ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests.

Slides:



Advertisements
Similar presentations
Presumed Asbestos Training Programme. Introduction Getting Started The Interface Top Tool Bar Creating a New Site Type I Survey Type II Survey Type III.
Advertisements

SNS Integrated Control System SNS RDB Requirements, wish list, status A little history l Oracle RDB used exclusively by accelerator physics group l JERI.
CBM slow controls CBM collaboration meeting DAQ work group CBM collaboration meeting DAQ work group Burkhard Kolb GSI1.
© Tally Solutions Pvt. Ltd. All Rights Reserved 1 Shoper 7.2 Interface with Tally.ERP 9 January 2010.
Kondo GNANVO Florida Institute of Technology, Melbourne FL.
Multi-DNC Data Collection/Monitoring
March 24-28, 2003Computing for High-Energy Physics Configuration Database for BaBar On-line Rainer Bartoldus, Gregory Dubois-Felsmann, Yury Kolomensky,
Detector Control System at the GIF++ A. Polini, M. Romano (AIDA+INFN Bologna) on behalf of WP group Gif++ User Meeting 11/07/2014 Outline Status.
Brian Martlew 25 th Sept 2006 MICE Control & Monitoring Plan Brian Martlew.
Pocket Multi-channel Signal Analyzer IIntroduction Key Features Applications Key Specifications Hardware Connections.
New Features of APV-SRS-LabVIEW Data Acquisition Program Eraldo Oliveri on behalf of Riccardo de Asmundis INFN Napoli [Certified LabVIEW Developer] NYC,
Students: Nadia Goshmir, Yulia Koretsky Supervisor: Shai Rozenrauch Industrial Project Advanced Tool for Automatic Testing Final Presentation.
TrendReader Standard 2 This generation of TrendReader Standard software utilizes the more familiar Windows format (“tree”) views of functions and file.
Managing Software using RPM. ♦ Overview In Linux, Red Hat Package Manager referred as RPM is a tool used for managing software packages and its main function.
Lesson 6 Operating Systems and Software
IMMW14, Ferney Voltaire, September 2005 (slide 1/35) Experience with configurable acquisition software for magnetic measurement.
AnDY Hardware. Run 12 Layout Detector set: – ZDCs, BBC-Y, BBC-B, PreShower phase 1, Ecal phase-1, Hcal phase-2.
SC84, Epics C# Library Written by Christoph Seiler Presented by Dirk Zimoch.
CCS APPS CODE COVERAGE. CCS APPS Code Coverage Definition: –The amount of code within a program that is exercised Uses: –Important for discovering code.
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
IMPLEMENTATION OF SOFTWARE INPUT OUTPUT CONTROLLERS FOR THE STAR EXPERIMENT J. M. Burns, M. Cherney*, J. Fujita* Creighton University, Department of Physics,
Installing and Using Active Directory Written by Marc Zacharko.
A U.S. Department of Energy Office of Science Laboratory Operated by The University of Chicago Argonne National Laboratory Office of Science U.S. Department.
ALICE DCS Meeting.- 05/02/2007 De Cataldo, Franco - INFN Bari - 1 ALICE dcsUI Version 3.0 -dcsUI v3.0 is ready and will be soon posted on the ACC site.
Online Calibration of the D0 Vertex Detector Initialization Procedure and Database Usage Harald Fox D0 Experiment Northwestern University.
DC12 Commissioning Status GOALS: establish operating conditions, determine initial calibration parameters and measure operating characteristics for the.
Thomas Jefferson National Accelerator Facility Page 1 Hall B Drift Chambers Review, March 2007 George Jacobs Jefferson Lab Hall B 12 GeV Upgrade Drift.
PHENIX Simulation System 1 December 7, 1999 Simulation: Status and Milestones Tarun Ghosh, Indrani Ojha, Charles Vanderbilt University.
Managed by UT-Battelle for the Department of Energy Kay Kasemir ORNL/SNS Jan Control System Studio, CSS Overview.
The Commissioning of the CLAS12 Detector V. Burkert, D. Carman, R. De Vita, D. Weygand CLAS12 workshop, June 21 st 2011.
JANA and Raw Data David Lawrence, JLab Oct. 5, 2012.
