An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other.

Slides:



Advertisements
Similar presentations
Jan Uythoven, AB/BTLHCCWG, 3 May 2006 Page GeV Commissioning Machine Protection Needs to be commissioned to: Prevent damage with the used, higher.
Advertisements

1 Powering Tests and Safety Electrical Safety Hugues Thiesen Power Converter Group.
New HV test specification for the LHC N. Catalan for the EI section.
Tuesday 10 th April - morning Access for:  point 3 Jerome Landaro TCSG one jaw didn't move  point 5 Qps expert on RPMBB.UJ56.RCBXH1.R5  point 6 TCDQ.
Team Launch Introduction. Real projects are large and complex, and most software is created by teams Merely throwing people together does not result in.
1 Copper Stabilizer Continuity Measurement Project CSCM Mini Review Powering Implementation H. Thiesen 30 November 2011.
Powering Group of Circuit Doubts and proposals of the procedure reviewing team (Gianluigi, Rob, Sandrine, Matteo, Boris) Ref document: LHC-MPP-HCP-071.
Session th January 2010 R.Schmidt TE/MPE Hardware Commissioning 2010 and beyond R.Schmidt.
Proposal for Decisions 2007 Work Baseline M.Jonker for the Cocost* * Collimation Controls Steering Team.
Operational tools Laurette Ponce BE-OP 1. 2 Powering tests and Safety 23 July 2009  After the 19 th September, a re-enforcement of access control during.
Chamonix Risks due to UPS malfunctioning Impact on the Superconducting Circuit Protection System Hugues Thiesen Acknowledgments:K. Dahlerup-Petersen,
LHC Cryogenics: “From cool-down & HWC to operation with beam” S. Claudet, for LHC cryogenics Extended LTC, 3 Mar’08.
1 Second LHC Splice Review Copper Stabilizer Continuity Measurement possible QC tool for consolidated splices H. Thiesen 28 November 2011 K. Brodzinski,
Powering of the Superconducting Circuits: Procedures and Strategies for Circuit Validation Antonio Vergara on behalf of the Hardware Commissioning Coordination.
LHC Hardware Commissioning Review May 2005, CERN, 1211 Geneva 23 1 LHC Hardware Commissioning Review Contribution ID: 20 – Quality assurance and.
HC Review, May 2005 Hardware Commissioning Review Hardware Commissioning Review Quality Assurance and Documentation of Results Félix Rodríguez Mateos,
1 Copper Stabilizer Continuity Measurement Project Copper Stabilizer Continuity Measurement Status & Plans – May 2011 MPE-TM – 12 May 2011 M. Koratzinos,
Summary and Discussion Rüdiger Schmidt Summary and discussions.
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
For more info:
TRACKING OF FAULTS AND FOLLOW-UP Accelerator Fault Tracking project Jakub Janczyk (TE-MPE-PE / BE-CO-DS) with input from: Andrea Apollonio, Chris Roderick,
Roberto Saban LEMIC Coordination of Hardware Commissioning  Sector 78 Cooldown Cooldown Powering Tests Powering Tests Test of software for the.
Schedule IT General Schedule 9 th, September 09 Today.
Hardware Commissioning Tools Robin. AB-CO TC 8th February 2007Hardware Commissioning Tools - RJL2 Summary Hardware Commissioning View Slides from Antonio.
M. POJER, ON BEHALF OF THE USUAL BUNCH OF SUSPECTS… S UPERCONDUCTING CIRCUITS RE - COMMISSIONING AFTER THE 2011 C HRISTMAS BREAK.
Hardware Commissioning Review, Markus Zerlauth, 11 th July CO deliverables for HWC – lessons learnt and the proposed way ahead Markus Zerlauth,
Hardware Commissioning  Preparation Documentation MTF Programme  Status The Review The commissioning activity in Resources  Outlook The new.
Review of Sector th of February Electrical Safety for the interventions during Hardware Commissioning of LHC Anne Funken, TS-ICC.
1 Commissioning and Early Operation – View from Machine Protection Jan Uythoven (AB/BT) Thanks to the members of the MPWG.
BCWG - 16/11/20102 Content WHY do we need a HW Commissioning campaign? WHAT are we going to do? HOW are we going to do it? ElQA QPS Powering Tests Planning.
