15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford.

Slides:



Advertisements
Similar presentations
SPACE PRODUCT ASSURANCE
Advertisements

News from B180: DC-DC Stavelet with HV MUX One hybrid shows ~20ENC extra noise, others much the same. Not yet understood - investigations continue Carlos.
Muon EDR: Chamber design M2/3 R1/2 16/04/20031T.Schneider/LHCb Muon EDR 1.General description - AW read out -Cathode pad read out -HV supply 2.Details.
2x2 module & stave layouts. 2 options “Small chip” “Big chip” Boundary between “small” and “big” is determined by the 6” sensor wafer layout that must.
Stave Vacuum Tool Tim WP4 Face to Face Liverpool, 13/11/14.
US Bracket Support for Stave D. Lynn (BNL), LBNL Mechanical Meeting, Sep
Background to the current problem 1. As a result of the high stresses in the bobbin due to the magnet load, the bobbin end plate needs to be increased.
1 Module and stave interconnect Rev. sept. 29/08.
Printed Circuit Board Design

Stave core assembly Stephanie Yang WP4 face to face meeting, Lancaster University 20 Feb 2014.
STATUS OF THE CRESCENT FLEX- TAPES FOR THE ATLAS PIXEL DISKS G. Sidiropoulos 1.
VELO upgrade electronics – HYBRIDS Tony Smith University of Liverpool.
SLHC - WP7 Barrel UPDATE on LAYOUT OF SERVICES AT THE BARREL ENDS OPTO PCBS: Sketches describe options after discussion with Tony Weidberg ( ) Preference.
WP7&8 Progress Report ITS Plenary meeting, 23 April 2014 LG, PK, VM, JR Objectives 2014 and current status.
SVX4 chip 4 SVX4 chips hybrid 4 chips hybridSilicon sensors Front side Back side Hybrid data with calibration charge injection for some channels IEEE Nuclear.
17/06/2010UK Valencia RAL Petals and Staves Meeting 1 DC-DC for Stave Bus Tapes Roy Wastie Oxford University.
CVD PCB, first steps. 15 mm 25 mm Chip area. No ground plane underneath the chip. Bulk isolated => only one ground line Power lines Connector: 11,1mm*2,1mm:
Update on alignment kit and stave 250 frame M.Gibson (RAL) 1.
ROSIER Ph End cap – TPC - LC DRAFT Definition of the front-end electronics and its cooling in the Alice TPC experiment Page 1A The Alice TPC.
1 Module and stave interconnect Rev. sept. 29/08.
Multilayer thin film technology for the STS electronic high density interconnection E. Atkin Moscow Engineering Physics Institute (State University) –
“PCB” -AMIT NIKAM -ASHI NAGARIYA.
M.Oriunno, SLAC Stave cable and module options. M.Oriunno, SLAC Background - module The IBL electrical unit for data output is a single chip The use of.
CMS ECAL End Cap Meeting CERN 19 June to 23 June 2000 A.B.Lodge - RAL 1 ECAL End Cap High Voltage Cards and 2000 Electrical/Thermal Model. Progress on.
Temperature Rise in PCBs1 n Temperature rise in a conductor is related to the current flow and cross sectional area. n Must not exceed the safe operating.
DOE Rev of Run IIb Sep 24-26, Detector Production WBS James Fast Fermilab.
Cosmic Test Rig  Mechanical structure to hold 4 PCBs  Minimise inter-sensor spacing  Rigid during ~weeks test run  Mounting for scintillators above/below.
Package Substrate Jan Business Confidential Top Metallization mm mm Bottom Metallization Beryllium Oxide OR Alumina We should see.
Low Mass Rui de Oliveira (CERN) July
The Mechanical Structure for the SVD Upgrade
LumiCal mechanical & sensors design Wojciech Wierba J.Błocki, E.Kielar, J.Kotuła, K.Oliwa, L.Zawiejski FCAL Workshop, IFJ PAN Cracow,
SVD Mechanics Markus Friedl (HEPHY Vienna) BPAC, 26 October 2015.
Proposal for the assembly of the PHOBOS ring counters (H.P. 3/20/98) I would like to propose and discuss with you an alternative layout and assembly procedure.
Stave 130 Geometry Peter Sutcliffe ATLAS Strips WP4 Meeting 26 th March 14 Liverpool.
End-of-stave region. 2 Space Z-dimension is critical –Keep gap small (might help getting rid of stubs) Edge of last barrel silicon (at corner) is 1277.
Alpine pixel layout Integration progress Teddy Todorov For the ATLAS-LAPP group AUW Integration meeting 20/11/2012.
Stave - Electrical Break Richard French The University of Sheffield Material from the ATLAS SCT/IBL/PIXEL community.
Stave programme. 2 Staves recently build Stave#7 –I think is at QML –Intend was to aggressively thermally cycle and look for structural issues Stave#8.
Progress on the Prototype design Catania Goikoetxea, Mikel Navarro Medrano, Javier Mainz, March 31st,
EOS and type I Prototype Service Modules Mike Dawson (Oxford), Rob Gabrielczyk (RAL), John Noviss (RAL) 19 th January 2015 ATLAS Upgrade Activities, Oxford.
1 ABC130 Module Envelope Envelope set by 2 locations 1.Power end – biggest contribution coming from shield box 2.Data I/O end – set by wire bonding from.
Stave #12 This stave core was built together with William Emmet, Tom Hurteau, and Jeffery Ashenfelter from Yale University in the week of November.
DOE CD-2/3a Review of the BTeV Project – December 14-16, BTeV Pixel Detector Pixel Module Assembly and Half-Plane Assembly Guilherme Cardoso James.
Origami and PA design 6 February 2012 Christian Irmler (HEPHY Vienna) 1 Common SVD-PXD Meeting.
PACKAGE FABRICATION TECHNOLOGY Submitted By: Prashant singh.
Origami and Cooling 24th September 2012 C. Irmler (HEPHY Vienna) Joint PXD and SVD Meeting Göttingen.
Tracker Upgrade Mechanical/Thermal Engineering 3 June meeting theme: Modules and Structures News on Phase 1 BPIX Upgrade Mechanics & Modules, R. Horisberger.
Andrei Nomerotski 1 Flex Status & AID A.Nomerotski, 18 June 2010.
24 September 2012 Immanuel Gfall (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
24 September 2012 Immanuel Gfall (HEPHY Vienna) Annekathrin Frankenberger (HEPHY Vienna) SVD Status of Mechanics PXD-SVD Meeting Göttingen.
EC: 7 DISK concept Preliminary considerations
ATLAS Internal ID Service Integration
Micro Vertex Detector of PANDA Status of Strip BARREL and DISC
What is Stave Carrier Frame Required to Do?
Status and plans for the pigtails
ob-fpc: Flexible printed circuits for the alice tracker
WP9 ITS Mechanics and Cooling
ROX sensor packaging and mounting scheme for use on dilution STM sample plates Ben MacLeod Jan
Meeting on Services and Power Supplies
HB RM prototypes Ianos Schmidt Aug 17, 2017.
Services Layout – Update
Equipment for Assembly – UK Experiences
पी.सी.बी बोर्ड.
Module/Ladder Assembly
Flex Status A.Nomerotski, 4 May 2010.
Mechanics of the MVD Daniela Calvo on behalf of the MVD group
After service guide for changing PCB
Benefits & Advantages of Pogo Pins
Presentation transcript:

