, we are done. – Need to do the system test to make sure nothing has degraded.
October Test Beam DAQ. Framework sketch Only DAQs subprograms works during spills Each subprogram produces an output each spill Each dependant subprogram.
Analysis for QA (temporary) Hideyuki Sakamoto 1 st October 2007 MICE Tracker Phone Meeting.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
16th May 2007 MICE tracker phone meeting 1 Setup test bench/ Installation DATE Hideyuki Sakamoto 16 th May 2007 MICE phone meeting.
MICE CM February 08Jean-Sébastien GraulichSlide 1 Report on DAQ & CAM o Detector DAQ Status Hardware Trigger Software o Controls and Monitoring (CAM) o.
Tracker Readout Progress Terry Hart, MICE Tracker Meeting, July 29, 2008 Cosmic Ray Readout with 1 st Tracker at RAL 2 nd Tracker Preparation at FNAL Firmware.
Station Acceptance Test. 22/02/2007 M. Takahashi 2 Lab Layout at IC.
Rutherford Appleton Laboratory September 1999Fifth Workshop on Electronics for LHC Presented by S. Quinton.
Electronic System Design GroupInstrumentation DepartmentR. Halsall, S. Taghavirad et alRutherford Appleton Laboratory5 March 2003 CMS Tracker FED Firmware.
VC98 March 07Jean-Sébastien GraulichSlide 1 DDAQ Status o DAQ Software o Front-End and Trigger o What will happen soon o Schedule Milestones Jean-Sebastien.
20 April 2007MICE Tracker Phone Meeting1 Analysis of cosmic/self-triggerd data of station 5 Hideyuki Sakamoto MICE Tracker Phone Meeting 20 th April 2007.
Tracker readout, DAQ, C&M and calibration
Iwaki System Readout Board User’s Guide
Preparation for Station Acceptance Test
Hideyuki Sakamoto CM22, RAL 19/10/08
Presentation transcript:

1 DATE-based DAQ Hideyuki Sakamoto CM22, RAL 19/10/08

2 R8 cosmic-ray test stand In R8, cosmic-ray test for Tracker#1 is running, and Tracker DAQ has been tested this time. Trigger counter (C3,4) Trigger counter (C1,2) Light-guides Cryo#2Cryo#1 Lead block Tracker#1

3 DATE-based DAQ By the last week, DAQ using DATE with EPICS has been checked to work correctly by the following procedures. 1.Installation of DATE package 2.Write test code 3.Rebuild trigger logic 4.Take data of C1-4 counters with DATE 5.Check data 6.Take data of C1-4 and 8 VLSBs 7.Check data with that taken by EXCEL 8.Replace code of AFE with EPICS one 9.Check data

4 DATE Installed on 15 th Oct08

5 GUIs for DATE Status display 2. DAQRUNCONTROL 3. DATE Logger 4. editDb

6 Readout in DATE User implement following 5 functions in XXX equipment. 1.ArmXXX- called at starting run 2.DisArmXX - called at stopping run 3.AsynchReadoutXXX - called every event 4.EventArrivedXXX- called after ArmXXX 5.ReadEventXXX- called after trigger arrived User register parameters, such as base address in MySQL. User get those parameters from function’s argument. User can choose options to generate trigger and/or generate data for XXX equipment.

7 Our equipments a.SBS VME bus adaptor b.CAEN V977 I/O Register c.CAEN V792N QDC (16ch-lemo) d.MIL-1553 e.VLSB Trigger module f.VLSB module abcde f From C1-4 From AFEIIt

8 Equipments in DATE NameDescriptionTypeDT#/pars. VMEVME bus adapter40000 AFEAFEIIt boards50101 V977CAEN I/O Register60012 V792NCAEN QDC (16ch-lemo)70102 VLSBSlaveVLSB board80106 VLSBMasterVLSB trigger board/ VLSBSlave controller Type: Number to identify the equipment D: GENDATA T: GENTRIGGER #/pars.: Number of parameters registered in MySQL

