COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE.

Similar presentations


Presentation on theme: "COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE."— Presentation transcript:

1 COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE

2 Replace Chiller & Rebuild Central Station AHU Replace Gym AHU Add Cooling to Gym Replace General Exhaust Fans, Locker Rooms, Rest Rooms Replace Electrical Service Components Existing Auditorium Remodel Precast Panel and Window Replacement New Auditorium Remodel Existing Stage Craft Roof Replacement Replace Heating Systems in Shop Classrooms Replace locker room AHU & Add Cooling Replace Bleachers Replace PE & Varsity Lockers Renovate South-East Gym Entry Replace Chiller & Rebuild Central Station AHU Replace Gym AHU Add Cooling to Gym Replace General Exhaust Fans, Locker Rooms, Rest Rooms Replace Electrical Service Components Existing Auditorium Remodel Precast Panel and Window Replacement New Auditorium Remodel Existing Stage Craft Roof Replacement Replace Heating Systems in Shop Classrooms Replace locker room AHU & Add Cooling Replace Bleachers Replace PE & Varsity Lockers Renovate South-East Gym Entry SHAWNEE HEIGHTS HIGH SCHOOL

3 Replace Chiller and Rebuild Central Station AHU The chiller and air handler are original to the building and cool all of the south wing of the building and some of the north wing of the building. Replace Gym AHU Two original air-handling units serve the main gym, and are currently heating and ventilating only. Add cooling to gym While replacing the air handling units we will also add air conditioning to the gym. The gym is in the center of the south wing of the building and while everything around the gym is air conditioned, the gym is not. This will help regulate the entire building. Replace general exhaust fans, locker rooms, RR. The exhaust fans in locker rooms and restrooms no longer work or do not assist with proper air circulation. They will be replaced to help provide a healthier student environment. Replace Electrical Service Components We replaced the main service to the north wing and added service to the connecting addition. This project will replace the service components to the south wing of the building. Existing Auditorium Remodel Some minor work will be done to make the existing “cafetorium” a multi purpose room for meetings, seminars and after school practices for large groups. Precast Panel and Window Replacement The precast panels that cover the exterior of the north wing of the building have bowed and are separating from the building in the center. This will be a large project replacing all of the façade skin and most of the windows on the north wing of the building. New Auditorium A new 950 seat auditorium will be constructed on the west side of the building connecting to the cafeteria. It will replace the current “cafetorium” and stagecraft area. Remodel Existing Stage Craft The existing stagecraft room will be repurposed for storage. Roof Replacement The roof covering the main gym in the south wing will be replaced. Replace Heating Systems in Shop Classrooms The ceiling mounted heating units are original to the building. They will be replaced to increase efficiency and reduce maintenance. Replace Locker Room AHU and Add Cooling. These air-handling units provide ventilation to the locker rooms and will be replaced. Air conditioning will be added. Replace Bleachers The bleachers in the main gym are original to the building and in need of replacement. They are no longer ADA compliant, do not have handrails, and are difficult to navigate. Replace PE and Varsity Lockers Like the bleachers these are over 25 years old and will be replaced. They are in a decrepit state and it is difficult to find parts to repair them. New lockers will also provide better security for student belongings. Renovate South-East Gym Entry his entry was originally designed as a second floor entry, but over the years it has become the main entry for students entering and exiting the main gym and locker rooms before and after practice and for contests. Much of the south roof drains through the area students walk. This renovation will create an entry and that isn’t also a drainage area. Replace Chiller and Rebuild Central Station AHU The chiller and air handler are original to the building and cool all of the south wing of the building and some of the north wing of the building. Replace Gym AHU Two original air-handling units serve the main gym, and are currently heating and ventilating only. Add cooling to gym While replacing the air handling units we will also add air conditioning to the gym. The gym is in the center of the south wing of the building and while everything around the gym is air conditioned, the gym is not. This will help regulate the entire building. Replace general exhaust fans, locker rooms, RR. The exhaust fans in locker rooms and restrooms no longer work or do not assist with proper air circulation. They will be replaced to help provide a healthier student environment. Replace Electrical Service Components We replaced the main service to the north wing and added service to the connecting addition. This project will replace the service components to the south wing of the building. Existing Auditorium Remodel Some minor work will be done to make the existing “cafetorium” a multi purpose room for meetings, seminars and after school practices for large groups. Precast Panel and Window Replacement The precast panels that cover the exterior of the north wing of the building have bowed and are separating from the building in the center. This will be a large project replacing all of the façade skin and most of the windows on the north wing of the building. New Auditorium A new 950 seat auditorium will be constructed on the west side of the building connecting to the cafeteria. It will replace the current “cafetorium” and stagecraft area. Remodel Existing Stage Craft The existing stagecraft room will be repurposed for storage. Roof Replacement The roof covering the main gym in the south wing will be replaced. Replace Heating Systems in Shop Classrooms The ceiling mounted heating units are original to the building. They will be replaced to increase efficiency and reduce maintenance. Replace Locker Room AHU and Add Cooling. These air-handling units provide ventilation to the locker rooms and will be replaced. Air conditioning will be added. Replace Bleachers The bleachers in the main gym are original to the building and in need of replacement. They are no longer ADA compliant, do not have handrails, and are difficult to navigate. Replace PE and Varsity Lockers Like the bleachers these are over 25 years old and will be replaced. They are in a decrepit state and it is difficult to find parts to repair them. New lockers will also provide better security for student belongings. Renovate South-East Gym Entry his entry was originally designed as a second floor entry, but over the years it has become the main entry for students entering and exiting the main gym and locker rooms before and after practice and for contests. Much of the south roof drains through the area students walk. This renovation will create an entry and that isn’t also a drainage area. SHAWNEE HEIGHTS HIGH SCHOOL

