LS1 planning meeting 1.7.2013. 1/7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS.

Slides:



Advertisements
Similar presentations
TC meeting /11/14TC meeting2 ALICE LS1 plan from now till MarchWeeks Install TRD infrastructure46 TRD4&5 (and counterweights removal)47.
Advertisements

1 Installation of Delphi Frame  ITS Installation.
LS1 planning meeting Activities weeks 13, 14 & 15 22/3/13LS1 planning meeting - A.Tauro2.
June 2004 Andrea Gaddi, PH-CMI USC Installation Commissioning Task Force 1st Run Meeting, June 3rd, 2004.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /12/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
L.Jirden1 Update on Power Supplies DCS WS L.Jirden u Wiener u Caen u Global Support Contracts.
TC meeting P2 planning wks 7&8 A.Tauro
Notes After TIG 17/7/08 HF+ Move out of garage: Aug 15* Platform+table+collars+racks+BP support (jack up for platform) = 3 days Controls for motors = 1.
1 5 December 2012 Laurent Roy Infrastructure / Electronics Upgrade -Cabling (long distance) -Rack and Crate (space, electrical distribution, cooling) -Detector.
winter shutdown preparatory meeting A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
winter shutdown planning A.Tauro
LS1 reference slides LS1 plans Detector’s plans Services and central systems availability 8/2/13LS1 planning meeting - A.Tauro1.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. 1 st June: PT100 electrical connection failure (Temp Chiller water In&Out) 1) it required an access to the cavern to be fixed 2) access.
LS1 planning meeting Comments on LS1 schedule Schedule reviewed last week with Yann + TC…  sequence after OD looked too squeezed  therefore.
ALICE Collaboration Meeting Heidelberg Services Update  Progress on services Detector cabling Gas systems Cooling systems  Rack footprint  Primary electrical.
SU ACTIVITIES PENDANT LS1 CMS ALICE. Antje Behrens | SU pendant LS1 day| | EDMS | page 2 CMS Quoi (quelles activités prévues pendant.
P2 status, LS1 planning A.Tauro - W.Riegler. Outline TS2 activities Detector activities during LS1 Proposal for ALICE recommissionig plan in 2014 Conclusions.
PHOS progress in LS1 Alexander Vinogradov 11 August 2014.
TS4 preparatory meeting TS4 – weeks Underground access possible in week 51 – as from Monday morning 9:30 –Ulli and Philippe will start.
winter shutdown preparatory meeting A.Tauro /12/11ALICE winter shutdown schedule - A.Tauro 1.
Injectors & LHC report K. Foraz on behalf of OSS members 14/06/2013LSC - K. Foraz1.
ALICE 5 o’clock meeting Wk 51. INDICO You’ll find this meeting here: – The full shutdown planning.
Claudio Bortolin. Drilling: – tungsten carbide tip welded on twisted ss cable – drill to operate the rotation – counter-flow at 200 mbar w/manometer to.
EN-CV interventions during YETS
ALICE TC meeting – Plans for the next technical stop A. Tauro.
TS planning meeting 7 to 11 Nov Technical stop Wk 45: Monday 7 th to Friday 11 th November Ramp down magnets (SL): Mon 8:00 – 8:30 (latest) RP search.
winter shutdown planning A.Tauro
winter shutdown planning A.Tauro
