1 Joint Stock Company “Uzbuildmaterials” Tashkent, May 2012

2 AGENDA Information about JSC “Uzbuildmaterials” 1. “Organization of production of Porcelain Stoneware” List of investment projects in the sphere of building materials 2. “Organization of production of sanitary ware ceramics” 3. “Organization of production of architectural glass ” Status of building materials industry in Uzbekistan

3 The share of civil works in GDP Dynamics of volume building materials production

4 Growth rates of indicators in the investment sphere ( in the comparable prices in % to previous year ) № Name of indicators 20042005200620072008200920102011 Mid- annual growth rates Growth rates 2003-2011 1GDP107,4107,0107,5109,5109,0108,0108,5108,3108,2187,1 2 Investment to economy 105,2107,0109,1123,0128,3 109,2107,9114,8292,9 3 Investment to industry 102,5120,2114,6116,1123,7118,1109,8106,3113,9279,5 4 Investment to building materials industry 135,8188,3172,1133,8153,6176,8141,3111,9151,72528,3 5 Construction and insulation works (civil works) 109,7109,2111,7115,7103,8133,5108,1108,5112,5251,6

5 INVEST PROJECTS which was successfully realized

6 «Organization of production Dry Mix with the capacity of 48000 tons at JV “Bukhara Gips”» Foreign investor – “KNAUF” (Germany) Production start - 2010 year The cost of the project – 1.5 mln. USD «Organization of production gypsum board with the capacity of 20.0 mln.m2 at FC “KNAUF GIPS Bukhara”». Foreign investor – “KNAUF” (Germany) Production start - 2011 year The cost of the project – 51.5 mln. USD

7 «Construction of cement grinding station in Yangiyul for processing of the clinker of production JSC Bekabadtsement” with the capacity of 1.0 mln.tonn» Production start - 2010 year The cost of the project – 33.2 mln. USD Project owners- JSC “Kuvasaycement” “Caspian recourses” Ltd (Kazakhstan) Under Constructions !!! Modernization of operating production with construction of the new line production of cement clinker by dry way with the capacity of 850 thousand tons at JSC “Bekabadtsement” Tashkent region

8 Cooperation

9 INVESTMENT OFFERS in the sphere of building material production

10 “Organization of production Porcelain Stoneware” Purpose: Produce and Export of new product- Porcelain Stoneware Capacity - 2.0 million m2 per a year Total cost of the project - 16,0 million USD Technology - 8,5 million USD Construction,etc - 7,5 million USD Factory place – FIZ “Angren” Payback period – 4 years Market – Uzbekistan, Central Asia, and Afghanistan

11 Import and Demand for Porcelain Stone ware For the last 4 years import of Porcelain stoneware to Uzbekistan was 831.8 thousand m2 for the sum 2.5 million USD. The demand for Porcelain stone ware in the short term will make about 1,5 million m2 per a year. At current, there are no Central Asia nations, which own a qualified Porcelain Stoneware plant with modernized production facilities

12 Provision of raw material The name of raw material Deposit name The authorized stocks (million tons) Provision (Years) KaolinAltin tay 5,4over 50 Quartz sandDjeroy 205,0over 100 FeldsparLyangar 27.8over 50 DolomiteDehkanabad 2.6over 50

13 Purpose: Produce and Export of sanitary ware ceramics (toilet bowl, wash bowl, tanks, bidet, etc. ) Capacity - 210 000 items Total Cost of Project - 12,5 million USD Technology - 7,2 million USD Construction,etc - 5,3 million USD Factory place - FIZ “Angren” Payback period – 3,2 years Market – Uzbekistan, Central Asia, and Afghanistan “Production of sanitary ware ceramics”

14 Product Meas. unit ProductionConsumptionGap Sanitary ware ceramics thousand pieces 0195- 195 Import and consumption of sanitary ware in Uzbekistan - At current, there are no CIS nations, which own a qualified sanitary ware plant with modernized production facilities - The volume of import sanitary ware ceramics to Uzbekistan 2009 – 140 000 items - 2,5 million USD 2010 – 205 000items - 3,73 million USD 2011 – 228 000 items - 3,86 million USD

15 Provision of raw material The name of raw material Deposit name The authorized stocks (million tons) Provision (Years) KaolinAltin tay 5,4over 50 Quartz sandDjeroy 205,0over 100 FeldsparLyangar 27.8over 50 DolomiteDehkanabad 2.6over 50

16 Organization of production of architectural glass Capacity – 400 tones/ per day (10 million sq.m, 4 mm calc) Total Cost of Project - 70,0 million USD Technology - 45,0 million USD Construction,etc - 25,0 million USD Demand for glass in 2012-2015 – till 125 000 tones Payback period – 6 years Possibility of Export: Central Asia and Afghanistan

17 Production and consumption of glass in Central Asia (thousand tones) №Country Production (annual capacity) Consumption Gap 1Kazakhstan-100- 100 2Kyrgyzstan9310+ 83 3 Uzbekistan (JSC “Kqartz”, JV “Gazalkent oyna”) 65150- 85 Total 158260- 102

18 Provision of raw material Raw material type Deposit name Approved deposits (million tones) Provision (years) Quartz sandDjeroyskoe20550 LimestoneUrgazskoe96.6over 100 DolomiteDehkanabad2.6over 50 Calcium soda Kungrad soda plant production 0.1 per a year FeldsparKarichsay 24,3 over 50

19 Thank you for your attention! Contacts: Contacts: www.uzsm.uz chairman@uzsm.uz uzbuild@ars.uz Теl: +99871 2522063/5 Fax: +99871 2557707 www.uzsm.uzchairman@uzsm.uz uzbuild@ars.uz JSC “Uzbuildmaterials”