The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in.

Slides:



Advertisements
Similar presentations
The Detector Control System – FERO related issues
Advertisements

Sezione di Bari September 16, 2002D. Elia - DCS workshop / ALICE week 1 SPD PS system and Controls Domenico Elia, INFN-Bari.
SPD DCS Status Report Ivan Amos Calì Università degli studi di Bari / CERN 15 th ALICE DCS Workshop.
The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
CPV DCS STATUS REPORT Mikhail Bogolyubsky (IHEP, Protvino) Serguei Sadovsky (IHEP, Protvino) CERN, DCS meeting, 30 January, 2007.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
P. Paolucci - I.N.F.N. di Napoli / Joint RPC-Trigger meeting HV-LV-DCS Status DCS barrel:G. Polese and P. Paolucci DCS endcap:A. Cimmino and.
André Augustinus ALICE Detector Control System  ALICE DCS is responsible for safe, stable and efficient operation of the experiment  Central monitoring.
1 ALICE Detector Control System (DCS) TDR 28 January 2004 L.Jirdén On behalf of ALICE Controls Coordination (ACC): A.Augustinus, P.Chochula, G. De Cataldo,
Test Systems Software / FEE Controls Peter Chochula.
Clara Gaspar, May 2010 The LHCb Run Control System An Integrated and Homogeneous Control System.
09/12/2009ALICE TOF General meeting 1 Online Controls Andrea Alici INFN and Universtity of Bologna, Bologna, Italy ALICE TOF General Meeting CERN building.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
MDT PS DCS for ATLAS Eleni Mountricha
1 ALICE Control System ready for LHC operation ICALEPCS 16 Oct 2007 L.Jirdén On behalf of the ALICE Controls Team CERN Geneva.
The ALICE Silicon Pixel Detector Gianfranco Segato Dipartimento di Fisica Università di Padova and INFN for the ALICE Collaboration A barrel of two layers.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
20/10/2008A. Alici - ALICE TOF Festival1 Electronics and data acquisition of the ALICE TOF detector A.Alici University and INFN, Bologna.
ALICE DCS Workshop 28/29 May 2001 Vito Manzari, INFN Bari SSD (Silicon Strip Detector) SDD (Silicon Drift Detector) SPD (Silicon Pixel Detector) Detector.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
SALTRO TPC readout system Presented by Ulf Mjörnmark Lund University 1.
DCS T0 DCS Answers to DCS Commissioning and Installation related questions ALICE week T.Karavicheva and the T0 team T0 DCS Answers to.
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
1 Jan Conrad (CERN) PSD Liverpool, Sept (CERN) Beam Test Performance and Simulation of Prototypes for the ALICE Silicon Pixel.
P. Chochula ALICE Week Colmar, June 21, 2004 Status of FED developments.
Controls EN-ICE Finite States Machines An introduction Marco Boccioli FSM model(s) of detector control 26 th April 2011.
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
Clara Gaspar, March 2005 LHCb Online & the Conditions DB.
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Bruno Belbute, October 2006 Presentation Rehearsal for the Follow-up meeting of the Protocol between AdI and CERN.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
ACC ? Detector PVSS II Ethernet Database(s) OPC client DIM client High VoltageLow Voltage User interface PVSS II LV PMD Control room (ACR) [FSM?]
ALICE Pixel Operational Experience R. Santoro On behalf of the ITS collaboration in the ALICE experiment at LHC.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Management of the LHCb Online Network Based on SCADA System Guoming Liu * †, Niko Neufeld † * University of Ferrara, Italy † CERN, Geneva, Switzerland.
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS overview - L.Jirdén1 ALICE ECS/DCS – project overview strategy and status L.Jirden u Organization u DCS system overview u Implementation.
CMS ECAL DCS 10.Oct S.Zelepoukine ICALEPCS CMS ECAL DCS 1 The Detector Control System for the Electromagnetic Calorimeter of the CMS Experiment.
24/03/2010ALICE TOF General Meeting March TOF hardware and data taking 2010 Andrea Alici Museo Storico della Fisica e Centro Studi e Ricerche “Enrico.
Clara Gaspar, April 2006 LHCb Experiment Control System Scope, Status & Worries.
The Silicon Pixel Detector (SPD) is part of the Inner Tracking System (ITS) of the ALICE experiment. ALICE is designed to study the properties of strongly.
T0 DCS Status DCS Workshop March 2006 T.Karavicheva on behalf of T0 team.
22/May/02 JCOP meeting G. De Catatldo-A.Franco INFN Bari Italy 1 The Control System of the HMPID up to the end of 2001 ; 2002: The FSM toolkit, Hierarchy.
DCS workshop,march 10th P.Saturnini, F. Jouve Slow control trigger of the muon arm Muon trigger of the muon arm Low voltage VME Crate External parameters.
E Ethernet C CAN bus P Profibus HV HV cables LV LV cables (+busbar) S Serial (RS232) Signal cable Other/Unknown Liquid or Gas Cable and/or Bus PCI-XYZ.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
ALICE. 2 Experiment Size: 16 x 26 meters (some detectors >100m away from IP) Weight: 10,000 tons Detectors: 18 Magnets: 2 Dedicated to study of ultra.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
SPD DCS Overview & FED Server
Peter Chochula Calibration Workshop, February 23, 2005
SPD – ALICE DAQ/ECS/Trigger Integration Status Report
The LHCb Run Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
RPC Detector Control System
RPC Detector Control System
TPC Detector Control System
RPC Detector Control System
The IFR Online Detector Control at the BaBar experiment at SLAC
The Online Detector Control at the BaBar experiment at SLAC
HV-LV-DCS Status NEWS DCS Endcap Integration
RPC Detector Control System
RPC Detector Control System
Pierluigi Paolucci & Giovanni Polese
Pierluigi Paolucci & Giovanni Polese
Multi Chip Module (MCM) The ALICE Silicon Pixel Detector (SPD)
Pierluigi Paolucci & Giovanni Polese
Presentation transcript:

