Presentation to Maxwell Place Homeowners Association 1.

Similar presentations


Presentation on theme: "Presentation to Maxwell Place Homeowners Association 1."— Presentation transcript:

1 Presentation to Maxwell Place Homeowners Association 1

2 Agenda Project Needs/Benefits Site Plan Construction Process Access at the Site Noise Reduction Effect on Businesses Communications with Residents Restoration of the Site On-going Maintenance Schedule Questions 2

3 Project Needs/Benefits Reduce and Protect Against Flooding Pump Station Minimizes /Eliminates Street Flooding in Northern Hoboken Integral Part of Overall Plan (“Rebuild by Design”) to Guard Against Rising Sea Levels/Superstorm Sandy Event 3

4 Project Needs/Benefits Provides Maxwell Place Infrastructure with Greater Resiliency Pump Station Reduces Potential for Backups in Long-Term for Maxwell Place Private System New Emergency Generator for Backup Power at 11th Street Pump Station Protects the PSE&G Substation that provides power to Maxwell Place 4

5 Project Site Plan 5

6 Construction Process: Noise Reduction Noise Reduction Hours of Construction Limited to Reduce Community Disruption: Monday through Friday Only Between Hours of 8 am to 5 pm No Weekend or Off-Hour Construction Activity No Pile Driving East of Hudson Street Substantially Less Noise without Need for Piles Limited Truck Traffic Concentrated During Excavation and Concrete Placement No Need for Constant Trucks In and Out of Site 6

7 Construction Process: Access Access at the Site Sidewalks South Sidewalk: Open at All Times South Sidewalk: Maintain Drop-Offs for School North Sidewalk: Brief Intervals of Closure Between Sinatra Drive North and Hudson Street Traffic Uninterrupted Access to Parking Garage East-Bound Traffic Lanes (Between Sinatra Drive North and Hudson Street): Open at All Times West-Bound Traffic Lanes: Temporary Closures Parking No Street Parking During Construction Hours Parking During Non-Construction Hours & on Weekends 7

8 Construction Process: Businesses Effect on Local Businesses Sidewalk Access Permits Unimpeded Foot Traffic to Local Businesses Traffic Controls at Site Should Not Impact Businesses Drop-off Point Will Be Maintained During Construction Parking Access May Have Limited Effect Parking Garage Access Remains In Place Restrictions on Street Parking May Have Limited Impact 8

9 Construction Process: Communications Keeping Residents Informed Monthly Progress Report Posted on North Hudson Sewerage Authority Website http://www.nhudsonsa.com/ http://www.nhudsonsa.com/ Onsite Construction Field Office Executive Director and Authority Engineer Available for Update Meetings 24/7 Community Outreach Hotline 9

10 Restoration of Site Street Complete repaving of 11th Street Both Sides Between Sinatra Drive North & Hudson Street Restoration of Island Landscaping Blend Covers into Landscape Plan 10

11 H5 Wet Weather Pump Station Control Vault View

12 H5 Wet Weather Pump Station View 11 th Street from Sinatra Drive North

13 On-Going Maintenance Pump Station 2 Hours Monthly Maintenance Visits Safety Checks Equipment Inspection & Preventative Maintenance Control Vault 2 Hours Weekly Maintenance Visits Controls Check Preventative Maintenance 13

14 Schedule November/December 2014 – Public Advertisement January/February 2015 – Contract Award April 2015 – Commence Construction February 2016 – Construction Completed March 2016- Ribbon Cutting 14

15 Questions? North Hudson Sewerage Authority 1600 Adams Street Hoboken, NJ 07030 Phone: (201)-963-4685 http://www.nhudsonsa.com/ 15