NQPS commissioning …a long way to go. Topics nQPS component overview Enhancements in Firmware Commissioning diagram Detailed task list Summary.
SAFETY DURING HARDWARE COMMISSIONING, 18 October 2007, D. Bozzini, AT/MEL-EM 1 Safety during Hardware Commissioning Davide Bozzini on behalf of the ELQA.
Andrzej Siemko On behalf of the MPP-GMPMA Task Force: (A. Ballarino, R. Denz, B. Khomenko, A.Perrin, P. Pugnat, A. Rijllart, L. Serio, A. Siemko, A. Vergara.
1 15 April 2010: Post Mortem Analysis by M.Zerlauth Automated analysis of Powering Events – Progress update.
LHC Cryogenics for sector 45 and Perspectives S. Claudet, for LHC cryogenics HWC Review, 28 Fev’08.
AB/CO Review, Interlock team, 20 th September Interlock team – the AB/CO point of view M.Zerlauth, R.Harrison Powering Interlocks A common task.
New projects, priorities and main objectives for /12/15 TE-MPE Annual Meeting1.
Review of Sector th of February Tunnel Access During Powering Tests Hugues Thiesen, AB-PO.
AT-MEL Group Meeting, CERN, 1211 Geneva 23 1 ElQA activities during hardware commissioning N. Catalan Lasheras.
LHC Machine Status Report Mike Lamont for the LHC team Acknowledgements: Mirko Pojer, Matteo Solfaroli, Katy Foraz et al.
Conclusions on UPS powering test and procedure I. Romera Acknowledgements: V. Chareyre, M. Zerlauth 86 th MPP meeting –
TE-MPE, MPE Workshop 2010, G.D’Angelo, 14-Dec TE-MPE on-call service for the LHC Giorgio D’Angelo on behalf of TE-MPE On call team, with inputs.
MPE Workshop for LS1 Summary of Global Activities Thanks to Speakers Arjan Verweij Hugues Thiesen Zinur Charifoulline Kajetan Fuchsberger.
Training LHC Powering - Markus Zerlauth Powering Interlocks Markus Zerlauth AB/CO/MI.
Roberto Saban TS HC Review bis Outline  Interviews of all the Group Leaders loosely or tightly concerned by hardware commissioning proposing them.
MPP Meeting 07/03/2007 MPP Main Ring Magnet Performance Panel Meeting Wednesday 7th March 2007 Agenda: 1)Matters arising 2)Recommendations for the case.
Closing session Issues and questions from the audience and some from me Rüdiger Schmidt.
July 11, 2007 HC WorkshopG.J. COELINGH - AT / MEL 1 Energy Extraction.
The prototype test String 2 May 13, 20082Roberto Saban – Academic Training Lecture 1 – Why LHC Hardware Commissioning?
CSCM (Thermal Amplifier) Sequence and detailed planning 07/10/2011 M.Solfaroli Thanks to: K.Brodzinski, G.D’Angelo, M.Koratzinos, M.Pojer, R.Schmidt, J.Steckert,
SC Undulators protection and commissioning W. Venturini Delsolaro Acknowledgements: R. Denz, R. Maccaferri.
Training LHC Powering – Blanca Perea Solano From Individual System Tests to Powering to Nominal Blanca Perea on behalf of Hardware Commissioning Coordination.
LHC experience with installation Katy Foraz March 6th 2008, Dubna GDE Meeting - ILC Conventional Facilities and Siting Workshop ***********************************
CPMGT 300 Week 2 Learning Team Reflection Check this A+ tutorial guideline at T-300/CPMGT-300-Week-2-Learning- Team-Reflection.
ECO 365 Week 2 Learning Team Reflection Production and Cost Analysis Discuss this week’s objectives with your team. Include the topics you feel comfortable.
ECO 372 Week 4 Learning Team Weekly Reflection Discuss this week’s objectives with your team. Your discussion should include the topics you feel comfortable.
Minimum Hardware Commissioning – Disclaimer
Powering the LHC Magnets
As energy coordinator for CERN Accelerators & Technology
MPE main activities planned for LS2
Powering from short circuit tests up to nominal
James Ridewood BE-OP-SPS
Overview & baseline of LS2 and roadmap for CRG
Agenda Contents Different types of documents
Assumption for a given sector
Brief report of the hardware commissioning activities
Commissioning of the LHC superconducting magnets systems: Why an LHC Hardware Commissioning? Specificity and complexity of this machine Roberto Saban.
Hardware Commissioning
Review of hardware commissioning
Presentation transcript:

