1 Case 10-3 Target Costing Nebraska Toaster Company
Aftab Usmani Alex Derevin Carla Daniels Shantanu Singh

2 Case Details Wants to introduce new product : A Toaster Oven
Want to match the price on basic toaster Market price : $20 Wants to earn profit of 20% on sales price Customer requirements are identified Toasts properly Size Speed of toasting Toaster capacity Appearance Easy to clean

3 Target Cost Target Cost =Sales Price - 0.2* Sales Price

4 Value Chain Analysis Toaster Oven
Life Cycle Target (In $) Current Gap R&D 4.00 4.20 0.20 Manufacturing 9.00 12.00 3.00 Selling 1.60 1.80 Shipping (outsourced) 0.90 1.00 0.10 General Admin 0.50 0.70 Total 16.00 19.70 3.70

5 Functional Cost Analysis
Component Current Cost (In $) % of Cost Heating Unit 2.40 20 Display Light 1.60 13 Level 0.60 5 Spring Coil Temperature Control Timer Body Design 5.10 43 Crumb & Grease Catcher 1.10 9 Total 12.00 100%

6 Requirement Analysis Customer Requirements Customer Ranking % of Score
Toasts & Grill Property 5 28 Size 3 17 Speed of toasting or grilling Toaster Oven Capacity 2 11 Appearance 1 Easy to Clean 4 22 Total 18 100

7 Functional Performance Analysis (Percentage)
Heating Unit Display Light Lever Spring Coil Temp. Control & Timer Body Design Grease Catcher Total Toasts Properly 50% 20% 10% 100% Size Speed of Toasting 70% Toaster Capacity 30% 5% 60% Appearance 80% Easy to Clean 45%

8 Functional Performance Analysis (Importance Index)
Heating Unit Display Light Lever Spring Coil Temp. Control & Timer Body Design Grease Catcher Toasts Properly 0.14 0.056 0.028 Size 0.085 Speed of Toasting 0.119 0.017 0.034 Toaster Capacity 0.033 0.0055 0.066 Appearance 0.01 0.04 Easy to Clean 0.11 0.099 0.011 Importance Index 0.487 0.01 0.0615 0.056 0.045 0.324 0.0165

9 Rank of Product Function

10 Target Cost Index Function Heating Unit Display Light Lever
Spring Coil Temp. Control & Timer Body Design Grease Catcher Importance Index (A) 0.487 0.01 0.0615 0.056 0.045 0.324 0.0165 % of Target Cost (B) 0.2 0.13 0.05 0.43 0.09 Target Cost Index (A/B) 2.435 0.077 1.23 1.12 0.9 0.75 0.18

11 Functional Performance Analysis (Requirement Score)
Heating Unit Display Light Lever Spring Coil Temp. Control & Timer Body Design Grease Catcher Total Score Toasts Properly 2.5 1 0.5 5 Size 1.5 3 Speed of Toasting 2.1 0.3 0.6 Toaster Capacity 0.1 1.2 2 Appearance 0.2 0.8 Easy to Clean 1.8 4 Total Score 8.7 0.2 1.1 1 0.8 5.9 0.3 18 Total $ 2.4 1.6 0.6 5.1 1.10 Score/$ 3.625 0.125 1.83 1.67 1.33 1.16 0.27

12 Rank of Product Function