Prof Ralph V. Locurcio, PE CON 2001 CVE 4070. Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits.

Similar presentations


Presentation on theme: "Prof Ralph V. Locurcio, PE CON 2001 CVE 4070. Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits."— Presentation transcript:

1 Prof Ralph V. Locurcio, PE CON 2001 CVE 4070

2

3 Sequence Single Family House - 3,000 square feet Duration 1 General Conditions 21 2 Apply for Permits 1 3 Site Work 3 4 Pour Foundation 19 5 Pour floor slab 8 6 Framing or masonry for walls 22 7 Construct roof & dry in 16 8 Complete exterior finishes 15 9 Rough-in plumbing & electrical& tel 14 10 Rough-in HVAC 4 11 Install insulation 4 12 Install drywall 5 13 Paint and wallpaper interior 10 14 Install kitchen & cabinets & trim 5 15 Install plumbing fixtures 4 16 Install electrical fixtures 4 17 Install HVAC equipment 3 18 Install carpet, tile and appliances 6 19 Install landscaping 3 20 Install driveway 2 21 Final inspection for CO 1 22 Make final repairs 2 23 Cleanup for occupancy 1 Total 173 Actual 140

4 WBS for Senior Design Activity or Task Assigned PlannedActualPlannedActualFloat%Done person) Start Finish LagComp Phase-1 (5%) General Conditions Engineer-12123-Aug 3-Sep 0 Apply for Permits Engineer-2123-Aug 29-Aug -5 Phase-2 (15%) Site Work 3 Pour Foundation 19 Pour floor slab 8 Framing or masonry for walls 22 Construct roof & dry in 16 Phase-3 (50%) Complete exterior finishes 15 Rough-in plumbing & electrical& tel 14 Rough-in HVAC 4 Install insulation 4 Install drywall 5 Phase-4 (95%) Paint and wallpaper interior 10 Install kitchen & cabinets & trim 5 Install plumbing fixtures 4 Install electrical fixtures 4 Install HVAC equipment 3 Install carpet, tile and appliances 6 Phase-5 (100%) Install landscaping 3 Install driveway 2 Final inspection for CO 1 Make final repairs 2 Cleanup for occupancy 1

5

6 Note: The following items are required for full credit: 1. Schedule must use MS Project 2. Use Septemnber 1 as your starting date for the construction 3. Calculate start & finish dates based on your flow chart & Sept 1 start 4. Schedule must be on one page; landscape format 5. Be sure to arrange the tasks in "logical" construction order 6. Must use task sequencing & overlap per your Flow Diagram 7. Add lead or lag to separate or overlap a task or sequence of tasks 8. All activities must be labeled with activity names to the right of the bar 9. All activities must show % complete to left of bar 10. Show % complete in the activity bar for all tasks 11. All activities must be completed in less than 173 days 12. All activity bars must be colored blue & use cross hatch pattern 13. Include the 3 "phase" activities with black bars as: (1) Planning (2) Foundation & Site (3) Vertical (4) Exterior & Finish 14. Include a title & your name in the heading