15th January 2014 WP4 Meeting Oxford1 EoS PCB Mike Dawson University of Oxford

EoS PCB & Interlink 15th January 2014 WP4 Meeting Oxford2

EoS Flex-rigid assembly 15th January 2014 WP4 Meeting Oxford3 ‘C’ Spacer gives connector Pin clearance to stave interlink - no need for interlink cut out Flexible thickness 0.5mm 5mm bend radius Rigid thickness ~ 0.95mm (each side)

EoS Flex-rigid assembly 15th January 2014 WP4 Meeting Oxford4

EoS Flex-rigid assembly 15th January 2014 WP4 Meeting Oxford5

Summary Pin allocations have been decided for the Stave connector - Marcel. Position of the stave connector on the outer barrel layer is under review - space conflict with support structure. Shape/length of ‘flex pigtail’ under review – new design Interlink. We need to test the volt drop in the pigtail. A sample of the multilayer flex pigtail would also help us understand how ‘flexible’ it really is. 15th January 2014WP4 Meeting Oxford 6

EoS PCB & VTRx transceiver 15th January 2014 WP4 Meeting Oxford7

EoS PCB Light Peak transceiver 15th January 2014 WP4 Meeting Oxford8

Summary Jan Troska suggests we carry on working with the VTRx as the Light Peak alternative is 18+ months away. Non-functional samples of the Light Peak have been requested from AVAGO to evaluate the connectivity issues – not sure how robust the connector is. Is this design really suitable for our purposes? 15th January 2014WP4 Meeting Oxford 9

Cooling pipe temp sensors 15th January 2014WP4 Meeting Oxford 10

Cooling pipe temp sensors 15th January 2014WP4 Meeting Oxford 11 JT Thermistors ? (Semitec)

Cooling pipe temp sensors Common view is that these brackets were a nightmare to fit. Could we fit temp sensors to the electrical break or cooling pipe within the stave (during construction)? No external wiring. Wires could be replaced by a thin flex-pcb(s) built into the stave. Flex-pcb(s) would exit stave to connect to EoS pcb. 15th January 2014WP4 Meeting Oxford 12

Cooling pipe temp sensor flex-pcb 15th January 2014WP4 Meeting Oxford 13 Connectors mounted on EoS pcb, positioned away from wire bond area Inter-pcb flex width reduced to accommodate temp flexes

Possible method of mounting temp sensors 15 th January 2014WP4 Meeting Oxford14 Flats machined on end of Electrical Break (could be smaller – 0402 package available) Sensor wires exit on same side Sensors could be in vertical or Horizontal plane

Summary Current cooling sensor is (I believe) a Semitec JT Thermistor (0603 footprint). This component is insulated electrically and thermally by a polyimide cover. The FT version is an 0402 device mounted on a ceramic substrate. The flex-pcb would only need to 1mm wide to cover both pads. Need to be careful we don’t make the flexes fragile. Samples have been requested from Semitec for mounting tests. Discussing the options with Richard French. 15th January 2014 WP4 Meeting Oxford15

Grounding Ned wants the cooling pipe electrically connected to the common ground point on the EoS PCB(s). Ned has suggested that the Stave CF conductivity at HF may mean we don’t need a bracket (and wire) on the cooling pipe. A beryllium copper ‘leaf spring’ could be glued to the CF skin, which would be connected to an exposed area of the commono ground point on the EoS pcb. Need to discuss further with Ned, but he seemed happy with this idea in principle. 15th January 2014 WP4 Meeting Oxford16

Grounding 15th January 2014WP4 Meeting Oxford 17

Extras 15th January 2014WP4 Meeting Oxford 18

Extras 15th January 2014WP4 Meeting Oxford 19

Extras 15th January 2014WP4 Meeting Oxford 20

Extras 15th January 2014WP4 Meeting Oxford 21

Extras 15th January 2014WP4 Meeting Oxford 22