Presentation is loading. Please wait.

Presentation is loading. Please wait.

Scheme of location of objects of the Dehkanabad plant

Similar presentations


Presentation on theme: "Scheme of location of objects of the Dehkanabad plant"— Presentation transcript:

1 Construction of Dehkanabad plant of potassium fertilizers on the base of Tyubegatan potash deposit

2 Scheme of location of objects of the Dehkanabad plant
50 km 41 km 49 km (35 km - village road) Processing complex Sodium chloride storehouse Karshi Guzar Dehkanabad Dehkanabad railway station Railroad stockroom Turkmenistan Tyubegatan potash deposit Scheme of location of objects of the Dehkanabad plant Housing

3 Created capacities of the plant
200 thousand tones of potassium fertilisers per annum К2О contamination, not less % 60 Moisture, not less % 2 Ca + Mg, not less (%) 0,4 NaCl, not less % Insoluble matter, not less % 0,3

4 СПОСОБЫ ДОБЫЧИ И ПЕРЕРАБОТКИ РУДЫ
Method of development Mining method. Volume of ore extraction thous. tons/year. Mining combine with point sequence is used. Method of ore processing Flotation method. Ore sharing to NaCl and KCl KCl – 200 thous. tones/year NaCl and admixtures – 375 tones/year Merit extraction of KCl from ore - 85%.

5 ENTERPRISE STRUCTURE Mine with additional complex Transport gallery for ore transporting L= 500 meters Processing complex – 700 thous. tones/year Sodium chloride open warehouse – 70 hectares Railroad warehouse of ready-made product - 10 thous. tones/year Housing for 2.5 thousand inhabitants

6 RAW MATERIAL BASE Potash ore Tyubegatan deposit (КCl in ore - 36,88%).
Total ore resource – 309 ml. tones. Resources of processing site I ml. tones (31.9 ml. tones of KCl). Ore requirement thous tones/year Technical water Dehkanabad water reserve. Requirement – ml м3 per annum Feed water Aksu-Dehkanabad sluice (under construction). Requirement м3 per day Electric power According to Uzbekenergo specifications. Requirement - 6 МWТ per annum Natural gas Beshbulak . Requirement - 5 ml м3 per annum (without considering the requirements of housing and attached populated area)

7 PERIOD OF LIFECYCLE AND PRODUCTION
Construction period 50 months Lifecycle period 43.3 years Capacity load: 1 year 2 and further periods 80% 100%

8 270 KCl (physical compound)
MARKET thous tn Country requirement (according to Ministry of agriculture and water resources of Uzbekistan) 270 KCl (physical compound) Possible export to the neighboring countries (Tajikistan, Kirghizistan, Kazakhstan, Turkmenistan and Afghanistan) 50 Main competitors Russia, Byelorussia, Turkmenistan (if similar plant is built)

9 MAIN TRENDS OF TECHNICAL ECONOMICAL ASSESSMENT *
Capacity, thous. tones 200 Capital investments, USD ml 85 including: bank credits centralized sources (equivalent) 58 27 Price of 1 ton of product at the warehouse, USD. 95 Volume of commodity output, USD ml. 19 Number of created workplaces, persons. 600 Credit reimbursement period, years (preliminary) 15 Period of construction, years 4 Pay-back period, years (if profitable approx 30%) 10 * Estimated data will be determined in technical economical assessment TEO


Download ppt "Scheme of location of objects of the Dehkanabad plant"

Similar presentations


Ads by Google