IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center 256-544-3869

Slides:



Advertisements
Similar presentations
SCO 3 Crewing Optimization As-Is Processes January 9, 2006
Advertisements

GOALS FOR TODAY Understand how to write a HACCP Plan
Process and Product Quality Assurance (PPQA)
Satellite Operations Center Emergency Management Update & Exercise Review 4/3/2009.
Chapter 7: Key Process Areas for Level 2: Repeatable - Arvind Kabir Yateesh.
NASA’s Goddard Space Flight Center LRO SRR Project Management.
AMS-02 Rebaselining Outbrief ISS PIA/ICD & SSP MIP/ICD ISS Payload Mission Integration & Planning/OZ2 Space Shuttle Mission & Cargo Integration Office/MO3.
Lyndon B. Johnson Space Center ISS Payload Label Approval Process Habitability & Human Factors (SF3 ) Rich Ellenberger ( )5/19/2015 ISS Payload.
Genius online Appraisal Management System 1. Appraiser Configuration Getting Started Appraisal Management let the user to effectively conduct a users.
GLAST LAT ProjectDOE/NASA Review of the GLAST/LAT Project, Aug. 14, 2001 Scott Williams 1 GLAST Large Area Telescope: Instrument Operations Center Scott.
Secure System Administration & Certification DITSCAP Manual (Chapter 6) Phase 4 Post Accreditation Stephen I. Khan Ted Chapman University of Tulsa Department.
Purpose of the Standards
Configuration Management
SQA Work Procedures.
LSU 07/07/2004Communication1 Communication & Documentation Project Management Unit – Lecture 8.
3 Dec 2003Market Operations Standing Committee1 Market Rule and Change Management Consultation Process John MacKenzie / Darren Finkbeiner / Ella Kokotsis,
Copyright 2005 Welcome to The Great Lakes TL 9000 SIG TL 9000 Requirements Release 3.0 to Release 4.0 Differences Bob Clancy Vice President, BIZPHYX,
Basics of OHSAS Occupational Health & Safety Management System
CLEANROOM SOFTWARE ENGINEERING.
Company duties under the ISM Code
Software Configuration Management (SCM)
MATTHEW MATKOVICH MINE EQUIPMENT COMPLIANCE SPECIALIST QUALITY ASSURANCE & MATERIALS TESTING DIVISION MSHA – APPROVAL & CERTIFICATION CENTER 30CFR, PART.
MAPLDDesign Integrity Concepts You Mean We’re Still Working On It? Sustaining a Design.
Certification and Accreditation CS Phase-1: Definition Atif Sultanuddin Raja Chawat Raja Chawat.
1.  Describe an overall framework for project integration management ◦ RelatIion to the other project management knowledge areas and the project life.
Commitment Process Presented by Edward B. Luers October 2008 Interplanetary Network Directorate Deep Space Network.
Forging Partnerships on Emerging Contaminants November 2, 2005 John Vandenberg Associate Director for Health National Center for Environmental Assessment.
Executive Session Director’s CD-3b Review of the MicroBooNE Project January 18, 2012 Dean Hoffer.
© Mahindra Satyam 2009 Configuration Management QMS Training.
QUALITY MANAGEMENT STATEMENT
NASA Update NDIA PMSC Quarterly Meeting February 4, 2010 Ken Poole NASA/MSFC/CS40 (Project Planning & Analysis Team)
Software Configuration Management (SCM). Product Developer Disciplines One view of the world is that there are three types of activities are required.
Constellation Space Transportation Planning Office July 30, 2009.
ESA ODFCB # 4 Peter Granseuer1 ESA ODFCB Charter Peter Granseuer MSM-EOI
Integrated Change Control 1 MEC-8. Processing of a Change Processing of a Change 2 Assess Impact within KA Change Request Implemented Change Create a.
