Presentation is loading. Please wait.

Presentation is loading. Please wait.

NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1.

Similar presentations


Presentation on theme: "NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1."— Presentation transcript:

1 NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1

2 Outline LRP2010 Executive Summary – Purpose, Scientific & Societal Scope, Objectives – Science Case – Research Infrastructures & Networking – Scientific Themes Recommendations & Roadmap Research Infrastructures & Networking – Existing Research Infrastructure & Upgrades – Future Research Infrastructures – Collaboration at European and Global Level Scientific Themes – Hadron Physics – Phases of Strongly Interacting Matter – Nuclear Structure & Dynamics – Nuclear Astrophysics – Fundamental Interactions – Nuclear Physics Tools & Applications Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 2

3 Hadron Physics Facilities Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 3 GSI: 2.5 GeV/c, FOPI, HADES FAIR: 15 GeV/c anti-protons @ PANDA 40 GeV/n HIs @ CBM Low-E anti-protons @ FLAIR PAX? ENC? FZ Jülich: 2.5 GeV p @ COSY MAX-lab: 0.25 GeV CERN: 200 GeV μ +-, hadrons @ COMPASS 5.5 TeV/n HIs @ ALICE Low-E anti-protons @ AD LHeC? INFN LNF: 1 GeV e + e - @ DA NE 16 MeV K MAMI: 1.5 GeV e, ELSA: 3.5 GeV e,

4 Guenther Rosner4 NuPECC LRP2010 Town Meeting Madrid, 2/6/10 CERN: ISOLDE Radioactive HI beams HIE-ISOLDE Radioactive HI beams EURISOL? GSI: HI beams FAIR: NuSTAR Radioactive HI beams GANIL: SPIRAL (Radioactive) HI beams SPIRAL 2 Radioactive HI beams EURISOL? INFN LNL: HI beams SPES Radioactive HI beams EURISOL? JYFL: HI beams KVI: HI beams INFN LNS: HI beams IPN-ALTO: (Radioactive) HI beams Nuclear Structure Facilities

5 LRP2010 Recommendations Complete ESFRI Facilities – FAIR with PANDA, CBM, NuSTAR and FLAIR – SPIRAL2 at GANIL including S3 and DESIR Complete Major Upgrades – HIE-ISOLDE at CERN – SPES at INFN-LNL – AGATA Enhance potential of ALICE – Fully develope nuclear beam programme – Upgrade to new kinematical regime Support Theory – Develop projects for advanced studies related to the experimental roadmap – ECT* in Trento Guenther Rosner5 NuPECC LRP2010 Town Meeting Madrid, 2/6/10

6 Recommendations Contd Fully Exploit Existing Facilities – Lepton beam facilities ELSA in Bonn, MAMI in Mainz, COMPASS at CERN, DANE at INFN-LNF, and the proton beam facility COSY at FZ Juelich – Stable heavy ion beam facilities at JYFL, KVI, GSI, GANIL, INPO, ISOLDE, INFN-LNL and INFN-LNS – Smaller scale labs across Europe – Underground astrophysics facility LUNA at Gran Sasso – AD at CERN and its upgrade ELENA Promote Planning for Future Large-Scale Facilities – Inclusion of EURISOL in future updates of the ESFRI list – Intense radioactive ion beam at ISOL@MYRRHA in Mol – Technical Design Studies for PAX and ENC at FAIR – Technical Design Study for LHeC at CERN Guenther Rosner6 NuPECC LRP2010 Town Meeting Madrid, 2/6/10

7 20 10 20 1520 20 25 FAIR PANDA R&D Construction CommissioningExploitation CBM R&D Construction CommissioningExploitationSIS300 NuSTAR R&D Construction CommissioningExploit.NESR FLAIR PAX/ENC Design Study R&D Tests Construction/CommissioningCollider SPIRAL2 R&D Constr./Commission.Exploitation150 MeV/u Post-accelerator HIE- ISOLDE Constr./Commission.ExploitationInjector Upgrade SPES Constr./Commission.Exploitation EURISOL Design Study R&D Preparatory Phase / Site Decision Engineering Study Construction LHeC Design Study R&D Engineering Study Construction/Commissioning Roadmap New Large-Scale Facilities


Download ppt "NuPECC Long Range Plan 2010 Perspectives for Nuclear Physics Research in Europe Guenther Rosner NuPECC LRP2010 Town Meeting Madrid, 2/6/10 1."

Similar presentations


Ads by Google