Hall D Online Meeting 27 June 2008 Fast Electronics R. Chris Cuevas Jefferson Lab Experimental Nuclear Physics Division 12 GeV Trigger System Status Update.
DAQ WS03 Sept 2006Jean-Sébastien GraulichSlide 1 Control and Monitoring Summary of DAQ WS III o General Architecture o RF System C&M o D0 EPICS extensions.
HBD HV Control and Monitoring System STATUS UPDATE Manuel Proissl HBD Meeting 09/30/2008.
OPERATING SYSTEM - program that is loaded into the computer and coordinates all the activities among computer hardware devices. -controls the hardware.
ONCS Presentation Run control from user’s perspective Common Toolbox Interface to RHIC control C.Witzig PHENIX Core Week June 9, 1999
André Augustinus 16 September 2002 PVSS & Framework How to get started.
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
News on GEM Readout with the SRS, DATE & AMORE
DØ Online16-April-1999S. Fuess Online Computing Status DØ Collaboration Meeting 16-April-1999 Stu Fuess.
Online Reconstruction 1M.Ellis - CM th October 2008.
Transversity Readiness and Timeline Xiaodong Jiang, March 17th, This document specifies the overall readiness for Hall A experiments E06-010/E
Linda R. Coney – 5 November 2009 Online Reconstruction Linda R. Coney 5 November 2009.
Source Controller software Ianos Schmidt The University of Iowa.
MINERvA Status Report Deborah Harris, Gabe Perdue, Kevin McFarland, Jorge Morfin October 15, 2009.
BIF713 Operating System Concepts MS Windows. Agenda 1. What is an Operating System (definition)? 2. Types of Operating Systems 3. Basic Operations: –
MICE CM28 Oct 2010Jean-Sebastien GraulichSlide 1 Detector DAQ o Achievements Since CM27 o DAQ Upgrade o CAM/DAQ integration o Online Software o Trigger.
When the program is first started a wizard will start to setup your Lemming App. Enter your company name and owner in the fields designated “Company Name”
ECS and LS Update Xavier Vilasís-Cardona Calo Meeting - Xvc1.
Linux Operations and Administration
TDAQ Experience in the BNL Liquid Argon Calorimeter Test Facility Denis Oliveira Damazio (BNL), George Redlinger (BNL).
Status of PHENIX Drift Chamber Drift Chambers (DC) are one of the vital components of PHENIX central arms. During the last RHIC Run3 the major activities.
DAQ Status & Plans GlueX Collaboration Meeting – Feb 21-23, 2013 Jefferson Lab Bryan Moffit/David Abbott.
Plans to Test HBD Prototype in Run 6 Craig Woody BNL DC Meeting March 8, 2006.
1 Tracker Software Status M. Ellis MICE Collaboration Meeting 27 th June 2005.
Overview of PHENIX Muon Tracker Data Analysis PHENIX Muon Tracker Muon Tracker Software Muon Tracker Database Muon Event Display Performance Muon Reconstruction.
Preparations to Install the HBD for Run 6 Craig Woody BNL PHENIX Weekly Meeting January 26, 2006.
GlueX Collaboration May05 C. Cuevas 1 Topics: Infrastructure Update New Developments EECAD & Modeling Tools Flash ADC VXS – Crates GlueX Electronics Workshop.
Software tools for digital LLRF system integration at CERN 04/11/2015 LLRF15, Software tools2 Andy Butterworth Tom Levens, Andrey Pashnin, Anthony Rey.
ORNL is managed by UT-Battelle for the US Department of Energy Status Report: Data Acquisition and Instrument Controls for the Spallation Neutron Source.
SNS Integrated Control System ORACLE –JERI DB Generation April 27, 2004 Coles Sibley Jeff Patton.
Written by : Oren Frenkel Intel Confidential ® C CD SDS.
Chapter Objectives In this chapter, you will learn:
Operating System Concepts
09/02/2006 Muon week HV and LV systems status for Magnet Test S. Braibant, P. Giacomelli, M. Giunta.
ATF/ATF2 Control System
CLAS12 Calibration and Commissioning (CALCOM)
Tracker Software Status
AC701 Power Bus Reprogramming
The Online Detector Control at the BaBar experiment at SLAC
Presentation transcript:

