1. 2 CES, MBE, GLE Replace ACM soffit – CT/CMPL SMS GLE, MBE, CES Replace Stage Rigging and Lighting (ACM wiring) CMPL CHS and SMS Brick masonry improvements.

Similar presentations


Presentation on theme: "1. 2 CES, MBE, GLE Replace ACM soffit – CT/CMPL SMS GLE, MBE, CES Replace Stage Rigging and Lighting (ACM wiring) CMPL CHS and SMS Brick masonry improvements."— Presentation transcript:

1 1

2 2 CES, MBE, GLE Replace ACM soffit – CT/CMPL SMS GLE, MBE, CES Replace Stage Rigging and Lighting (ACM wiring) CMPL CHS and SMS Brick masonry improvements for serviceability - CT Proposed Priority Capital Maintenance Projects Phase I 2015/16 BES, GLE, MBE, CES and SMS Replace select electric panels CHS Electronic school sign SMS Replace gym floor and bleachers

3 SMS and FBE Replace bathroom partitions FBE, CHS and HAE Overlay/re-pave asphalt parking lots and drives Cambria, Technology Pave/overlay asphalt parking lots Proposed Priority Capital Maintenance Projects Phase II 2015/16 BES and CPS Replace select A/C Units CHS Replace Auditorium Moveable Partitions HAE, BEL MPR- Replace flooring

4 Technology Building - Replace windows Montgomery Central Replace windows- lower building Beeks, FBE, GLE Improve Security Fencing CHS Replace lockers Proposed Priority Capital Maintenance Projects Phase II 2015/16 GLE, FBE, HAE Replace concrete sidewalks EMHS Electronic school sign

5 CHS Replace air handling units, C9, B3, A9 CHS, SMS Replace ceiling tile GLE Paved play area Proposed Priority Capital Maintenance Projects Phase III 2015/16

6 Replace Mobile Units (~14 units >/= 18 years old) If not addressed through new capital projects


Download ppt "1. 2 CES, MBE, GLE Replace ACM soffit – CT/CMPL SMS GLE, MBE, CES Replace Stage Rigging and Lighting (ACM wiring) CMPL CHS and SMS Brick masonry improvements."