1 75 Express Lanes Segment D Construction From South of Sheridan Street to North of Griffin Road Presentation to Ivanhoe Community August 27, 2014

2 Project Team Paul Lampley, P.E. – FDOT Construction Program Manager Antonio Castro, P.E. – FDOT Construction Project Manager Robert Bostian, P.E. – FDOT Design Program Manager Scott Gombar, P.E. – CEI Senior Project Engineer, Eisman & Russo Design-Build Firm – Ranger Construction/Wantman Group, Inc Monica Diaz– Construction Public Information Officer I-75 Express – Segment D

3 Project Location Third of Four segments (Segment D) South of Sheridan Street to North of Griffin Road (3.7 miles) Project Overview I-75 Express – Segment D

4 Project Overview Segment D Construction Schedule and Cost – Construction start date: September 2014 – Estimated construction completion date: Summer 2018 – Project cost: $80 million I-75 Express – Segment D

5 Scope of Work Constructing Express Lanes in the existing I-75 median Constructing entrance and exit ramps to the Express Lanes from the General Purpose Lanes Constructing sound barrier walls along nine neighborhoods Reconstructing the Sheridan Street Interchange – Widening and replacing the bridge deck – Reconfiguration of the entrance and exit ramps I-75 Express – Segment D

6 Scope of Work Constructing a new bridge for the Express Lanes over the C-11 Canal (just north of Griffin Road) Installing additional Traffic Cameras, Dynamic Message Signs and Toll Gantries Adding new signage, signals, lighting and landscaping I-75 Express – Segment D

7 75 Express Lanes Typical Section Express Lanes – Centered in existing I-75 median Separated from the General Purpose Lanes – Two northbound and two southbound lanes Separated by concrete barrier wall – Full width paved shoulders I-75 Express – Segment D

8 Express Lanes Ingress & Egress Ramps NOT TO SCALE I-75 Mainline Visit the Access Points page to view all of the Ingress and Egress ramps I-75 Express – Segment D

9 C-11 Canal Bridge New Improvement Features Scope of Work: New Express Lane bridge

10 I-75 Express – Segment D Sheridan Street Interchange

11 Scope of Work: Constructing drainage ponds within the interchange Widening the Sheridan Street bridge to the north and replacing the existing bridge deck Installing additional signalized turn lanes Installing new sidewalk on the bridge Upgrading signage, lighting, landscaping and signals Sheridan Street Interchange New Improvement Features I-75 Express – Segment D

12 All travel lanes on I-75 and Sheridan Street will remain open during peak hours Lane closures permitted during the following times: – Eastbound (west of I-75): Midnight to 7 a.m., 11 a.m. to 2 p.m. and 9 p.m. to Midnight – Eastbound (east of I-75): Midnight to 7 a.m. and 10 a.m. to Midnight – Westbound (west of I-75): Midnight to 7 a.m. and 9 a.m. to 1 p.m. – Westbound (east of I-75): Midnight to 7 a.m., 9 a.m. to 5 p.m. and 7 p.m. to Midnight I-75 Express – Segment D Sheridan Street Interchange Lane Closures

13 Sound Barrier Walls Ground Mounted Sound Barrier Walls To be completed within the first year of construction (by summer 2015) Direct coordination with affected communities Hours of operation – Daytime work only – No weekend work I-75 Express – Segment D

14 Sound Barrier Wall Location Benefited communities Towngate Sheridan Glen The Crossbow Waverly Hundred Falcon’s Lea Waterford Hawkes Bluff Ivanhoe Estates Chelsea I-75 Express – Segment D

15 Adjacent Segments North of Segment D Segment E, from North of Griffin Road to I-595 – Construction began in March 2014 and is anticipated to be completed by Summer 2017. South of Segment D Segment C, from South of Miramar Parkway to South of Sheridan Street – Construction began in June 2014 and is anticipated to be completed by Summer 2018. I-75 Express – Segment D

16 What to Expect Lane closures, detours and increased travel times – Lane closures during non-peak hours – Signage will be placed to guide motorists – Public Information updates via electronic mail, postcards and project website Dust, vibration and noise – Frequent watering and sweeping – Frequent vibration monitoring Heavy equipment and construction crews in and around area I-75 Express – Segment D

17 Stay Informed Sign up for Construction Updates and Lane Closure Information: Project Public Information Officer Monica Diaz (954) 548-2754 monica@iscprgroup.com For more information on lane closures and other project details, log onto the FDOT Construction website at www.75-express.com I-75 Express – Segment D

18 We welcome your comments and questions. I-75 Express – Segment D