ONCS Subsystem Status Chris Witzig (BNL), Stephen Pate (NMSU) DC Meeting PHENIX Collaboration Week 22-June-1998 Chain Test Software Subsystem Support Tests Counting House Computing High Voltage

PHENIX Chain Test Software ONCS has obtained access to various “real” PHENIX hardware such as a Master Timing board, Granule Timing board, Programmable Pulse Generator, DCM ONCS control software for these boards has been developed within the context of the ONCS control environment (CORBA) ONCS is very close to having a complete setup of a PHENIX chain (DC FEM, timing system and DCM) and will use this to finish release 1 - a standalone version of the one-granule-DAQ system

Example: Granule Timing board from Netscape

ONCS DAQ support for the Subsystems PDAQ is a small but powerful data acquisition system which ONCS has provided for the tests made by the subsystems Applications so far: TEC test beam at the AGS Magnet mapping prototype (PEH) Lead Glass gain pre-calibration and test (902) Drift chamber FEM board test (Stony Brook) TEC Pre-amp/Shaper board test (Instrumentation) Pad chamber prototype cosmic stand (820) TEC gain test (832)

PDAQ in the TEC Test beam setup of April ‘97 This was the (successful!) first field test of the PDAQ system back in April 1997

The Magnet Mapping Test Setup For the magnet mapping we turn a frame (“mapping fixture”) equipped with hall probes in the volume of the field. This system was used to read out 96 digital voltmeter channels measuring the hall probes. In addition, we read out an angle encoder to measure the angle of the mapping fixture.

ONCS support for the Subsystems This is just to show that PDAQ is used as a workhorse in many different setups.

Counting House Computing Environment (1) Decision has been taken to use as ONCS supported platforms: –Sun/Solaris –PCs running Linux (red hat) This choice is compatible with RCF The intent is to make it easy to develop code at RCF and run in the counting house (and vice versa)

Counting House Computing Environment (2) Goal is to provide a good computing infrastructure in the counting house as early as possible First computers to be installed in late June/early July 10 PCs running Linux, 4-6 Sparcstations, Sun Enterprise 3000 (== main ONCS computer), Xterminals, printers, FAX,... by Oct 98

The CLAS Experiment of Hall B at Jefferson Lab and PHENIX at RHIC both chose to use LeCroy 1458 high voltage hardware. We have also both chosen to use the EPICS controls system for our ancillary systems. An EPICS-based system for controlling the LeCroy high voltage hardware has already been written at CLAS, and we have been allowed to port this software to PHENIX. Thanks to Mark Ito of CLAS for all his help in the porting process! High Voltage Status

Jefferson Lab High Voltage Software An ASCII configuration file, giving addressing, voltage and current limits, and other info, is created by the user. This configuration file is used to create both the database in the IOC and a graphical user interface (GUI). Saving, restoring, alarm handling, channel enable and disable, HV crate on/off, and other functions can all be handled from this GUI (see next two slides). In addition, various EPICS tools permit scripts to manipulate the entries in the database, so that changes in large numbers of high voltages channels, such as in an iterative calibration procedure, can be done automatically.

This “main menu” lists each detector as a “group” for which various functions (save, restore, alarms, enable/disable) are available. For each HV crate, there is an on/off button (just one in this test setup). Clicking on the “details” button for a group gives a display like that on the next slide….

This detail window shows the individual voltages and currents for three channels in this test setup. Enable/disable functions are available both for individual channels and for the whole group. The demand voltage can be changed by entering a new number in the “Set Vol.” field.

HV Modules Supported fully supported now soon some work required, since JLab never supported this module

HV To-Do List Convert from EPICS 3.12 to 3.13 (Mark Ito) Graphical User Interface (SP) Module Support (CW + Student) Documentation and Education (SP, CW)