Activities related to Experiments during TS3 and YETS th November, 2015 M. Bernardini, M. Barberan With the support of S. Chemli and Experiments.
TS May 9-12 – Schedule SL instructions: Both magnets ramped down Monday May 9 th 7:00 latest Thursday: check with CCC before restarting magnets: – TE-EPC.
LS1 planning meeting /4/13 ALICE TBStatus of LS1 activities - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare.
ALICE planning meeting /2/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
TC meeting P2 planning wks 9&10 A.Tauro
ALICE Arturo Tauro Werner Riegler.
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
TC meeting LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove.
André Augustinus Infrastructure  Turbines  Radmon  Thermocouple readout  Netgear redundancy  Other cavern items  Cooling CRs  Other CR and surface.
Michel RAYMOND – July 1 st, 2013 Technical Support Activities in PH-ADO-PO Summary of 2013 activities.
TPC Collaboration Meeting Peter Glassel 1 Reminder on Installation Schedule (ALICE Forum June 2002)  Install Muon magnet directly into experimental.
ALICE 5 o’clock meeting Wk 49. INDICO You’ll find this meeting here: – The full shutdown planning.
winter shutdown planning A.Tauro /1/12ALICE winter shutdown schedule - A.Tauro 1.
TC meeting P2 planning wks 5&6 A.Tauro
TS2 preparatory meeting A.Tauro. General information LHC- TS2: from Monday 31st 6am, to Friday 4th 5pm LHC beam stops on Monday morning.
1 Planning DCS WS L.Jirdén. 2 TPC HMPID ACORDE FE PC Console DSS Disk SRV DB-SRV App GW sensors actuators DSS sensors actuators PC room SXL2.
1 Update on Power Supplies TB L.Jirden u LV u Concerns u Orders & deliveries u Maintenance u HV u Overview u purchasing.
Central vacuum valve in ALICE Pros and Cons ALICE TC –
TS3 preparatory meeting 14/9/2012 TS3: 17-21/
ALICE 5 o’clock meeting Wk INDICO You’ll find this meeting here: – The full shutdown planning.
TS3 preparatory meeting A.Tauro. General information LHC-TS3: from Mon 9 6am, to Fri 13 5pm LHC beam stops on Mon morning at 6:00.
TC meeting P2 planning wks 3&4 A.Tauro
ALICE planning meeting /11/10 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
ALICE planning meeting /1/11 ALICE planning meeting2 Outline ALICE Christmas break schedule –Access UX25, L3 and MNF Services interruption.
DCal-ALICE integration and installation plan and status A. Tauro.
21 Mar 2007ALICE - Paul Dauncey1 ALICE CR07: Installation and Commissioning Paul Dauncey Material from: L. Leistam: “ALICE Status” W. Riegler: “Commissioning.
ALICE Installation: Planning Meeting Agenda: 1- ALICE shutdown schedule 2- Miniframe removal sequence.
ALICE 5 o’clock meeting Wk 50. INDICO You’ll find this meeting here: – The full shutdown planning.
EYETS planning A.Tauro.
ALICE 5 o’clock meeting Wk 51.
ALICE planning meeting
TS2 preparatory meeting
LS1 planning meeting - A.Tauro
LS1 planning meeting
ALICE 5 o’clock meeting Wk
TS1 preparatory meeting
Shutdown conclusion, LS1 and LS2 planning - A.Tauro
ALICE 5 o’clock meeting Wk
TRD GAS SYSTEM PRR Gas System Integration Gas building
Presentation transcript:

LS1 planning meeting

1/7/13LS1 planning meeting - A.Tauro2 LS1 plan 2013Weeks Remove plug, mobile shielding, open doors8-9 Prepare for PHOS extraction, remove RB24 beampipe and PMD10 Remove PHOS cradle and modules, transfer TOF crates on SF11-13 Modify L3 services and install YP for TRD1714 Modify L3 services, remove TRD17 and rework LV distr. TRD , DCal tests in SXL Modify L3 services, open low-beta and swap Q5L8 magnet, DCal tests in SXL2, new UPSes20-23 Swap PHOS beams with DCal beams25-26 Install DCal support structure27-29 DCal and PHOS services (1/2)31-33 Contingency34-35 (August) DCal and PHOS services (2/2)39-40 Open Days – / Install 2 1/3 DCal modules41 Install 3 DCal modules (C-side)42-43 Rework LV distr. TRD Two weeks between 44 and 51 Xmas pause52-1 Done Ongoing Done

1/7/13LS1 planning meeting - A.Tauro3 LS1 plan 2013 – ALTEAD weeks 22-30Weeks Swap Q5L8 magnet /5, install new UPSes, dismantle DCal ribs SXL222 Close low-beta, install new UPSes, test DCal ribs insertion SXL223 Swap TRD and TPC tanks, test manipulation DCal beams SXL224 Install I-side DCal beam. Reinstall SSD CAEN boards. Put 22 ACO modules into cleanroom25 Install I-side DCal beam. Remove CR1 racks26 Preparation ribs installation. Test surface cranes 27 Insertion DCal ribs28 Insertion DCal ribs. Preparation ALICE party (Thu 18.7)29 Empty SA2 + install new CR1 racks. Remove HMPID C6F14 pumping station30 Empty SA2 + install new CR1 racks 31 Empty SA2 + install new CR1 racks32 Empty SA2 + install new CR1 racks 33 Empty SA2 + install new CR1 racks34 June July August

1/7/13LS1 planning meeting - A.Tauro4 LS1 plan 2014Weeks Install 4 PHOS modules (incl.pre-commiss.)2-5 Install 3 DCAL modules (A-side)6-7 Install top/bottom counterweights8 Remove comp. magnet and Suspend Miniframe9-11 Install TRD with yellow platform (bottom)12-14 ‘Un-suspend’ Miniframe15-16 Reinstall TRD1717 Concrete walls & TRD installation frame18-19 Install TRD4-5 (top) & counterweights20-21 Remove TRD infrastructure22 Reinstall PMD, ZEM and comp. magnet23 Reinstall and bakeout RB24 beampipe Close plug, mobile shielding26-29

Access situation No access restrictions in the coming weeks 1/7/13LS1 planning meeting - A.Tauro5

Activities weeks 27, 28 & 29 1/7/13LS1 planning meeting - A.Tauro6

Week 27 (1-7/7) UX25: ALTEAD + P2tech: reinstall cheval O-side (Mon) P2tech: infrastructure ribs installation Muon TRK: work on ST1-2 mechanics + work on ST4 (CH7 and 8, left and right) (whole week) EN-EL: cables from LHC tunnel (MNF and low-beta) BE-ABP: maintenance on HLS sensors P2tech: reconnect TPC multilayer pipes EN-LM: lift intervention (measurement door). No access UX25 Saturday 6 th July from 7:00 to 10:00 L3: ALTEAD + P2tech: remove infrastructure DCal beams (if no adjust. foreseen) + install C-O-side trap (scaffolding on Mon) + re-arrange C-side cables + install C-side staircase (not ready!) P2tech: install wooden panel for TOF SR8 (baby-frame) (Mon) (need nacelle) TOF: work at SM8 (cooling) (Tue-Fri) – need nacelle (if possible) and staircase P2tech: LV consolidation (TRD-TPC-TOF) O-side (whole week) T0: removal detector (date tbc) CRs: SPIE: CR1 UPS cables DCS-CR3: rearrange new cluster over more racks Surface: REEL: install cables “anti-collision-system” PX24 PH-DT: P test SF6 and C2H2F4 lines GS-ASE: work at key cabinet (Mon AM) ALTEAD: test surface cranes EN-CV: UW maintenance – cut P2 primary water 1/7/13LS1 planning meeting - A.Tauro7

Week 28 (8-14/7) UX25: Maintenance access system: limited access UX25 on Friday P2tech: ribs installation Muon TRK: work on ST1-2 mechanics + work on ST4 (CH7 and 8, left and right) (whole week) BE-ABP: maintenance on HLS sensors L3: P2tech: re-arrange C-side cables P2tech: LV consolidation (TRD-TPC-TOF) O-side (whole week) CRs: SPIE: CR1 UPS cables DCS-CR3: rearrange new cluster over more racks Surface: EN-CV: UW maintenance – cut P2 primary water 1/7/13LS1 planning meeting - A.Tauro8

Week 28 (15-21/7) UX25: P2tech: ribs installation Muon TRK: work on ST4 (CH7 and 8, left and right) (whole week) L3: TPC: laser repair (Tue-Thu) P2tech: LV consolidation (TRD-TPC-TOF) O-side (whole week) CRs: P2tech: structure for new racks DCS-CR3: rearrange new cluster over more racks Surface: P2tech: help ALICE party EN-CV: UW maintenance – cut P2 primary water 1/7/13LS1 planning meeting - A.Tauro9

Visits in the coming weeks 1/7/13LS1 planning meeting - A.Tauro10