Solar Probe Plus A NASA Mission to Touch the Sun March 2015 Instrument Suite Name Presenter's Name.
Project Management Basics
3-5 March 2004 ESA ODFCB, 3-5 March 2004 ESA Columbus Ground ODF Validation ESA ODFCB, 3-5 March 2004 Simon Challis, MSM-EO.
SRR and PDR Charter & Review Team Linda Pacini (GSFC) Review Chair.
~ pertemuan 4 ~ Oleh: Ir. Abdul Hayat, MTI 20-Mar-2009 [Abdul Hayat, [4]Project Integration Management, Semester Genap 2008/2009] 1 PROJECT INTEGRATION.
Project Management Strategies Hidden in the CMMI Rick Hefner, Northrop Grumman CMMI Technology Conference & User Group November.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama POIF End-to-End Process.
Pertemuan 14 Matakuliah: A0214/Audit Sistem Informasi Tahun: 2007.
1 Columbus Control Center - Teams and Responsibilities - Roland Luettgens ESA Columbus Lead Flight Director Tel:
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Execute Tailored Procedures (XTP) Status POIWG – July 2015 Lamar Stacy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama PROCESS REVIEW Training.
Introduction to Payload Planning Will Kirby (256)
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory EXPRESS Logisitics Carrier (ELC) Operations Overview POIWG #26, August.
July 26, 2005 Nelda Allen/Colsa1 Configuration Management Process 2 Minor Changes (pages 2 & 5)
Mission Planning Process Changes Gary Rowe Mission Planning Team Lead Teledyne Brown Engineering Presented to: Increment 3 POIWG June 13, 2001 Mission.
6/6/ SOFTWARE LIFE CYCLE OVERVIEW Professor Ron Kenett Tel Aviv University School of Engineering.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory Payload Operations and Integration Function Overview Payload Operations.
NASA MSFC Engineering Directorate Mission Operations Laboratory MSFC NASA MSFC Engineering Directorate Mission Operations Laboratory Increment 19/18 Soyuz.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama OCR Etiquette Jimmy Whitaker.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Huntsville, Alabama ISS HAM TIR OVERVIEW (Kenwood in SM only) Kathy.
MOL The Mission Operations Laboratory MOL The Mission Operations Laboratory NASA MSFC Engineering Directorate Huntsville, Alabama Safety Operations at.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory PAYCOM Cadre and PD Enablement PAYCOM 207 February 2015 – Rev H.
Software Engineering Process - II 7.1 Unit 7: Quality Management Software Engineering Process - II.
June 16, PMDIS TIM Shuttle Operations Coordinators (SOC) Roles & Responsibilities Beth Griggs Shuttle Operations Coordinator
Inventory and Stowage Overview Kay Standridge February 26, 2004 MSFC/ESA TIM #2.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory POIWG 23 Increment 17 Payload Operations Status Patricia Patterson.
NASA MSFC Mission Operations Laboratory MSFC NASA MSFC Mission Operations Laboratory First Contact Package for SLOSH #2 of 5 July 17th, 2012 The Operations.
Payload Inventory Management & Stowage Operations Processes 10/19/99 Point of Contact Gordon Boswell MSFC/POIF/OI (256)
Introduction for the Implementation of Software Configuration Management I thought I knew it all !
Food Safety Program Based on HACCP Principles by Ramadan Badran
RCA Project on Establishing a Benchmark for Assessing the Radiological Impact of Nuclear Power Activities on the Marine Environment in the Asia and Pacific.
Engineering Processes
Instrument PDR Summary of Objectives
Final Design Authorization
Software Reviews.
Presentation transcript:

