Edward Downer Elementary School Playfield Renovation Status Update 06/10/14.

Similar presentations


Presentation on theme: "Edward Downer Elementary School Playfield Renovation Status Update 06/10/14."— Presentation transcript:

1 Edward Downer Elementary School Playfield Renovation Status Update 06/10/14

2 Construction Manager:Gabriel Fortich (SGI) Project Engineer:Shawn Fitzgibbons (SGI) Inspector of Record:Man Wah Cheng Architect of Record:Rod Sepulvida (BCA Architects) General Contractor: Maggiora & Ghilotti, Inc.

3 DEMOLITION OF EXISTING ASPHALT PAVING AND MISCELLANEOUS ITEMS TO BUILD A NEW GRASS FIELD INCLUDING ROUGH AND FINISH SITE GRADING, IRRIGATION, PLANTING, AND FIELD DRAINAGE. ELECTRICAL SCOPE CONSISTING OF POWER AND DATA CONNECTION TO NEW IRRIGATION CONTROLLER AND PROVISION OF CONDUIT AND FULL BOXES FOR FUTURE LOW VOLTAGE SYSTEMS.

4

5  Project Duration:180 (Calendar Days)  Notice To Proceed Date: May 19, 2014  Completion Date:Nov 15, 2014  Percent Complete: 18%  Base Contract Amount:$563,226.00

6 Site Demolition

7 Clear and Grubbing

8 Utility Trenching

9 Electrical and Signal Conduit

10 Sub-Grade Preparation