T-76.115 Project Review Tetrastone [Iteration 2] 12.02.2004.

Similar presentations


Presentation on theme: "T-76.115 Project Review Tetrastone [Iteration 2] 12.02.2004."— Presentation transcript:

1 T-76.115 Project Review Tetrastone [Iteration 2] 12.02.2004

2 T-76.115 Project Review 2 Agenda  Project status (5 min)  Achieving the goals of the iteration  Project metrics  Problems  Used work practices (3 min)  Completed work (10 min)  Presenting the iteration’s results  Demo  Plans for the next iteration (5 min)

3 T-76.115 Project Review 3 Status of planned goals of the iteration Deliverables: Updated Project Plan Updated Requirements Specification Updated Technical Specification Updated Test Cases Test report and test log Progress report User's manual Customer deliverables: Updated version of the GUI Rest of UC-06 functionality Use cases 07-11 Use case 14

4 T-76.115 Project Review 4 Status of planned deliverables of the iteration Updated Project Plan  Hours updated  I3 tasks added  I3 goals updated  Static risks moved from RMP into PP Updated Requirements Specification  No major updates Technical specification  Some updates done Updated Test cases  Test cases updated from the Iteration 1 Test report and test log  New test report and log created User guide  First version created  Will be moved into RosettaNet EUI in next iteration  Will acts as an online help

5 T-76.115 Project Review 5 Status of planned deliverables of the iteration Customer deliverables:  Documentation  Generally OK  New documents – User guide initial version  Use case 01-05  Organization removal has to be added  5h of work  Use case 06 : Add / Delete / Modify PIP  Saving undone, rest of the functionality ok  Use case 07 : Add Trading partner info  Ok  Use case 08 : Add / Delete / Modify PIP (org. specific)  UI done  Todo: Look&Feel, saving, view  Use cases 09: Add / Modufy / Delete user account  Ok

6 T-76.115 Project Review 6 Status of planned deliverables of the iteration  Use case 10: initialize new PIP exchange  Frame and view done  Saving plus other features not done  Use case 11:  Unfortunately not implemented  Implementation moved to I3  Use case 12: Browse sent received PIPs  Done  Maybe some filtering rules have to be added  Use case 15: Send message  Ok  Use case 16: Receive message  Ok More can be seen on Demo later!

7 T-76.115 Project Review 7 Working hours by person Realized hours by person: Plan in the beginning of this iteration MEMBERHOURSDIFF Anssi72,5-7,5 Hanna60-20 Henry72,5-7,5 Kimmo84,7+4,7 Kjell75,5-4,5 Mikko53,50-1,5 Mikael68,5-11,5 TOTAL487,2 Phase Mikko Kjell Anssi Kimmo Henry Mikael Hanna Total Real: PhaseMikkoKjellAnssiKimmoHenryMikaelHannaTotalReal: PP503520 3520200161,5 I1304555405040 300 317 I25580 535 440 I3303540 3540260 DE4510 105 Total210205 190200 1901400 Problems: Long iteration – a lot of hours! Holidays A lot of work to do!

8 T-76.115 Project Review 8 Changes to the project  The group was not able to complete the UC 12 in this iteration  The implementation was moved to next iteration  No other major changes were made

9 T-76.115 Project Review 9 Risks  At this stage almost all the risks have been mapped and almost no new risks have been identified Materialized risks?  Time tracking & estimation – The iteration has been very long and there has been a lot of holidays during it, so there has been problems is time estimations.

10 T-76.115 Project Review 10 Work practices Code review  This was experienced in one session during the I2 phase  The manual code reading / ‘debugging’ was considered very useful, since tens of bugs and errors were found  Number of lines in code inspected:500  Number of found major bugs:3  Number of found minor bugs:6  Number of improvement suggestions:15 But!  Total hours used in code inspection: 10  So the manual inspection of code is very time consuming and can not be effectively applied into large amounts of code - at least if the schedule is tight.

11 T-76.115 Project Review 11 Example: Demo RosettaNet End-user Interface DEMO 2.0

12 T-76.115 Project Review 12 Plan for the next iteration Goals:  Finalize and fine tune the started use cases  Implement the few not started use cases Deliverables:  Updated Project Plan  Updated Requirements Specification  Updated technical specification  Updated test cases  Test report and test log  Peer test plans  Peer test reports  Updated User’s manual  Progress report Customer deliverables:  Updated version of the GUI  Fixed version of use cases 01-15  Use cases 12-13

13 T-76.115 Project Review 13 Plan for the next iteration Will be updated when I get the tasks out of the Trapoli system!

14 T-76.115 Project Review 14 Plan for the next iteration Will be updated when I get the tasks out of the Trapoli system!