Mississippi River Bridge Project Commission Meeting December 1, 2010 Mississippi River Bridge Project Commission Meeting December 1, 2010 Greg Horn, MoDOT.

Slides:



Advertisements
Similar presentations
St. Anthony Falls Bridge Replacement Jon Chiglo, P.E., Project Manager.
Advertisements

Caltrans, District 11 LAUREL STREET OVERCROSSING 1/16/2014.
UWF Health and Wellness Center Presented by: Rebecca Kennedy, PhD – Director, Health and Counseling Services Laine Sheppard, MD – Medical Director, Student.
National Science Foundation FY 2013/FY 2014 Budgets Marty Rubenstein CFO/Head BFA EPSCoR Project Directors and Project Administrators Meeting May 20, 2013.
ROUTE 72 BRIDGE IMPROVEMENTS TP 708 Pre-Proposal Meeting May 2, 2008.
Innovative Contracting Techniques that Consider Driver Impacts Use of A+B Bidding Presented by: David L. Kent P.E. New York State Department of Transportation.
International Federation of Consulting Engineers Speaker: Richard Kell AM FTSE BE(Hons) HonFIEAust CPEng, Director, Cardno International Pty Ltd.
A PROJECT MANAGEMENT OVERVIEW Maritime Place PMI EMERALD COAST FLORIDA CHAPTER JANUARY 21, 2014.
Economic Stimulus Status Report Rev. 11/24/10. Economic Stimulus Update PROGRAMPROJECTFUNDS AVAIL. TIME FRAME STATUS Community Dev. Block Grant New project:
OTIA III State Bridge Delivery Program CEI Tool Ron Reisdorf, PE Senior Construction Engineer Oregon Department of Transportation April 9, 2008.
Delivering Bang for Your Buck The Success of Amendment 3 November 2, 2004 to June 11, 2008.
December 6, 2012 Public Meeting. AZ Canal Multiuse Path  Construct a 10-foot concrete path along one side of the Arizona Canal from Chaparral Road to.
TEAM Training: Program Management Last Update: May 2011.
Galveston Seawall Boulevard Transit/Pedestrian Access and Beautification Program PHASE 2 IMPLEMENTATION UPDATE PHASE 2 IMPLEMENTATION UPDATE February 12,
MoDOT’s Approach to Program Management Kathy Harvey State Design Engineer Missouri Department of Transportation.
New Mississippi River Bridge EWGCOG Presentation New Mississippi River Bridge EWGCOG Presentation January 8, 2007.
DBE and Workforce Diversity Program Successes and best practices from TriMet’s Interstate MAX light rail project.
Road To Success US 41 WIS 441 Tri-County. Road To Success DBE Workshop and Secretary’s Golden Shovel Awards February 18, 2015.
Broadway Street Viaduct Improvement, Pre-Load Testing and Geotech Report Workshop Consultant Presentation Iowa DOT 2 nd April 2007.
1. Review of RFP Project Goals RFP Time Line Project Schedule RFP Type Project Budget 2. Questions? 3. Tour of New Site 4. Tour of Existing Facilities.
Choosing a building system 1. Physical limitations: Size of the land How heavy a building can the soil support How long a structural span is feasible What.
Joint AGC - Corps of Engineers Meeting Doubletree Hotel, Omaha, NE May 9, 2012 Jimmy Christianson Director, Government Affairs Federal & Heavy Construction.
Mississippi River Bridge An Analysis of Alternatives DRAFT Final Report Presentation January 31, 2007.
TIA Update-GAMPO 2015 Work Session Mike Dover, P.E. TIA Administrator, GADOT June 26, 2015.
Partnering in Federal Procurement Presented by: Joe Grabenstein September 21, 2012 MBDA Federal Procurement Center Operated by the Metropolitan Economic.
1. Project Team  Susan Barry, Project Director  Brian Burger, Deputy Project Director  James Martin  Mike Landvik  Kevin Irving, FHWA 2.
Gregory J. Horn P. E. District Engineer MoDOT Chesterfield Leadership March 4, 2014 The Road Ahead.
The Owner’s Perspective
Option #1 - Award Current Contract Fastest route to begin and complete project and achieve seismic safety Award requires funding  Option #2 - Re-bid SAS.
Greg Kelley, Assistant Deputy Director Los Angeles County Department of Public Works SOUTHERN CALIFORNIA SUSTAINABLE PAVEMENT PRESERVATION ROUND TABLE.
1 Rehabilitation of 188 th Street over Grand Central Parkway PIN: X Contract #: D Deck Replacement October 2015.
Presentation to the Little Rock SAME Small Business Symposium by LTC Mark Jernigan Deputy Commander, New Orleans District April 28, 2009 Presentation to.
It doesn’t matter what the subject is; once you’ve learnt how to study, you can do anything you want.
The Missouri Department of Transportation 2007 Update.
Safe & Sound Bridge Improvement Program. Purpose of Meeting Introduction of Team Today’s discussion  History of Safe & Sound  DBFM to MDBB/DB split.
1 BROOKHAVEN SCIENCE ASSOCIATES CF FY09 Work Plan & Schedule Martin Fallier, Conventional Facilities Division Director CFAC Review March 10-11, 2009.
Toll Bridge Seismic Retrofit Program Project Schedule and Budgets.
New Jersey Turnpike Authority November 19, 2009 New Jersey Turnpike Interchange 6 to 9 Widening Program Presented by Lisa M. Kenney, P.E. 1.
ACEC Annual Meeting Bellevue, WA June 11, 2015 Lynn Peterson Secretary of Transportation Moving Washington Forward WSDOT Linea Laird, PE Chief Engineer.
TOWN OF EDENTON NEW POLICE DEPARTMENT.
Turtle Creek Apartment Project Update Able Construction September 15, 1999.
Welcome From MODOT Dave Nichols, PE Director Of Program Delivery.
1 Florida Department of Transportation Equal Opportunity Office 2014 Disadvantaged Business Enterprise (DBE) Program & Business Development Initiative.
1. 2 February Alliance Workshop St. Louis Regonal Freightway Alliance Needs Analysis and Freight Development Committee Terminal Rail Association.
Miller Driscoll Building Committee Construction Update Thursday February 4, :00 PM - 7:00 PM Presented by: Turner Construction, CMA 1 Additions &
National Organization of Minority Engineers Metropolitan Water Reclamation District of Greater Chicago June 30, 2016.
Compliance with CCNA F.S..  Advertisement  Longlist  Shortlist  Request for Proposal  Scope of Services Meeting  Technical Proposal Review.
Bridge disasters.
The University of Massachusetts Building Authority
January 18, 2017 City of San Diego
Intergovernmental Collaboration
Community Economics Building TriMet’s Orange Line
Pre-Construction Services
Reforming prison education: where we are now
Community Economics Building TriMet’s Orange Line
Troy School District Bond Program – Series 1 Construction Update
DC Major League Ballpark Construction Report
Woodinville-Duvall Road Widening Project Update
Bridge disaster in Minnesota
2018 ASPECT PRE-CONFERENCE WDA Programs Overview and Updates
Illinois department of transportation overview
Lafayette New Terminal Program Update
MoDOT Bridge Program Fiscal Years
El Cerrito High School Stadium Project Status
March 14, 2019.
Eric Kopinski – MoDOT.
Lafayette New Terminal Program Update
HEES Wales Update 17th March 06.
Design and Engineering Services
Presentation transcript:

Mississippi River Bridge Project Commission Meeting December 1, 2010 Mississippi River Bridge Project Commission Meeting December 1, 2010 Greg Horn, MoDOT Project Director

Mississippi River Bridge Update

Main Span Awarded $230 million MO. Approach Awarded $11 million IL. Approach Awarded $47 million Bids April 2011 $42 million Multiple Bids $220 million Bids Year 2 $75 million Cass Bridge Awarded $4 million

MRB Construction Contracts 32 Total Construction Contracts 32 Total Construction Contracts 18 Contracts Awarded 18 Contracts Awarded $361 Million Under Construction $361 Million Under Construction 1% Under Budget 1% Under Budget

Mississippi River flooding

Building the foundation

Shaft Rock Cores

Concrete Delivery

Cofferdam

Business and Workforce Development

DBE Update 17.3 percent on MRB Projects 17.3 percent on MRB Projects 81 firms 81 firms 118 contracts 118 contracts $62 million in subcontracted work $62 million in subcontracted work 14 projects remaining 14 projects remaining

Workforce Update Hours worked on MRB Projects Hours worked on MRB Projects 20% minority 20% minority 6.7% female 6.7% female Federal Goals Federal Goals 14.7% minority 14.7% minority 6.9% female 6.9% female

Public Tours

Aesthetic Lighting

Mississippi River Bridge On Schedule On Schedule On Budget On Budget Opening 2014 Opening 2014

MRB Project Director Greg Horn, (314)