Lesson 5.  The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common.

Slides:



Advertisements
Similar presentations
Overview Information obtained from FOXDIY.CO.UK J.Byrne 2012.
Advertisements

CEM-STEEL Floor Decking Roof Decking Security Walls
Chapter 5 Measuring Carpentry Work. Board Measure Most lumber is dressed; this means that surfaces are sanded, which reduces the size of cross section.
Carpentry Skilled Trades Ceiling and Roof Framing The most commonly used types of residential roof and ceiling construction are: Joist and Rafter.
CON 4003 Construction Estimating Prof R. V. Locurcio.
Timber Framed Structures
Estimating & Tendering. Estimating work involves dealing with Measurements and quantities Pricing and rates Subcontract packages Tender preparation.
NGfL CYMRU GCaD FLOOR SCREEDING, PLASTERING AND RENDERING.
THE PROJECT BRIEF… BUILD A CONTEMPORARY HOME ON A SMALL INNER CITY BLOCK WITH NO ROOM FOR ONSITE STORAGE OR SCAFFOLD.
Lesson 11.  Timber framed structures are common in New Zealand. They comprise of timber studs, plates, bearers, beams, rafters, purlins and custom fabrications.
NGfL CYMRU GCaD STRUCTURAL TIMBER FRAMING.
TIMBER WALL FINISHES Timber wall finishes can be generally divided into two main group: Timber wall finishes can be generally divided into two main group:
MOULD IN BUILDINGS New Plymouth Conference – November 2013 Philip O’Sullivan, Director.
Carpentry and Joinery NVQ and Technical Certificate Level 2, 2nd Edition © Pearson Education Limited, Copying permitted for purchasing institution.
Chapter 12 Pricing Masonry Carpentry, and Finishes Work.
Class Day Seventeen.
Skilled Trades 1201 Floor Framing
After the foundations have been completed the walls are set out and construction commences. wall structures.
© 2006 ITT Educational Services Inc. CD230 Architectural Design & Drafting: Unit 1 Slide 1 Unit 1 CADD Part III.
Estimating Waste Week 3 CTC-415. What is waste Waste is material that needs to be supplied but may not be used All material items except steel beams and.
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
House Construction. Learning Standard 5. Construction Technologies Construction technology involves building structures in order to contain, shelter,
Lumber Section II. Lumber Structural Strength Depends on species and grade, and the direction in which the load is acting with respect to grain of the.
Wall and Ceiling Construction Vocabulary
CON 4003 Construction Estimating Prof R. V. Locurcio.
Metals. Introduction u Metal is used in various places in the construction process including: –rebar = reinforcing steel in round shapes –flashing = thin.
Lesson 2.  Estimating Techniques ◦ Internal finishes.
NGfL CYMRU GCaD SITE CARPENTRY.
ASSIGNMENT Begin on page 197 “The Foundation”.
Construction Residential Houses Definition of a House: A structure serving as a dwelling for one or more persons, especially for a family.
Construction Carpenter Vocabulary Created by The University of North Texas in partnership with the Texas Education Agency.
Balloon Frame North-American invention, 1833
Construction Framing Mr. Brock. Lumber 2x4s are not actually 2” by 4”
Wall and Ceiling Construction
Chapter 23 Plumbing Systems. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Identify several.
Ceiling Framing Unit 32.
Residential Construction Mr. Todzia
Wall Framing Grimsby Secondary School Technology Dept.
Wood Construction CTC-375.
PowerPoint ® Presentation Unit 52 Thermal Insulation and Other Insulating Methods Thermal Insulation Exterior Insulation and Finish Systems (EIFS) Roof.
CON 4003 Construction Estimating Prof R. V. Locurcio.
WHAT I WANT TO BE WHEN IM OLDER! CAPENTER AND JOINER.
Marieclaire Monasterio Aracelis Cedeño
Unit 6/P6 – Timber Frame Construction Name ________________
 Overview of Interior Finishes  Types  Examples.
ASSIGNMENT 1.Begin on page 177 “The Foundation”. 2.Complete “Footing and Foundation”, “Floor and Wall Frame”, “Roof Frame” 3.Label each part of the diagram.
Framed Structures Luisana Hernández.
House Construction.
Unit 6: Building Technology in Construction Learning Outcome Understand the techniques used in the construction of superstructures for low-rise domestic.
Recognise basic woodworking joints. 1 Can you name and state a use for these joints? These are angled butt joints, which can be used for the simple jointing.
Introduction TopRung LLC is one of the leading construction building repair and building maintenance service company in Seattle.
CARPENTRY By: Jason Burkhart. The installation of your floor system will depend on the design of your house. The guidelines we will use are 24ft wide.
Warm-up 9/20/16 What is the underlayment called below the shingles?
OBJ: SWBAT create a CAD Rendering of a Utility shed.
APPLICATIONS OF TECHNOLOGY
Major Steps In Building a SFR
Construction Framing Mr. Brock.
Warm-up 9/19/16 What template are we using?
Pritesh h prajapati Arvind g prajapati Arvind m prajapati Arvind khata.
Objective 6.02 part 1: Recognize components of construction
Sketchbook assignment-part3
•Connecting to the Foundation & Bearing
Building section A vertical cut or slice through a structure that illustrates the type of foundation, wall, and roof construction to be used.
STRUCTURAL TIMBER FRAMING
FINISHES (FLOOR, WALL & CEILING)
Applications of Timber Teaching Resource
Common Components of a Traditional Wood Framed Building
When all the first fix electrical and plumbing is finished the roofers return to fix the ceiling sheeting in place so the plasterers can arrive on site.
Information related to Chapter 7 in the textbook
Timber Frame Panel with opening Typical panel comprises a series
Presentation transcript:

Lesson 5

 The carpentry trade covers many items. That is, it is not confined to a few specific items such a reinforcing steel, painting etc.  Common carpentry items include timber framing, linings and claddings  Some carpentry items such as timber framing can either be fabricated on site or off site (prenailed walls, trusses etc)  Carpenters apart from their own work often attend on sub trades

 Items to consider include when pricing timber framing: ◦ Size of timber 200x50, 150x50, 100x10 etc ◦ Length of stock sizes ◦ Rough sawn (R/S) or plane and gauged (P/G) ◦ Timber treatment (H1.2, H3.2 etc) ◦ Timber strength (SG6, SG8, SG10 etc) ◦ Usage (location, sub floor, walls, roofs etc) ◦ Quantity required ◦ What it is been fixed to ◦ Species of timber

 There is a range of linings that the carpenter installs. These range from wood products such as plywood through to fibre cement products such as Villaboard and Hardiflex and Seratone. Reconstituted products such as Fermacell are also installed by the carpenter  Each product is not only designed for specific uses (though sometimes more than one type can be used), but they all have different price points  Factors to consider when pricing include: ◦ The product itself ◦ Where it is being installed (wall, ceiling etc) ◦ Sheet size and thickness ◦ Method of fixing (glue, screwed, nailed) ◦ Method of finishing

 Similar parameters to Linings except that along with sheet products there are also board products notably weatherboards  Installation method is vitally important as the cladding protects the interior from the weather  Laps to be considered with weatherboards

 Finishing lines include the trim and mouldings that finish the work. These include skirting boards, cornice, architrave, scriber etc  Factors to consider when pricing include: ◦ The product itself including its profile ◦ Internal or external ◦ Where it is being installed (wall, ceiling etc) ◦ Stock length ◦ Method of fixing (glue, screwed, nailed)

 Other items that the carpenter typically install includes: ◦ Building paper and wrap ◦ Battens ◦ handrails  Carpenters may also install: ◦ Doors and windows ◦ Joinery fittings ◦ Minor concrete footings / piles ◦ Roof coverings ◦ Door and sundry hardware ◦ Plasterboard linings ◦ Vents and grilles ◦ Builders work to sub contractors

150x50 deck joist, 2500 long. How much per m to install? C 150x50 H3.2 timber (3000 stock length) = $ This includes discounts. We only need a 2500 piece though. So, $14.65 / 2.50 = $5.86 /m. This is not the cost per m however. The cost /m is $14.65 / 3.0 = $ 4.89 C Cartage say $0.15 / m$ 0.15 W Waste = 0.50m / 2.50m = 0.20 or 20% $ 0.98 F Nails and fixings = $0.70 /m $ 0.70 e nil$ 0.00 L Carpenter 0.18 $45.00/hr = $ 8.10 Total cost per m of floor joist$14.82 / m