Download presentation
Presentation is loading. Please wait.
Published byClyde Perry Modified over 9 years ago
1
F.G. Garcia X37981 chopper Linac cable tray Cable penetration Overall View from the Linac Bridge Beam direction
2
F.G. Garcia X37982 Standing East side and looking South Cable penetration from Linac Lower level Linac cable tray ~36ft from ½ Q74 quad to bypass wall Chopper Bypass wall
3
F.G. Garcia X37983 penetration ~4in (?)
4
F.G. Garcia X37984 Future MTA cable tray/LCW header path ~36ft horizontal run from ½ Linac Q74 up to wall ~10ft vertical run ~ 15.5 ft horizontal run from East to West bypass walll
5
F.G. Garcia X37985 Future MTA cable tray/LCW header path ~ 15.5 ft horizontal run from East to West bypass walll
6
F.G. Garcia X37986 Path for future cable tray LCW water ~ 62 ft horizontal run from bifurcation wall to shielding wall
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.