Presentation is loading. Please wait.

Presentation is loading. Please wait.

NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.

Similar presentations


Presentation on theme: "NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz."— Presentation transcript:

1 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz FRR POIF/POIC Readiness Lamar Stacy Payload Operations Director Increment 19/20 Lead 256-544-2220 lamar.stacy@nasa.gov

2 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 2 POIF/POIC CoFR Overview  POIF/POIC submits CoFR endorsements to OZ/Space Station Payloads Office.  POIF/POIC CoFR requirements are defined in ISS Program Payloads CoFR Implementation Plan (SSP-52054 Rev E), Table G-1.  POIF/POIC/MOL endorsement for 18S CoFR was submitted on 17 February 2009 in memo EO03 (02-09) which was copied to Courtenay McMillan JSC/DA8.

3 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 3 Payload Manifest  New Payload activities:  Bodies In Space Environment (BISE)  New POIC capabilities  Delay Tolerant Network (DTN) command capability delivered in Enhanced HOSC Software (EHS) build 11.5.1 on 1 April.  CGBA hardware will utilize commands in the 2J/A database delivery as a test bed for DTN  The transition to the 2J/A products is scheduled earlier than normal to accommodate Program directed DTN tests in April.

4 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 4 POIF/POIC Open Work for 18S  Standard Open Work:  Payload Imagery Reqts. and Transit EvaluationECD 5 March 09  Baseline of Crew Procedures (BISE) ECD 12 March 09  Control Center tools are complete and readyECD 20 March 09  Baseline of POIC Transition Timeline to 2J/A MOPECD 20 March 09  POIC Operators are TrainedECD 25 March 09  POIC/TSC Ground I/F & software verificationECD 31 March 09  POIC to IP Control Center software verificationECD 31 March 09  TSC/PI Console Operator Training (BISE) ECD 25 March 09  POIC Transition to EHS 11.5.1 & 2J/A MOP  Payload Teams verify command/telemetry products ECD 31 March 09  DTN Specific and 2J/A Transition ECD 1 April 09  POIC/JSC Integrated Testing (MCT) ECD 17 April 09  No issues with standard open work  Non-Standard Open Work:  None

5 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 5 Summary of Flight Readiness  Pending completion of Open Work:  POIC FCT has been trained and certified.  PODF is baselined for crew and ground command procedures.  HOSC facility, remote interfaces, and EHS software are verified.  No open payload anomalies are a constraint to launch/flight.  Flight documentation is ready.  POIF/POIC has no exceptions to 18S CoFR. for Increment 19/18 Soyuz

6 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 6 Payload Acronyms BISEBodies In Space Environment CGBACommercial Genetic Bioprocessing Apparatus DTNDelay Tolerant Network ECDEstimated Completion Date EHSEnhanced HOSC Systems FCTFlight Control Team HOSCHuntsville Operations Support Center MCTMission Configuration Test MOLMission Operations Laboratory MOPMission Operations Project PIPrincipal Investigator PODFPayload Operations Data File POICPayload Operations Integration Center TSCTeleScience Center

7 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Back Up Charts CoFR Endorsements

8 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 8 CoFR Endorsements

9 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 9 CoFR Endorsements cont’d

10 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 10 CoFR Endorsements cont’d

11 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 11 CoFR Endorsements cont’d

12 NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC Page 12 CoFR Endorsements cont’d


Download ppt "NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz."

Similar presentations


Ads by Google