The ALICE Silicon Pixel Detector Control system and Online Calibration tools Ivan Amos Calì (a,b) On behalf of the SPD Project in the ALICE Collaboration 12th Workshop on Electronics for LHC and Future Experiments Valencia, Spain, 25 – 29 September 2006 (a) Dipartimento di Fisica e Sez. INFN di Bari, I-70126, Bari, Italy (b) CERN - European Organization for Nuclear Research, CH-1211Geneva 23, Switzerland

LECC06, 27 September 2006Ivan Amos Calì 2 Outlook ALICE Silicon Pixel Detector (SPD) structure Detector Control System overview SPD Online calibration scenarios Detector commissioning at the Divisional Silicon Facility (DSF) at CERN and software benchmark Summary

LECC06, 27 September 2006Ivan Amos Calì 3 Inner Tracking System (ITS) Strips Silicon Drift Pixels ITS

LECC06, 27 September 2006Ivan Amos Calì 4 SPD - Silicon Pixel Detector Number of pixel: ~10 M Total material budget <1% X 0 per layer Operating temperature: 25°C Cooling: C 4 F 10 (evaporative) Power consumption:~1.5kW 2 barrel layers 10 sectors Total surface: ~0.24m 2 Δz= 28.3 cm r= 3.9 cm & 7.6 cm Beampipe-SPD: at ~ 5mm Charged particle multiplicities up to 8000/η and expected occupancy <2% (central Pb-Pb)

LECC06, 27 September 2006Ivan Amos Calì 5 SPD Readout and Control System Pixel bus Routers Triggers (L1, L2y, L2n, testpulse), jtag Counting room el.Pilot MCM control transmit pilot Opt. link Pixel chip 0 Pixel chip 9 reference voltages data receiver G-link GOL link receiver daughter card ALICE DAQ, Trigger & DCS ON DETECTOR EL. OFF DETECTOR EL. Opt. links 1200 Readout Chips 240 Sensors 120 Pilot MCMs 120 Half Staves (HS) 60 Link Receiver Cards 20 Router Cards

LECC06, 27 September 2006Ivan Amos Calì 6 SPD R/O & Services Optical VME Ethernet Software Hardware 1 x Interlock & Temperature Monitoring PLC PVSS Interlock control PVSS PS control 4 x CAEN Easy3000 crates (tot. 20 x A3009B 12 ch. LV Modules) 1 x CAEN Mainframe SY1527 (1 x A1676 Branch Controller & 10 x A1519B 12 ch. HV Modules) 1 x Cooling Plant (10 cooling lines) 1 x Cooling PLC PVSS Cooling Control The data stream is forwarded to the FED Servers during the SPD calibration PVSS FED control 20 x SPD Routers (3 x LinkRxs each) 2 x FED Servers The Pixel Trigger System must be integrated in the SPD control structure

LECC06, 27 September 2006Ivan Amos Calì 7 SPD Finite State Machine Hierarchy SPD DCS Infra FED Power HVLV Cooling LV (HSn) 0-1 HV (HSn) Sector0-9 HSect.0-1 HS0-5 FED (HSn) Cooling (Sect n) HSnPowerInterlock State Management Interface ++ (SMI++) based The 1 st level of safety is provided by PVSS background scripts 31 Control Units 245 Logical Units 625 Device Units 5 Working Node and 5 independent PVSS projects DU CU LU

LECC06, 27 September 2006Ivan Amos Calì 8 SPD DCS Capability I Automatic HSs power-up and power-down sequence Control, monitor and archive of the 240 LV & 120 HV channels voltages and currents Readout of 250 temperature monitor chains Configuration of the on-detector & off-detector electronics (run type dependent: i.e. PHYSICS, CALIBRATION, BEAM TUNING, etc. ) Data synchronization monitor Self-diagnostic capability of the system (H/W & S/W)

LECC06, 27 September 2006Ivan Amos Calì 9 SPD DCS Capability II Detector calibration and automatic operational parameters fine tuning Automatic online calibration data analysis Configuration and Condition (offline) DB interconnection The SPD DCS is capable to emulate the ALICE DAQ and Trigger system during specialized calibration runs

