MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.

Slides:



Advertisements
Similar presentations
MODELING THE TESTING PROCESS Formal Testing (1.0) Requirements Software Design Risk Data Approved, Debugged, Eng. Tested Code Automated Test Tools Tested.
Advertisements

All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Plans for rover operations training at ROCC M. Cinato.
Return to the Main Training Menu HABET Core Menu HABET Organization The HABET Organization This section of the HABET core training explains how the project.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
Pulaski Technical College Committee Training August 11, 2014.
CHAPTER 5 Infrastructure Components PART I. 2 ESGD5125 SEM II 2009/2010 Dr. Samy Abu Naser 2 Learning Objectives: To discuss: The need for SQA procedures.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
All rights reserved © Altec ExoMars 2018 Rover Operations Control Centre Planned Organization of ROCC Operations I. Musso.
Constellation Space Transportation Planning Office July 30, 2009.
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Preliminary Advanced Colloids Experiment – 2.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIF End-to-End Process.
1 Payload Training. 2 Payload Processes Overview Payload Operations & Integration Function Training Team Payload Training contact –Team LeadLynn Baker(256)
MSFC Payload Training bs/kh/ExpPldsTST#1/ 3/18/2016 Page 1 Astroculture-8 (ADVASC) TST #1 April 27, 1998 DTM/Beth Skidmore NASA/MSFC Training Branch Voice.
IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center
Introduction to Payload Planning Will Kirby (256)
Crew Operations Team Alexia R. Matthews Cold Stowage CPE (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 21 & 22.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama TIR overview for UBNT.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
MOL The Mission Operations Laboratory First Contact Package June 2011 NASA MSFC Huntsville, Alabama An Introduction to the Payload Systems Team (PLST)
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for KSC Payloads #3 of 5 June 5, 2013 Getting.
Mission Planning Process Changes Gary Rowe Mission Planning Team Lead Teledyne Brown Engineering Presented to: Increment 3 POIWG June 13, 2001 Mission.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Status Increment.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama LEGO BRICKS TIR OVERVIEW Tricia Pittman EO20.
OC Team Ops Notes. Jenn Whitworth I2 PRO What are Ops Notes? Ops notes are the OC team’s (OC, Paycom, PRO, CPO)
E-USOC operations in Increments José Miguel Ezquerro Navarro E-USOC/UPM Jul 2010POIWG#28 - Huntsville, AL.
ESA UNCLASSIFIED – For Official Use Experiment Development and Integration Process Philippe Schoonejans, Head of Robotics and Future Projects Office ESA.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
INTERNATIONAL SPACE STATION Kathy Nordmann Payload Crew Training 18 January 2005 TRAINING and CREW OPERATIONS.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
INTERNATIONAL SPACE STATION PTC Process Flows August 17, 2007 Robert D. Blum Payload Capability Training Lead
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
1 TIM #1-3 Ben Murphy Dispositif Pour l’Etude de la Croissance et des Liquides Critiques (DECLIC) November 12, 2003.
J. Fittipaldi / EO20 Crew Ops Displays Overview for Ops Leads Crew Ops September 2015.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
NASA MSFC Engineering Directorate Huntsville, Alabama 10/29/2012 HOSC DTN Activities October 2013.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Safety Operations at.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIC Flight Control Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama Date: March 3, 2011 Originator: Tricia Pittman/EO20.
POIC Safety Payload Operations & Integration Center Mitchell Moore Marshall Space Flight Center ARES Corporation POIC Safety 1.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama SPHERES Smartphone TST.
Multi-Droplet Combustion Apparatus (MDCA) Training Strategy Team #1 P T A E A E S T I S A N O I T A N R T O N L I N C D O P E R A O Y L A P A T I O N S.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
Date: August 5, 2004 Originator: Angela Marsh/FD42 Page: 1 Payload Planning System (PPS) User Requirements Collection (URC) POIWG Status August 5, 2004.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increments
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIWG August 2005.
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
Date: FD35 Page: 1 Agricultural Camera (AgCam) TIM #1-1 TST Introduction and Payload Training Overview Wade Stevens Flight Projects Directorate TBE/FD35.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Radiation Environment Monitor Kevin Hargrave EO
MOL Mission Operations Laboratory MOL Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Increment 12 On-Orbit Operations.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Kelvin Nichols, EO50 March 2016 MSFC ISS DTN Project Status.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Japanese Experiment Module (JEM) Airlock Overview Jimmy Whitaker ISS.
MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama First Contact Package Last updated June 2011 Payload Operations and Integration Function.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for SLOSH #2 of 5 July 17th, 2012 The Operations.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory ISS Ham Planning Operations.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Delta Training Strategy.
Software Configuration Management
Milestone A to Milestone B Requirements Management Activities
Civil Air Patrol Advanced Communications User Training
Presentation transcript:

MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training and Crew Operations July 2005 Kathy Nordmann Training and Crew Operations

MOL The Mission Operations Laboratory Page 2 NASA MSFC Engineering Directorate Huntsville, Alabama OPERATIONS LEAD QUICK-LOOK!

MOL The Mission Operations Laboratory Page 3 NASA MSFC Engineering Directorate Huntsville, Alabama What is an Ops Lead? Simulation Engineer (SE) Crew Procedures Engineer (CPE) Operations Controller POC (OCPOC) = Operations Lead

MOL The Mission Operations Laboratory Page 4 NASA MSFC Engineering Directorate Huntsville, Alabama Ops Lead Template - Conduct TST Telecons - Develop crew training requirements (hdw/sftw, curriculum, hours) - Define products and their authors - Define instructors - Define Proc. Author Review CDR data & write RIDs I-36/20 I-20I-19I-18I-17 Crew Training Starts for re-flight payloads Deliver Procedures and Ref Data into PIMS I-16 I-15 I-14 I-13 Tabletop Procedure Review CTC - Collects payload training requirements - Develops Crew Task Assignment CTC - Integrates training requirements - Delivers Payload Training Input to MITP - Conducts TRR PDRT Receives Displays OpNom Development & Baselining of Payload Name, Abbreviations, Acronyms, Hardware Names On-going Crew Procedure Development Write Pre/post Shipping Test Procedures

MOL The Mission Operations Laboratory Page 5 NASA MSFC Engineering Directorate Huntsville, Alabama Ops Lead Template I-12I-11I-10I-9I-8I-7I-6 Conduct Training Validation Crew Training Starts for new Facility payloads Instructor deliver lesson plan and Courseware Validation -2 wks Finalize OCBT Objectives I-5I-4I-3 ECR for PSM Inputs for: Integrated Safing Cue Cards Ground commanding URC inputs Flight Rule inputs Payload Reg inputs Write sim events Conduct PSAT (if required) Create PSM for Facilities only Serve as PD surrogates for sims Crew Training Starts for new Subrack payloads I-2 Build, Revise, and Baseline GSP Phase III training materials ECR Procedure Submittal Create GCP inputs for Vols. 1,2,3,5 Conduct Phase II Training POIC operated facilities only Conduct Phase III Training Deliver PSRD Vol. 2 for new subrack class fully integrated trainers Conduct PSIIC Baseline Procedures PD deliver new subrack payload trainers to PTC - Deliver Trainer Test Procedures - Conduct Pre- Ship Test Usability Review for Displays and Procedures only Payload Complement Training begins URC Review Participate in JIT activities

MOL The Mission Operations Laboratory Page 6 NASA MSFC Engineering Directorate Huntsville, Alabama ISS CREW TRAINING PROCESS CHANGES

MOL The Mission Operations Laboratory Page 7 NASA MSFC Engineering Directorate Huntsville, Alabama Agenda  Crew training topics  Phases/Types  TST & Training Data Set  Training Validation  OBT Development

MOL The Mission Operations Laboratory Page 8 NASA MSFC Engineering Directorate Huntsville, Alabama Phases/Types Template

MOL The Mission Operations Laboratory Page 9 NASA MSFC Engineering Directorate Huntsville, Alabama Changes 1. Advanced training only offered to ISS crewmembers assigned to an increment 1. Advanced training offered to any requesting crewmember After 01 OCT 2005Before 01 OCT 2005

