1 T-76.4115 Iteration Demo BaseByters [I1] Iteration 04.12.2005

2 T-76.4115 Iteration demo 2 Agenda  Project status (15 min)  achieving the goals of the iteration  project metrics  Work results (15 min)  presenting the iteration’s results  demo  Used work practices (5 min)  Discussion (5 min)

3 T-76.4115 Iteration demo 3 Introduction to the project  Customer: Nokia Networks / Service Business Unit  Customer representatives:  Jari Jyrävä – business issues  Antti Ahonen – technical issues  Project team:  Management team: Jukka Kurkinen (PM), Tapio Janasik (QaM), Sami Saariaho (LD)  Development team: Janne Ruskeeniemi, Semi Arajuuri, Sun Jian, Pu Fan  Project’s purpose  To produce a database upgrade tool which enables automatic database upgrades from unknown database structure.

4 T-76.4115 Iteration demo 4 Stakeholders and staffing Mgmt Team Jukka Kurkinen PM Sami Saariaho LD Tapio Janasik QA Janne Ruskeeniemi Dev RE, DataBase, Java Semi Arajuuri Dev DataBase, SQL Sun Jian Dev Java, testing Pu Fan Dev Java, XML, testing Customer Jari Jyrävä (business) Antti Ahonen (technical) Mentor Markus Rautopuro

5 T-76.4115 Iteration demo 5 Status of the iteration’s goals  Goal 1: Design core architecture  OK  Goal 2: Implement selected use cases (UC2 and UC4)  OK  Goal 3: Deliver the first limited version of the system for trialing  OK

6 T-76.4115 Iteration demo 6 Status of the iteration’s deliverables  Project plan  OK  QA plan  OK  Requirements document  OK  Technical specification  OK  Test cases, test report and test log  OK  SEPA diaries  OK  Progress report  OK

7 T-76.4115 Iteration demo 7 Realization of the tasks

8 T-76.4115 Iteration demo 8 Working hours by person  Major discrepancies in realizations:  Effort estimation inaccuracies RealPlanDiff JKu 50,556,5-6 TJa 88,596,5-8 SSa 1091081 JRu 4194-53 SAr 91,56823,5 SJi 82,55824,5 PFu 72639 Total 535544 Realized hours in this iteration

9 T-76.4115 Iteration demo 9 Working hours by person RealPlanDiff JKu 50,556,5-6 TJa 88,596,5-8 SSa 1091081 JRu 4194-53 SAr 91,56823,5 SJi 82,55824,5 PFu 72639 Total 535544 Realized hours in I1 iterationPlan in the beginning of this iteration PP Σ I1I2Total JKu 55 4075170 TJa 23,5 73,573170 SSa 14 7086170 JRu 22,5 6067,5150 SAr 3360107170 SJi 1160109170 PFu 1160109170 Total 120 423,5626,51170 Latest plan (inc. realized hours and other updates) PPI1 Σ I2Total JKu 5550,5105,564,5170 TJa 23,588,5102,567,5170 SSa 1410912347170 JRu 22,54163,586,5150 SAr 391,594,575,5170 SJi 182,583,586,5170 PFu 1727397170 Total 1205356555151170

10 T-76.4115 Iteration demo 10 Quality metrics I I1I2Total Reported 24- Closed 23- Open 1-1 Bug metrics BlockCrashMajorMinorTweakTotal Total open 000101 This iteration reported 20611423 BlockCrashMajorMinorTweakTotal Conf.Services 11 DataAccess 11 Error Handling 235 File I/O 11 Log Services 11 SQL Services 22 UI 426 XML Services 2327

11 T-76.4115 Iteration demo 11 Quality metrics II Other QA metrics  unit test coverage: 41% (Coverlipse)  calculated using integration test suite  Not all trivial exceptions covered  help methods (for testing for examle) not covered  Data Access Service not included since there is a problem with Coverlipse and reading db over network  UI not JUnit tested (tested during system tests)  not included in coverage report  code reviews  Static analysis: https://baseb.nbl.fi/staticanalysis/https://baseb.nbl.fi/staticanalysis/  Some refactoring needed (  I2)  source code metrics  See page 12 Blocking bugs found:  Bug11: NullPointerException from XmlGenerator (null objects)  Bug17: NumberFormatException from XmlParser (“null” input string)

12 T-76.4115 Iteration demo 12 Quality assessment by components Functional component CoverageQualityComments UI3 Fault tolerance a lot better, errors are logged. Data Access2 Looks good, but bug 26 about portability needs to be investigated. Error handling2 Looks good. File I/O2 Looks good. Logging3 Logging is informative (a lot is logged though). SQL service2 Bug fixing done, looks good. XML service2 Lots of bug fixing done, looks good. Core2 We are doing alright, but issues about version id's need to be investigated. Conf. services2  We are doing alright. Legend Coverage: Quality: 0 = nothing  = quality is good 1 = we looked at it  = not sure 2 = we checked all functions  = quality is bad 3 = it’s tested

13 T-76.4115 Iteration demo 13 Software size in Lines of Code (LOC) PPI1I2 UI / Command line0425 /- - UI / GUI446 /- - Core842 /80% - Data Access0296 /- - File I/O064 /45% - Logging058 /60% - SQL service0256 /76% - XML service0552 /69% - Conf. services042 /39% - Total LOC, DbUpgrader2981- Unit tests LOC437- Total LOC03418- Total Unit Test Coverage (unit test code not included) 41%- Comments (COM)0?-

14 T-76.4115 Iteration demo 14 Changes to the project  No major changes during the I1.

15 T-76.4115 Iteration demo 15 Risks  Risk status:

16 T-76.4115 Iteration demo 16 Results of the iteration  Technical specification  PL/SQL script  User interface  UC2 and UC4

17 T-76.4115 Iteration demo 17 System overview The system consists of the following high level features:  It handles upgrade from unknown database structure to given target structure.  It supports both Oracle and MySQL.  It has a graphical user interface, a command line interface and it can be used from another Java application.  It has a PL/SQL based upgrade solution for Oracle databases.  It can create an XML description file of existing database. This file can be then used to specify the target structure for upgrade. Use case diagram :

18 T-76.4115 Iteration demo 18 Technical specification – components and services Components and services of the system:

19 T-76.4115 Iteration demo 19 Technical specification – core architecture Core architecture of the system:

20 T-76.4115 Iteration demo 20 User interface and UC 2 and UC4  Demo…

21 T-76.4115 Iteration demo 21 Used work practices  Time reporting  Time reporting done according to iteration task list (little variation to task list)  Iterative development  Tasks identified and planned at the beginning of the iteration  Implementation status reviewed in the middle of the iteration  Not possible tasks transferred to I2  Risk management  Risks identified in the risk workshop and documented  Risk status gone trough in project team meetings  Communication  Face2face communication in meetings  Emails  IRC discussions  Phone calls and conference calls  Wiki used for meeting memo delivery and discussions  Subversion used for document store and delivery  Effort estimation  Effort estimation done by LD and developers  Work practices to be changed in I2:  Time reporting could be still made more accurate to match exactly task list  Effort estimation could be made more accurate