LECC06, 27 September 2006Ivan Amos Calì 10 Interlocks T interlock Routers (HSectors, Pt1000) T interlock PLC (HSectors, Pt1000) Cooling line T sensors (Sectors, Pt1000) Cooling plant (General Alarm) SPD Interlock Card (combinatory logic) LV Modules (HSector granularity) Software interlocks Sensors leakage currents trends Temperature trends (Routers & Interlock PLC)

LECC06, 27 September 2006Ivan Amos Calì 11 SPD calibration parameters – Pixel matrix uniformity and efficiency of response – Noisy and dead pixels identification – DACs fine tuning – Minimum and Mean threshold scans – References voltages parameterization

LECC06, 27 September 2006Ivan Amos Calì 12 RO Electronics Data & Ctl Optical VME Ethernet (DIM) PVSS Archives PVSS FED control Comm.& Status Data Config. DB FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) Online Analysis Tool (ROOT based) Condition DB DCS Exchange FS DCS network To Permanent Data Storage (PDS) General purpose network SPD Calibration Scenario 1 DCS Standalone emulate Alice Trigger and DAQ system Run number provided by Experiment Control System (ECS) for synchronization

LECC06, 27 September 2006Ivan Amos Calì 13 ALICE DAQ SPD Calibration Scenario 2 Control Data Optical VME Ethernet (DIM) PVSS FED control Comm.& Status Config. DB FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) FED Servers (x2) Condition DB DAQ Exchange FS Extra data header produced inside the routers to delivery information to the analysis scripts DCS emulate Alice trigger system RO Electronics Monitoring Programs (MOOD & Calib. Data Displ) Local Data Collector (LDC) Analysis Scripts0 DCS network To Permanent Data Storage (PDS) DAQ network

LECC06, 27 September 2006Ivan Amos Calì 14 DSF “Control Room” 2 FED Servers PS control Cooling ControlAnalysis tool & Interlock, T monitor system FED control

LECC06, 27 September 2006Ivan Amos Calì 15 Trigger and DAQ setup at DSF Trigger Crate Routers Crates 2 LDC equipped with 10 D-RORCs Software: – DATE v5.14 – ECS v2.8

LECC06, 27 September 2006Ivan Amos Calì 16 SPD sectors and services in DSF SPD Sectors Power Supply System Cooling System

LECC06, 27 September 2006Ivan Amos Calì 17 Experiment Control System Integration SPD FSM top node integrated in the ECS PCA States and action recognized by ECS Calibration structure tested A series of calibration runs have been developed using SPD sectors.

LECC06, 27 September 2006Ivan Amos Calì 18 Summary The Detector Control System is operative and is used for the sectors characterization at the DSF The automatic calibration procedures have been prototyped and benchmarked at the DSF DCS integration in the ALICE framework is undergoing The detector integration and commissioning is ongoing at the DSF

LECC06, 27 September 2006Ivan Amos Calì 19 BACKUP

LECC06, 27 September 2006Ivan Amos Calì 20 Uniformity scans using DAQ Displayer: MOOD

LECC06, 27 September 2006Ivan Amos Calì 21 HS Test sequence

LECC06, 27 September 2006Ivan Amos Calì 22 SPD FSM Top Node OFF STANDBY {mode} READY PHYSIC Startup{ mode} standby_ physic go_physic shutdown set_mode {mode} CALIBRATION {cal_mode} Standby_calibration go_calibration{cal_mode, run_n} cal_mode: Minimum TH Scan – (DCS_ONLY_MIN_TH_SCAN) – (DAQ_MIN_TH_SCAN) Mean TH Scan – (DCS_ONLY_MEAN_TH_SCAN) – (DAQ_MEAN_TH_SCAN) Uniformity Matrix Scan – (DCS_ONLY_UNIFORMITY_SCAN) – (DAQ_UNIFORMITY_SCAN) Noisy pixels – (DCS_ONLY_NOISY_PIX_SCAN) – (DAQ_NOISY_PIX_SCAN) mode: – PHYSICS – CALIBRATION – MCM_ONLY – BEAM_TUNING run_n is the run number provided by the ECS in case of DCS_ONLY calibration runs

LECC06, 27 September 2006Ivan Amos Calì 23 Glossary ECS: Experiment Control System DCS: Detector Control System FED: Front End Device FERO: Front End ReadOut Electronics PCA: Partition Control Agent ECA: Experiment Control Agent DIM: Data Interschange manager

LECC06, 27 September 2006Ivan Amos Calì 24 SPD DCS III HS cooling HS FED

LECC06, 27 September 2006Ivan Amos Calì 25

LECC06, 27 September 2006Ivan Amos Calì 26 Cooling System II

LECC06, 27 September 2006Ivan Amos Calì 27 FED PVSS Layer II

LECC06, 27 September 2006Ivan Amos Calì 28 Analysis tool Interface to PVSS and FED server fully operative Uniformity of response and noisy scans analysis operative Results recorded to files