MOL The Mission Operations Laboratory Page 10 NASA MSFC Engineering Directorate Huntsville, Alabama Training Strategy Team (TST)  Structured planning and decision making group who determine by analysis payload training requirements and what will be needed to fulfill those requirements  Voting participants include Ops Lead (chair), PD, CB rep  Telecons conducted to analyze training objectives and determine the best way and means to instruct ISS crew members on a payload  Training requirements entered into a Training Data Set and baselined at the NPOCB  Individual payload training requirements obtained by CTC to roll up into increment plan

MOL The Mission Operations Laboratory Page 11 NASA MSFC Engineering Directorate Huntsville, Alabama TST Process Template

MOL The Mission Operations Laboratory Page 12 NASA MSFC Engineering Directorate Huntsville, Alabama Changes

MOL The Mission Operations Laboratory Page 13 NASA MSFC Engineering Directorate Huntsville, Alabama Training Data Set Baseline Process TST determines individual Payload Trainer and Curriculum Requirements Ops Lead/PD inputs data to TDS Access Database via password protected Payload webpage hosted on POIC Server Ops Lead prints Trainer Requirements Report from TDS Database and submits with NPOCB ECR to Baseline Trainer Requirements Payload TDS available for viewing and report generation by authorized Users; modification NOT allowed CM Review, TCM, and Board Process Per CCBD, Ops Lead performs CCBD actions (if required) Per CCBD, TDS Database Administrator LOCKS individual payload Trainer Requirements to prevent any modification Trainer Reqts. Curriculum Reqts. I-20 mo. Trainer Reqts. Curriculum Reqts. Trainer Reqts. I-19 mo. Curriculum Reqts. CTC prints Training Curriculum Report from TDS Database to Develop Increment Specific Training Plan I-19 mo. Ops Lead and PD perform Training Validation Facility I-11 mo. Subrack I-9 mo. Ops Lead updates Training Curriculum information in TDS Database, if required Ops Lead prints Curriculum Requirements Report from TDS Database and submits with NPOCB ECR to Baseline Curriculum Requirements CM Review, TCM, and Board Process Per CCBD, Ops Lead performs CCBD actions (if required) Per CCBD, TDS Database Administrator LOCKS individual payload Curriculum Requirements to prevent any modification DT3/JSC prints Payload Lesson Change Request I-7 mo.

MOL The Mission Operations Laboratory Page 14 NASA MSFC Engineering Directorate Huntsville, Alabama Training Validation  Activity conducted to prove the instructor, equipment, and products are ready for training and the expected class time the TST agreed to is still correct  Participants include Instructor, Ops Lead, PAYCOM/OC  Ops Lead activities include:  Ensure either tabletop procedure review or usability complete  Develop Lesson Plan & Courseware (if instructor)  Coordinate Lesson Plan & Courseware review prior to activity  Schedule activity with instructor and PAYCOM/OC  Conduct Training Validation  Work and close any action items  Declare lesson & instructor Ready for Training  Successful completion of Training Validation certifies equipment, products, and instructor until changes are needed

MOL The Mission Operations Laboratory Page 15 NASA MSFC Engineering Directorate Huntsville, Alabama Changes

MOL The Mission Operations Laboratory Page 16 NASA MSFC Engineering Directorate Huntsville, Alabama On-Board Training (OBT) Development  On-board training can be used for Refresher, Proficiency, or Just-in-Time training  Most OBT is currently done using a CBT  PD must build the product

MOL The Mission Operations Laboratory Page 17 NASA MSFC Engineering Directorate Huntsville, Alabama OBT Development TST decision to use OBT (L-24 to L-12) Finalize lesson objectives (L-12) OBT delivery to COSS Integration by Payload OBTWG Rep (L-3.5 to L-2) OBT Final Product Delivery to Payload OBTWG Rep (L-3.5) Training Validation for OBT Product (L-4) Major Correctives (Delta Validation) Lesson Concept Meeting (L-12 to L-11) PD Develop OBT Product (L-11 to L-6) Pre-Training Validation Review (L-6) Close Pre Review Actions (L-6)

MOL The Mission Operations Laboratory Page 18 NASA MSFC Engineering Directorate Huntsville, Alabama Changes