Presentation is loading. Please wait.

Presentation is loading. Please wait.

Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,

Similar presentations


Presentation on theme: "Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,"— Presentation transcript:

1 Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August, 2010 Contract Sum:$5,001,150 Change Orders to Date:$0 Current Phase:1 (On Schedule) Estimated Completion:6% June 2009

2 Russell Cave Elementary – Renovation Rendering of Final Façade June 2009

3 Russell Cave Elementary – Renovation Work Completed in Last 30 Days: Footing and foundation walls continue: 40 feet of footings poured and 38 feet of foundation wall have been poured Interior wall footings: 200 feet have been poured. Footings at new mechanical enclosures have been poured. Pads for mech units at kitchen and new transformer and generator have been poured. Current Work Effort (June): Additional work on footings and foundation at the new addition will continue. New floor slab will be poured in two weeks, weather permitting. Installation of the new leach fields for the septic system will begin installation in the front lawn of the building. Kitchen/Cafeteria demolition and renovation will begin. Renovation of (4) classrooms on the south side will begin. Masonry restoration on the existing building will begin the week of June 8 th. June 2009

4 Russell Cave Elementary – Renovation Foundation Work 6.2.09 June 2009 Foundation Work 6.2.09


Download ppt "Russell Cave Elementary – Renovation Architect: Pearson & Peters Architects General Contractor: Congleton-Hacker Construction Substantial Completion Date:August,"

Similar presentations


Ads by Google