What you need to know about handling major school works 5 th July 2013.

Slides:



Advertisements
Similar presentations
Options appraisal, the business case & procurement
Advertisements

THE HOUNSLOW EXPERIENCE: A CASE STUDY Mark Steward MAX Associates 28 th April 2009.
THE HELP PROCESS. Professional medical equipment project management is the systematic, knowledgeable process through which all items of capital equipment.
PROJECT MANAGEMENT & BUSINESS PLANNING PROCESS
Fawzy Al-Alami G Term Paper.  Introduction.  Effect of Teamwork in Design-Build. Construction Contract.  Factors Can Enhance Design-Build.
Project Delivery Approaches for Wastewater Utilities in Minnesota June 24, 2008 Metropolitan Council Environment Committee.
CMGC Contracting at UDOT Program, Projects & Lessons Learned
David Mackness CEO Scape. EMPA – Making a Difference Issues to resolve A solution from empa Improving your project deliver.
Effective Contract Management - Getting it Right! 24 th January 2007.
Your Presenters Lisa Dal Gallo Dave Kirn Regional Executive/Justice Market Leader Partner, LEED AP
A Match made in Heaven? Connecting you with a builder.
ESTATES SERVICES Soft Landings – An Introduction 2013.
UNRESTRICTED Infrastructure Assessment as Viewed by Technology Holders IAEA Technical Meeting December 10-12, 2008 R. Godden.
Chapter 3 Project Initiation
Novel Procurement Options ARBE121 – PFI  Variants, additions to or environments for routes  Private Finance Initiative (PFI) A funding & operational.
Alderman Road Residences Phase II Design Build. Extensive master planning preceded this phase 2003 – Dagit Saylor Master Plan Hanbury Evans Update.
Month Year Working together to achieve your desired outcomes, by delivering service excellence. Building Engineering Solutions for the optimisation of.
Rethinking Construction Review of traditional construction models and a comparison of product development processes with other industries School of Architecture.
Chapter 3 Project Initiation. The stages of a project  Project concept  Project proposal request  Project proposal  Project green light  Project.
Opportunities and risks: Recent research on shared services in the community sector Dr June Lennie June Lennie Research and Evaluation
1 Collaborating for competitive advantage: SMEs and the Supply Chain Achieving better SME involvement in Partnering Michael Thompson The TEAM FOCUS Group.
Construction Management Practice Implications of the Theory of Construction Management.
Construction Engineering 380 Professional Design Services Chapter 12 Appendix G.
Construction Industry. Salisbury Cathedral Taj Mahal.
Implementing Sustainable Development Sustainable Procurement & Corporate Social Responsibility Achieving Level 3 of the Flexible Framework.
Trivandi major project consultants. About Trivandi Trivandi is an international consultancy that provides strategic advice, project management and assurance.
Chemical Engineering Department
Project Management – The Project Charter
Maryland Point An Approach to Affordable Housing.
CDM & RIBA Plan of Work th June 2013 Ross Gooding – Principal Health and Safety Consultant / CDMC.
Construction Category Management Planning Version 1.1 (May 2015)
Building a Better Bid The Nuts & Bolts Dave Leonard The World Bank.
Constructing West Midlands Martin Merrix Divisional Manager, Urban Design.
PROJECT RESOURCES AND RISKS By Catherine Cowper. AVAILABLE RESOURCES When doing a project there are various resources that need to be made available for.
Owner Has Idea and Conducts Feasibility Study GoNo Go End of Project Pursue A/E Hire A/E to Design Project Scope of Work Defined Contract Negotiated Go.
Alison Melnyczuk Town Clerk Nick Dibben Town Mayor Re-opening the St Ives Corn Exchange.
YOUNG PROFESSIONALS SEMINAR CIVIL ENGINEERING CHALLENGES Venue: CSIR International Convention Centre Gauteng Date: 22 November 2013 Presenter: Vikash.
Software Engineering Management Lecture 1 The Software Process.
DESIGN-BUILD The Culture of Builders The “Design–Builder" is typically a general contractor. Some design–build firms employ professionals from both the.
Programme for Health Service Improvement in Cardiff and the Vale of Glamorgan CARDIFF AND VALE NHS TRUST YMDDIRIEDOLAETH GIG CAERDYDD A’R FRO.
Construction Engineering and Management 1 Cost Benefits Structural Safety Architect Feasibility Assessment of architects Functional Aesthetic constructability.
Slide 1 Children & Young People’s Services Change in Children & Young People’s Services Integrated Family Support Market event 7 November 2012 “Bristol's.
Rushcliffe – great place, great lifestyle, great sport Rushcliffe Borough Council – Growing a social franchise 10 July 2013 Neil Clarke, Leader.
81 8. Managing Human Resources Managing the IS function Centralized control of IS function Distributed control of IS function Federated control of IS function.
Materials, Pavements & Transportation Operations CONCEPTS FOR ENHANCING THE EFFECTIVENESS OF TRAFFIC CONTROL PLANS Stuart Anderson Gerald Ullman Making.
Process of Planning, Designing and Financing a Hospital
Building Performance Evaluation £8m funding between 2010 & 2014 Case study investigations Identify factors that encourage good performance Domestic &
Meet the Buyer West Yorkshire Transport Fund. WELCOME Mark Roper & Steve Carmody.
Managing private sector advisers Training event on PPP programming and process management 27 May 2008 Twinning Project CZ/2005/IB/FI/04 Mikko AJ Ramstedt.
Role of Self-Assessment V.C. Agarwal, Director (HR) NPCIL,INDIA.
Global construction consultants SPENDING WISELY Laurence Brett Partner Davis Langdon LLP.
Safe roads, Reliable journeys, Informed travellers “how the HA is addressing the needs of safety in future maintenance and construction within the design.
CONSTRUCTING WEST MIDLANDS Question & Answer Session 22 nd March 2011 LOT 7 – CAPITAL WORKS.
PRE-PLANNING FOR CONSTRUCTION PROJECTS. OVERVIEW ASSESSING OWNER CAPABILITIES ANALYSIS OF RESOURCES REGULATORY REQUIREMENTS SITE DEVELOPMENT REVIEWING.
BUSINESS STRATEGY AND PLAN 2010 Emerging Energy Solutions 1.
Marketing to Main Contractors Winning Work from a Main Contractor Paul Clarkson Iain Flatters Construction Director Group Procurment Manager.
Consultation Process within the Street Lighting PFI SSE Contracting Working in partnership with Nottingham City Council.
Stephanie Norris Partner, Purcell ‘Getting Building Work Done’ HRBA/Purcell event 09 June 2016.
Construction Tender Process Tender steps between Client, Contractor and Subcontractor Dr A Kimmance.
Phases of construction
Welcome This partnership meeting will cover information and the timetable for the opening of the new KCEPS.
2016 SAME Small Business Conference - Atlanta
The Design Team Carl James.
Becoming a Successful Construction Manager
Pre-contract Planning and Practice
How to increase your market share : routes to success
PROJECT DELIVERY METHODS
Kevin J Bradley Welsh Infrastructure Conference Structuring a Successful Education Project Structuring a Successful Education Project Kevin Bradley Wednesday.
Back Ground Information
Project delivery RIBA stages Define design deliver Key Objectives 1 2
Presentation transcript:

What you need to know about handling major school works 5 th July 2013

Topics for Discussion  Who are we?  People  Buying  Process  Lessons learnt

Built Environment Services Built Environment Services Energy Building Consultancy Investment Community & Leisure Facilities Management Construction Design

Who are we?  Established 2006  Focus on North East and Education  Best practice services  Maintaining buildings for approx 40,000 children  Spent over £300m with North East businesses

What is a major project?  Size  Complexity  Value  Disruption – Business Continuity & Health & Safety risks

PEOPLE

Who’s who?- The client team Key Authority Visioning

Who’s who? – Client representative  ‘Special one’ – deliver on demand  Time

Who’s who? – Client representative  ‘Intelligent Client’ – level of technical knowledge and expertise  How much technical knowledge does the Client Representative need? External Support

Who’s who?- External

Who’s who - External LANDSCAPE ARCHITECT ACOUSTIC ENGINEER HIGHWAYS ENGINEER OTHER SPECIALISTS

Who to work with? - Selection  Identify a short list  Key Points:  References  Bid Documents  Interviews  Evaluation  Feedback

BUYING

Translating Visions into Plans Developing the Brief What to Consider...  What do you want to achieve as a result of the project... ? Consider Long Term, Mid Term & Short Term goals  What is your Vision in terms of education...? not just the physical requirements  What is your school’s pedagogy, ethos... ? Should be enhanced/reflected in the built solution  Challenge initial pre-conceived ideas... Additional space/new build isn’t always required Consider alternative options: remodel/refurb  Programme and Construction Is phasing of work required/possible, avoid decant A clear Vision translates into A clear Brief... Not what you physically want to do but what you want to achieve...

Translating Visions into Plans

Procurement route

 Choose carefully!  No construction project is the same  OJEU - £4,348,350 works £113,057 services  CDM – 30 days or 500 man hours  Risk

Typical risks Programme slippage Funding Accuracy of cost plan Design changes\clashes Accuracy of client information Delay in sign off Site conditions Changes in legislation Delay to planning Inflation Availability of materials Market conditions

Procurement route – Traditional Key Main Legal Relationship Communications

Procurement route – Traditional  Advantages  Disadvantages Client Control over design and spec Cost Certainty at award of construction Client retains direct contract relationships Higher Client Risk Longer Programme Low Risk to ContractorHigh Level Expert Client Resource

Procurement route – D&B Key Main Legal Relationship Communications

Procurement route – D&B  Advantages  Disadvantages Cost Certainty Single Point of Contact Early Contractor Involvement Shorter Programme Client has reduced control Client changes are unadvisable

Process

RIBA –Stages of work

 Stage A  Establish Team  Vision in Place  Stage B  Appoint Design Team  Feasibility  Surveys

 Stage C  Outline Design  Initial Cost Plan  CDM  Risk, Risk, Risk

Aftercare  Do you understand how much it will cost to run your building? Capital v Whole Life Cost

Aftercare

Identify operational costs and when they occur  Utilities  Planned maintenance  Replacement  Repair  Sub contracts  Training

Aftercare Snags, Defects Liability & Latent Defects  Snags couple of months from hand over  Defects liability – 12 months from hand over  Latent Defects – Up to 12 years from hand over

Lessons Learnt  Attitude  Single point responsibility  Decant  Work to one programme  Furniture Fittings & Equipment Emirates Stadium Wembley Stadium

Summary  Find your ‘Special One’ and support them  Pick the right team & procurement route  Put time into vision & design brief  Understand aftercare

Aura Level 4, West Tower Baltic Place, South Shore Road Gateshead NE8 3AE Questions?