An invitation to an open discussion We are team reviewing its performance globally We want to help each other to reach the objectives We know the other systems and are aware of their performance 2 February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 The outcome of the day is a list of topics which should studied in order to improve ◦ the safety, ◦ the efficiency, ◦ the quality, ◦ the methods, ◦ the comfort of the commissioning exercise in the light of the more difficult days ahead with more sectors in parallel The outcome of the day is a list of topics which should studied in order to improve ◦ the safety, ◦ the efficiency, ◦ the quality, ◦ the methods, ◦ the comfort of the commissioning exercise in the light of the more difficult days ahead with more sectors in parallel

The programme The talks reflect discussions on the topics selected During and after the talk discussions are encouraged The day will end with a presentation which is the summary of the essential point discussed during the day and includes the list of topics to be further studied. 3 February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 The introduction The overview of Sector 45 Safety & access The systems: Cryogenics, DFBs and current leads Powering, Power Converters, Quench Protection System, 600 A and 13 kA Energy Extraction The tests and the analysis: Powering tests and Magnet Performance Panel The tools: Post-Mortem, Logging, Sequencer, Tracking data and progress after the tests Summary and discussions The introduction The overview of Sector 45 Safety & access The systems: Cryogenics, DFBs and current leads Powering, Power Converters, Quench Protection System, 600 A and 13 kA Energy Extraction The tests and the analysis: Powering tests and Magnet Performance Panel The tools: Post-Mortem, Logging, Sequencer, Tracking data and progress after the tests Summary and discussions

the shifts & the follow-up meetings 4 February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector morning shift afternoon shift

Organization of the Powering Tests R.Saban 5 how do we operate? Operation Crew EIC, OP, TI-OP Equipment Owners in the Field: PO, QPS, EE, PIC Support Groups Cryo, Software, EL, CV Instruct Report failure Unblock situation Request support Give support Report result Report infrastructure, or software failure or software failure Report on-call service CCC meetings on-call and piquet service MPP Report test results Validate results

The months to come February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 6 ICC February 15th few The few months to come

February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 7 ICC February 15th The strategic questions Sectors in parallel versus circuit types in parallel 7 TeV versus a lower value which is straightforward to achieve? What lower value? Systematic commissioning of every circuit to nominal current versus maximum currents determined by the machine optics and the target beam energy

Controls issues Managing, preparing SOCS Following progress Interface with MTF Organizational issues Reporting, data recording, logbook (can we really trace back what were the conditions, what were the arguments for a decision, what really happened, etc.) Powering groups of circuits The miniteams February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 8

2 shifts during 5 days: do we need to go to 3 shifts during 7 days? Can we? MPP analysis: can it be done during a nightshift, the weekend? Where are the bottlenecks in manpower? A Commissioning Coordinator on duty on a weekly basis to coordinate across sectors Are the 8.30 and the meetings efficient? Are they held at the right time? How can the activities continue during meetings? The organizational issues February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 9

Does an EIC/an operator feel left alone? Is he/she given enough information on his/her mission? Written guidelines (e.g. conditions for powering)? Tools for coordination? For getting help? For reporting? For passing information to the next shift? ADI and consignation: does it work? How well are we doing for the liaison with “commissioning with beam”? The organizational issues February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 10

The summary and the discussion The follow-up by mini teams The report The implementation and the testing in the few weeks where we have one sector at a time The deliverables February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45 11

LR5 IPQ IPD A A 3110 A56 RB QD QF IP A A 600A 60A XR5 ML6 IPQ A A 2413 ELQA - DOC 4 K Anti-condensation System Anti-condensation System Anti-condensation System DFBMMs Comm. DFBAs Comm. DFBLE Comm. DFBXF Comm. ELQA 1.9 K w.09 w.10 w.11 Today Tuning of cryogenics at 1.9 K Piping and level sensors DFB Comm. DFBXF Comm. ELQA QPS IST C.Leads POWERING DFBLE Comm.

13 February 28 th 2008 Roberto Saban – Review of the Commissioning of Sector 45