Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule.

Slides:



Advertisements
Similar presentations
1 Pixel Bus Development Atsushi Taketani RIKEN/RBRC 1.Who is working 2.Over view of pixel bus 3. Manufacture process 4. Issues 5. Development / Production.
Advertisements

Hybrid pixel: pilot and bus K. Tanida (RIKEN) 06/09/03 Si upgrade workshop Outline Overview on ALICE pilot and bus Requirements Pilot options Bus options.
ITS-week CERN December 3, 2001 Michel Morel CERN EP/ED.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Belle-II Meeting Nov Nov Thomas Bergauer (HEPHY Vienna) Status of DSSD Sensors.
Layer 0 Grounding Requirement in terms of noise performance Grounding/Shielding studies with L0 prototype Summary Kazu Hanagaki / Fermilab.
General needs at CERN for special PCB’s Philippe Farthouat CERN.
PHENIX Vertex Tracker Atsushi Taketani for PHENIX collaboration RIKEN Nishina Center RIKEN Brookhaven Research Center 1.Over view of Vertex detector 2.Physics.
SPD general meeting Pixel bus and Pilot MCM Integration CERN October 8, 2002.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
A multi-chip board for X-ray imaging in build-up technology Alessandro Fornaini, NIKHEF, Amsterdam 4 th International Workshop on Radiation Imaging Detectors.
1 States report for readout system 1.PHENIX readout system overview 2.High speed data link 3.Digital pilot ASIC 4.Schedule Hiroyuki
1 SBS Spectrometer / GEP5 Conf.. 2 Tracking Requirements Requirements Tracking Technology DriftMPGDSilicon High Rate: MHz/cm 2 (Front Tracker)
David L. Winter for the PHENIX Collaboration PHENIX Silicon Detector Upgrades RHIC & AGS Annual Users' Meeting Workshop 3 RHIC Future: New Physics Through.
1 CARRIER BUS LAYOUT(a) ± 193 mm ladder1ladder mm mm Pixel chip Michel Morel EP/ED 09/ x 425µ 256 x 50µ Decoupling capacitors
RC chip Junji Tojo RIKEN VTX Meeting February 9 th, 2005.
Electrical Integration WBS Eric J. Mannel Columbia University Electronics Project Engineer VTX and FVTX.
16 – 17 Jul 02Andrew Werner TRD Monitor Tube Readout Electronics: Shaping Peter Fisher, Bernard Wadsworth, Andrew Werner MIT 1.
Modifications to the Pixel ROC Hans-Christian Kästli.
SLHC Pixel Layout Studies S. Dardin, M. Garcia-Sciveres, M. Gilchriese, N. Hartman LBNL November 4, 2008.
PHENIX Silicon Pixel Detector Construction, Operation, and the first Results Atsushi Taketani RIKEN Nishina center RIKEN Brookhaven Research Center Outline.
High Density Interconnect (WBS 1.4.3) Extension Cables (WBS 1.4.4) Douglas Fields University of New Mexico Douglas Fields, FVTX DOE Review November 17,
Columbia University IN THE CITY OF NEW YORK ROC3' / preproduction ROC Design Status E.J. Mannel StriPixel Review October 1, 2008.
Pixel hybrid status & issues Outline Pixel hybrid overview ALICE1 readout chip Readout options at PHENIX Other issues Plans and activities K. Tanida (RIKEN)
Frontend of PHENIX Si pixel K. Tanida (RIKEN) FEM/DAQ meeting for PHENIX upgrade (10/24/02) Outline Overview of PHENIX Si pixel detector ALICE1 chip readout.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
Update on the HBD Craig Woody BNL DC Meeting June 8, 2005.
— Test board for CBM01B2 baby detectors — Anton Lymanets & Johann Heuser CBM collaboration meeting GSI, 27 February 2008 Microstrip detector testing at.
Phase 2 Tracker R&D Background: Initial work was in the context of the long barrel on local tracklet- based designs. designs of support structures and.
EP/ED group meeting1 ALICE PIXELS DETECTOR.
MWPC sandwich panels C.Forti INFN-LNF / LHCb-MUON EDR CERN 16 th April sandwich panels typologies of cathodes the mould the production procedure.
1 PreFPIX2 Inner board and test beam triggering Gabriele Chiodini Fermilab - Jan 07, 02.
Specifications & motivation 2  Lowering integration time would significantly reduce background  Lowering power would significantly reduce material budget.
Module Development Plan I believe that we are ready to proceed to a program to demonstrate a PS module based on “2.5 D” interconnections. This is based.
Trace connecting two pads! More than 45 degree bends Traces too close together Rule of thumb: traces at least 40 mil apart.
06/02/02CERN - LARG meeting1 CALIBRATION BOARD STATUS  Status of the DMILL chips used on the calib. boards  Low Offset Op Amps: Offset measurements 
Thin Silicon R&D for LC applications D. Bortoletto Purdue University Status report Hybrid Pixel Detectors for LC.
FPCCD option Yasuhiro Sugimoto 2012/5/24 ILD 1.
Mar. 18, 2009 HAPD ASIC Status Super KEKB Meeting 1 S.Nishida (KEK) S. Nishida HAPD ASIC Status Super KEKB Meeting Mar. 18, 2009 KEK.
AMS HVCMOS status Raimon Casanova Mohr 14/05/2015.
Low Mass Rui de Oliveira (CERN) July
BTeV Hybrid Pixels David Christian Fermilab July 10, 2006.
Solid State Detectors for Upgraded PHENIX Detector at RHIC.
ASIC Activities for the PANDA GSI Peter Wieczorek.
Walter Sondheim 6/2/20091 DOE – Review of VTX upgrade detector for PHENIX Mechanics: Walter Sondheim - LANL Mechanical Project Engineer.
TIMELINE FOR PRODUCTION 2  Need to be ready for production end next year  => submission of final mask set ~September 2015  Would like one more iteration.
D. M. Lee, LANL 1 07/10/07 Forward Vertex Detector Overview Technical Design Overview Design status.
Pixel detector development: sensor
Circles Shape and Space. Formula for the area of a circle We can find the area of a circle using the formula radius Area of a circle = πr 2 Area of a.
Leo Greiner IPHC1 STAR Vertex Detector Environment with Implications for Design and Testing.
DETECTOR PIXEL CHIP MCM PIXEL BUS COOLING TUBE PIXEL BUS AND PILOT MCM CONNECTIONS (1) SDM comp LASER DIODE Space reserved (15mm) for connections.
Pixel Atsushi Taketani RIKEN RIKEN Brookhaven Research Center 1.Overview of Pixel subsystem 2.Test beam 3.Each Components 4.Schedule 5.Summary.
Robert Pak VTX Meeting June 3, Robert Pak 1 VTX Meeting June 3, 2005 General Progress Started general integration meetings for detector upgrades.
R. Bradford 10 December, 2014 Sensor Details. Explanation Submitted some designs that will be included on the Novati/Tezzaron submission. Designs based.
Chiho Wang ATLAS TRT Istanbul Workshop Duke University May, Fuse Boxes Chiho Wang Duke University.
Rene BellwiedSTAR Tracking Upgrade Meeting, Boston, 07/10/06 1 ALICE Silicon Pixel Detector (SPD) Rene Bellwied, Wayne State University Layout, Mechanics.
Columbia University IN THE CITY OF NEW YORK VTX Electronics Integration E.J. Mannel Columbia University DOE Review June 2-3, 2009.
Upgrade with Silicon Vertex Tracker Rachid Nouicer Brookhaven National Laboratory (BNL) For the PHENIX Collaboration Stripixel VTX Review October 1, 2008.
Dimensioning © 2011 Project Lead The Way, Inc.Design and Modeling.
B => J/     Gerd J. Kunde PHENIX Silicon Endcap  Mini-strips (50um*2mm – 50um*11mm)  Will not use ALICE chip  Instead custom design based on.
Noise & Grounding Andrei Nomerotski (U.Oxford) 17 July 2007.
Si Sensors for Additional Tracker
Status on INTT bus extender R&D
Silicon Pixel Detector for the PHENIX experiment at the BNL RHIC
TPC electronics Atsushi Taketani
RPC FEE The discriminator boards TDC boards Cost schedule.
Presentation transcript:

Atsushi Taketani 2005/06/03 VTX meeting 1 PIXEL BUS status 1.Circuit design 2.Design rule and design 3.Schedule

Atsushi Taketani 2005/06/03 VTX meeting 2 Prototype Design Two completely independent bus with two digital pilot, analog pilot, and GOL Readout Chip Sensor Pixel Bus SPIRO Digital Pilot Analog pilot GOL

Atsushi Taketani 2005/06/03 VTX meeting 3 Each Readout chip logic diagram for PHENIX PIXEL

Atsushi Taketani 2005/06/03 VTX meeting 4 Bus connection to SPIRO logic diagram for PHENIX PIXEL

Atsushi Taketani 2005/06/03 VTX meeting 5 Circuit Design A few minor change Value of bias filtering capacitor. ( larger) Number of bypass capacitor ( under discussion )

Atsushi Taketani 2005/06/03 VTX meeting 6 Design rule 70  m line width, 50  m space Through hole 50  m diameter and100  m land size. Connection pad 200  m width. Bending radius 20mm. HV bias(<100V) will be isolated from other line.

Atsushi Taketani 2005/06/03 VTX meeting 7 Dimensions Bus width 15mm. Length 10cm ( Sensor ) + 15cm(extention)

Atsushi Taketani 2005/06/03 VTX meeting 8 Layer 1 and Layer 2 Layer 3 Bus with Sensors extension connection As of May 20, I discussed with SOLITON Co.

Atsushi Taketani 2005/06/03 VTX meeting 9 Layout Several iteration of design Final review in next week ( June 9 th )

Atsushi Taketani 2005/06/03 VTX meeting 10 Schedule Finalize layout in next week. Cu bus fabrication in a month Al bus for 2 month after Cu bus. After finalize Bus, we will start to design Cu extender with layout engineer.