T-76.115 Project Review VirtuCo PP Iteration 29.10.2003.

Similar presentations


Presentation on theme: "T-76.115 Project Review VirtuCo PP Iteration 29.10.2003."— Presentation transcript:

1 T Project Review VirtuCo PP Iteration

2 T Project Review 2 Agenda  Project status (15 min)  achieving the goals of the iteration  project metrics  Used work practices (2 min)  Completed work (4 min)  presenting the iteration’s results  demo  Plans for the next iteration (5 min)

3 T Project Review 3 Status of planned goals of the iteration  Goal 1: Organize the project  OK  Goal 2: Plan the project  OK  Goal 3: Understanding the domain  OK  Goal 4: Requirements specification on general level including most important use cases  OK, defined even further  Goal 5: Test critical technological functionality to know what can be done  OK, for emulators.

4 T Project Review 4 Status of planned deliverables of the iteration  Project Plan  OK, except for sections 6.3 trough 6.6 which will be planned later  Requirements document  OK  Technical considerations branched

5 T Project Review 5 Realization of the tasks  Requirements documentation  User stories to use cases  Elicitation and analysis  More games  Study domain X  Requirements documentation  Brainstorming  Study technology X  Personal SE practice  Process not constructed  Meeting practices  Plan work methods and tools  Symbian vs. MIDP2.0  Risk management  More thorough plan  General  Unfamiliar with most members working efficiency

6 T Project Review 6 Working hours by person  Work efficiency  Member time restrictions  Uncertain about reports RealPlanDiff Hannu Jorma Kaarle Kai Petteri Sami Ville Total Realized hours in this iterationPlan in the beginning of this iteration PPI1I2I3DETotal Hannu Jorma Kaarle Kai Petteri Sami Ville Total Latest plan (inc. realized hours and other updates) PPI1I2I3DETotal Hannu Jorma Kaarle Kai Petteri Sami Ville Total

7 T Project Review 7 Quality metrics  Issues taken from document reviews PPTotal Reported 92 Closed 92 Open 0 Issue metrics BlockersCriticalMajorMinorTrivialTotal Total open This iteration reported

8 T Project Review 8 Risks  Risk management document is done  No risks realized

9 T Project Review 9 Work practices  Time reporting was used  Confusion about where to report and how  Software configuration management  First thing to do  Some problems with software  Versioning works well  Next iteration  Meeting practices  Process construction and tuning  Design patterns  Unit testing

10 T Project Review 10 Results of the iteration  Documentation  Project plan  Risk management plan  Requirements document  Technical considerations  Studies  XP  MIDP2.0  Symbian  Other  Understanding about what to do

11 T Project Review 11 Example: Project plan  Background of the project  Project organization  Project goals  Project resources  Project practices and tools  Iterations

12 T Project Review 12 Plan for the next iteration  Goals  Design message transmission capable architecture  Produce simple conversation demo  Deliverables  Communication between server and client  Discussions enabled in mobile community  Technical specifications  Test case specifications  Test report  Risks  Platform capabilities  Process problems  Schedule  task dependencies


Download ppt "T-76.115 Project Review VirtuCo PP Iteration 29.10.2003."