9 Start run AFE 1. Check if AFEIIt boards are configured –If no, run stop, and –User configures boards using EPICS ConfigurationUI. 2. Enabling trigger of AFE boards by EPICS

10 Event loop Coin.V977 I/OVLSB Trig EventArrivedVLSBMaster VETO T560 ReadEventVLSBSlave Delay module clock MIL1553 AFEIIt TTL 3 6 LVDS 1, 5 VLSB C1-4 Enable trigger of VLSB 3 Reset VETO 4 Wait until trigger is arrived 5 Check if trigger was accepted to AFE. If no, go back to Disable trigger of VLSB 7 Read VLSB data  Clear VLSB buffer 1 Enable monitoring  Read Temp/Heat of cassette  Disable monitoring Triggger

11 Decoding Following data are recorded. –ADC of trigger counters (4 channels) –Temp/Heater of 4 cassettes (32 channels) –ADC/TDC of 8 VLSBs (4096 channels)

12 DATE Event Structure event header event equipment A equipment B equipment equipment header DATA

13 DATE Event Header (17 words) name#/wordsdescription eventSize (byte)1Header (17 words) + Data eventMagic1 eventHeaderSize (byte)168(0x44) byte = 17 word eventVersion1 eventType1SOR/EOR, PHYSICS, … eventRunNb1Run# eventId2Event# eventTriggerPattern2 eventDetectorPattern1 eventTypeAttribute3 eventLdcId1Ldc# eventGdcId1Gdc# (=0xffffffff for no GDCs) eventTimestamp1Timestamp

14 DATE Equipment Header (7 words) names#/wordsdescriptions equipmentSize (byte)1Header (7 words) + Data equipmentType1# to identify different type of equipment equipmentID1# to identify same type of equipment equipmentTypeAttribute3Not used equipmentBasicElementSize (byte)1Not used

15 Raw data Equipments (GENDATA) –2 AFEIIts & 1 VLSB (includes 2 boards) Events recorded –SOR –PHYSICS –EOR (not seen here) Size of Equipments –AFE = 23 words = 92(0x5c) bytes 7(Header) + 8 (temp) + 8 (heater power) –VLSB = 1167 words = 4668 (0x123c) bytes 7(Header) (145 x 4 links x 2 boards) Size of PHYSICS event –1230 words = 4920 (0x1338) bytes = 17(Header) + 23 x 2(2 AFE) (1 VLSB w/ 2boards) PHYSICS event Header SOR event Header LHB Header LHB data RHB data RHB Header VLSB data VLSB header SOR event Header

16 V792N (QDC) Data Format name#/wordsdescription data16Raw data (ch0 – ch15) V792N 32bit data format:

17 AFE Data Format name#/wordsdescription cassetteSize1#/cassettes (currently 4) tempSize1#/temperatures (should be 8) temperaturetempSizeTemperature (9.0 etc.) heaterSize1#/heater values (should be 8) heatervalueheatSizeHeater value (100 etc.) …continue to the next cassette Note that, temperature is NOT integer. Use float (4 bytes) to read its value. Heater value is integer.

18 VLSB Data Format name#/wordsdescription trigSize1#/triggers (currently, 1) bank1Size1#/data (180, etc..) bank1databank1SizeVLSB 32bit data bank2Size1 bank2databank2Size bank3Size1 bank3databank3Size bank4Size1 bank4databank4Size …continue to the next trigger VLSB32bit data format: 12345678910111213141516171819202321242526272829303122 Pair1syncbit 0 CounterStatus bitsData flagPair0 Chan/ADC/TDC

19 C1-4 ADC distribution

20 Temperatures/Heater values of Cassettes

21 VLPC ADC distribution

22 Summary Tracker DAQ based on DATE in combination with EPICS has been tested and checked to work correctly at R8 cosmic-ray test stand.

23 Next step (R8  XXX  MLCR) Modify readout code according to newly updated firmware (VLSB/AFE?) if necessary. Installing Tracker#1 in MICE Hall. Move DAQ pc/VME crate to MLCR. Construct trigger logic using ISIS Spill. Test/debug … Take beam data (Step II.)