4 SHAWNEE HEIGHTS MIDDLE SCHOOL Replace Windows Replace General Exhaust Fans, Locker Rooms, Rest Rooms Replace Locker Room Air Handling Units Replacement of Water Service Masonry Restoration Replace Windows Replace General Exhaust Fans, Locker Rooms, Rest Rooms Replace Locker Room Air Handling Units Replacement of Water Service Masonry Restoration

5 SHAWNEE HEIGHTS MIDDLE SCHOOL

6 Remove “Morton” Building Parking for Events Office Renovation Roof Replacement Remove “Morton” Building Parking for Events Office Renovation Roof Replacement TECUMSEH NORTH ELEMENTARY

7

8 Replace Windows Awning Over East Exit Cafeteria Lighting, Ductwork, and Renovation Masonry Restoration Cyclical Caulking Replace Windows Awning Over East Exit Cafeteria Lighting, Ductwork, and Renovation Masonry Restoration Cyclical Caulking TECUMSEH SOUTH ELEMENTARY

9

10 Additional Parking and Drive Lane Replace Boilers Replace Water Heaters Upgrade Controls to add to Global Control System Classroom, Cafeteria, Music, Band and Office Expansion and Renovation Replace/ Repair Windows Metal Panel Repair/ Replacement Finish Replacement Retro-Commission HVAC Systems Additional Parking and Drive Lane Replace Boilers Replace Water Heaters Upgrade Controls to add to Global Control System Classroom, Cafeteria, Music, Band and Office Expansion and Renovation Replace/ Repair Windows Metal Panel Repair/ Replacement Finish Replacement Retro-Commission HVAC Systems BERRYTON ELEMENTARY

11

12 Replace Water Heater Kitchen & Cafeteria Expansion Masonry Restoration Control Joint Repair Roof Replacement Replace Water Heater Kitchen & Cafeteria Expansion Masonry Restoration Control Joint Repair Roof Replacement SHAWNEE HEIGHTS ELEMENTARY

13

14 10 GB/S Fiber Within All Buildings INFORMATION TECHNOLOGY

15 FINANCIAL IMPACT Total Bond $17,500,000 Average 5.16 mills increase over the next 20 Years Staggered with the Existing Bonds to Minimize Impact Average of $59.34 on a $100,000 House over the next 20 Years

16 WHAT YOU CAN DO Educate Yourself and Others Ask Questions and Share answers Be Positive Make Administration Aware as Questions Arise


Download ppt "COMING NOVEMBER 2012 SHAWNEE HEIGHTS BOND REFERENDUM MORE INFORMATION WILL BE AVAILABLE SOON ON THE SHAWNEE HEIGHTS DISTRICT HOMEPAGE."