IPLFOR POIF Process Review Eric Melkerson Payload Operations Director Operations Directors’ Office / EO03 Marshall Space Flight Center

IPLFOR Process OwnerProduct/OutputsCustomerSchedule TemplateProcess Documentation FD32 (EO03) Matrix with DN Status/Recommended disposition/Actions POIF Management Team~L-5.5 months (Letter to Book Managers + 60 days) SSP 58311, POH, Volume 1, SOP

IPLFOR Schedule Letter to Book ManagersBoard - 60 days Notification LetterBoard - 45 days Books due to WebconBoard - 35 days Review Start: Kickoff Review Schedule Explain each area’s roles/responsibilitiesV&V matrix Review goals of IPLFOR, IFOR & FOR Review activity definitions/PODF Board - 30 days DN cutoff dateBoard - 15 days DN screening (Includes: Inc Lead POD & Procedure ITC) Remove all DNs that do not adhere to guidelines Distribute DNs to Implementors for review Board - 14 days Assess Comments Review Approve/Disapprove/Withdraw/ID Issues ID Actions Board - 8 days Joint Ops TL Walkthru (if available) Step thru STP, ensure PODF in place for each activity Ensure GR&C in place, ensure stowage in place Ensure FDF/SODF inputs in place Activity descriptions in PODF Board - 7 days POIF DN Review Meeting CompleteBoard - 5 days IPLFOR Pre-Board MeetingBoard - 3 days IPLFOR Board Meeting Incorporate Approved CommentsBoard + 5d Repost Update to WebBoard + 10d

What is IPLFOR? Integrated Payload Flight Operations Review (IPLFOR) is a formal review of the flight operations products by the POIC Cadre and Users (PIs/PDs) Scheduled at approximately I-8.5 to I-7.5 to prepare for IFOR at I-7 Objectives of the review: –Ensure that the integrated payload ops design is compatible with all operational objectives, requirements, and constraints, and conforms with all ISSP requirements and constraints. –Verify that the payload flight operations concept and planning are properly defined and adequate to allow progressing to detailed implementation. –Verify that the cadre staffing and payload crew, cadre, and PD team training plans and schedules are adequate for proper mission preparation. –Define the detailed flight operations schedule and activities to be accomplished between the IPLFOR and Launch. –Stabilize the operation sequence assuring that the payloads’ requirements are satisfied.

POH The increment-specific payload operations products are reviewed by POIF and customers. DNs are generated to address errors in requirements implementation. DNs that correct typos, request information, or introduce new requirements will be requested to be withdrawn. Increment Lead POD reviews the DNs and dispositions each one. The DN originator (or rep) must agree to the disposition. Each Book Manager should have reviewed the DNs against their book and be prepared to make a recommendation on disposition. All DNs are posted to IPLFOR web page. The DN types are: Type I - Programmatic cost/schedule impacts, nonconformances with established program policy/guidelines, significant changes to requirements, design implementation, or project planning. Type II - Requirements, design implementation, or project planning impacts. Do not impact cost nor schedule. Technical in nature; address the generation/definition/ clarification of requirements or minor changes/deletions to established requirements. Type III - All other issues; technical errors; minor clarification of existing requirements. The review organization consists of: –Review teams (discipline teams) who: Evaluate, Combine, Approve, Approve with Changes, or Disapprove Type III DNs. Disapproved DNs will be presented to the Pre-Board with the appropriate rationale. Recommend disposition of Type II DNs to Pre-Board with the supporting rationale. Present team activities and significant issues for the Pre-Board. –Pre-Board (PLOT): May Approve, Approve with Changes, or Disapprove Type II DNs. Disapproved DNs will be presented to Pre-Board with appropriate rationale. Recommend disposition of Type I DNs to Board with the supporting rationale. Review Disapproved Type III DNs and recommend disposition to the Board with the support rationale. Summarize Team/Pre-Board activities to Board. –Board (POIF Mgmt Team): Disposition all Type I DNs. Review and disposition all Disapproved Type II and III DNs. Ensure accomplishment of IPLFOR objectives. Splinter meetings will be set up to work any DNs that require more than 5 minutes of discussion during the Pre-board meeting. The Splinter meeting chairman will report back to the Pre-board chairman with a recommendation for disposition for all DNs assigned. DNs that have an ECR in work should be approved pending the approval of the ECR.

IPLFOR Review Documentation All PODF ‘Books’ –Manual Crew Procedures - All Procedures per ODF structure and Hazard Control List –Payload Message Files –TV Ops Book –Ground Command Procedures Book (Volume 3 only) –Integrated Payload Safing Procedure –Daily Status Cue Card Payload Planning Products –Activity Definitions (in iURC) –Increment-Specific Groundrules and Constraints Safety Hazard Control Matrix Increment-Specific Payload Flight Rules Increment-Specific Payload Regulations Annex Payload Systems Manual (Volume 3 only) Cadre Ops Verification Procedures POIC Databases, Payload Science and IP Comm Loop Assignments Remote Site Connectivity Status Crew Training Status Simulation Plan EPAS inputs SODF inputs