Download presentation
Presentation is loading. Please wait.
Published byErnesto Leppard Modified over 9 years ago
1
PROMOTIVE ACTION OF WORKER’S HEALTH, HYGIENE, AND ENVIRONMENT IN PT. GUNUNG MADU PLANTATIONS INDONESIA Extension Seminar of JICOSH Ergonomic Course Presented by : dr. Evi Maiselma
2
PRESENTATION OUTLINE Company Overview Hazard Identification Hazard Handling Waste Management Waste Water Treatment Control & Monitoring Constraint & Commitment Summary
3
PT. GUNUNG MADU PLANTATIONS Cane Plantations & Sugar Factory Lampung, Indonesia www.gunungmadu.com
4
1975 : Established in Lampung Province Status: Foreign Investment Company Kuok Investment(Foreign Partner): 45.00 % PT Pipit Indah(Local Partner): 27.50 % PT Rejosari Bumi(Local Partner): 27.50 % 1978: Initial Production Main Product: Plantation White Sugar (Domestic Market) Co-Product: Molasses (Domestic & Foreign Market) COMPANY OUTLINES
5
PRODUCTION CHART
6
THE PLANT SITE Jakarta Tokyo 7,000 km from Tokyo 400 km from Jakarta 100 km from Provincial city
7
PLANTATIONS AREA 7 Area Divisions 35,000 Hectares Total Land 25,000 Hectares planted with cane
8
Year Staff & Manager EmployeeTotal Daily Workers 19851201,6401,76010,000 19871251,5981,72310,500 19891241,5191,6438,000 19911311,6271,7588,500 19931331,7231,8568,500 19951421,7451,8878,500 19971471,6541,8017,500 19991531,5531,7068,500 20001531,5261,6798,500 20011521,5491,7018,500 20021511,5421,6938,500 20031471,55317008,000 EMPLOYEES & WORKERS
9
EMPLOYEES & WORKERS COMPOSITION, 2003
10
FACILITIES RESIDENCE LOCATION TOTAL Site AIIIIIIIVVI Kindergarten111115 Elementary School111115 Junior School11 Mosque1111116 Church11114 Hospital11 Policlinic111115 Canteen11114 Mini market1111116 Club House111115 Foot Ball Field1211117 Tennis Court1121117 Volley Ball Court22422214 Badminton Court1611110 Basket Ball Court112 Swimming Pool11 SITE FACILITIES
11
MAIN ACTIVITIES Cultivation Crop Maintenance Harvesting Milling Processing Steam Generating Laboratory Workshop Research Health Service Waste Management Waste Water Treatment
12
PHYSICAL HAZARDS Dust Vibration Noise Sunburn CHEMICAL HAZARDS Herbicide & insecticide application Fertilizer application BIOLOGICAL HAZARDS Poisonous animal attack Parasite infection PSYCHO-SOCIAL HAZARDS Overwork Cultivation Crop Maintenance Harvesting Hazard Identification at Workplace Plantations Factory Workshop Research Laboratory Hospital Plantation
13
SUGAR PROCESSING FLOW CHART BAGASSE FILTER MUD MOLASSES SUGAR CURING MASSECUITE BOILING SYRUP EVAPORATION CLEAR JUICE CLARIFICATION MIXED JUICE MILLING CANE WATER SO2 GAS MILK LIME IMBIBITION WATER SO2 GAS
14
PHYSICAL HAZARDS Dust Ash Noise Vibration Heat CHEMICAL HAZARDS Chemical for equipment cleaning Chemical for processing Chemical for Boiler PSYCHO-SOCIAL HAZARDS Overwork Milling Clarification Evaporation Hazard Identification at Workplace Plantation Factory Workshop Research Laboratory Hospital Factory
15
Hazard Identification at Workplace Plantation Factory Workshop Research Laboratory Hospital Workshop PHYSICAL HAZARDS Dust Vibration Noise CHEMICAL HAZARDS Used Oil RADIATION HAZARDS Welding radiation PSYCHO-SOCIAL HAZARDS Overwork Repairing Fabricating Assembling
16
Tissue Culture Biological Control Breeding Hazard Identification at Workplace Plantation Factory Workshop Research Laboratory Hospital Research CHEMICAL HAZARDS Chemical for analysis BIOLOGICAL HAZARDS Infectious diseases
17
Lab Analysis Hazard Identification at Workplace Plantation Factory Workshop Research Laboratory Hospital Laboratory CHEMICAL HAZARDS Chemical for analysis
18
Medical Treatment Curing Room X-ray Unit Hazard Identification at Workplace Plantation Factory Workshop Research Laboratory Hospital BIOLOGICAL HAZARDS Communicable disease RADIATION HAZARDS Photo (X-ray) radiation
19
JICOSH Extension Seminar ! HAZARD HANDLING Modification and Improvement in the Process Protection Eliminating or Minimizing Hazard Source
20
JICOSH Extension Seminar WASTE MANAGEMENT Source Reduction Recycling & Reusing Utilization
21
JICOSH Extension Seminar Cane Bagasse Derivative Industry (Alcohol, MSG, Cattle Feed) Power Generator (Burnt ash is used for farm) Derivative Industry (Mushroom, Paper, Cattle Farm) Transported to farm as organic fertilizer Liquid Waste JuiceSugar Molasses Filter Mud WASTE MANAGEMENT Solid Waste WWT
22
Anaerobe Pond (60,900 m3) Buffering Pond (29,700 m3) Facultative 3 Pond (6,129 m3) Stabilizing Pond (8,100 m3) Aerobe 1 Pond (18,654 m3) Facultative 2 Pond (8,400 m3) Facultative 1 Pond (8,400 m3) Aerobe 2 Pond (34,428 m3) Monitor Pond (4,590 m3) WASTE WATER TREATMENT Splitter (Oil and Water) (660 m3) For irrigation to the river Fishing Test Total Volume = 244,150 m3 Facultative 4 Pond (6,129 m3) Facultative 5 Pond (6,129 m3)
23
JICOSH Extension Seminar WASTE WATER TREATMENT
24
JICOSH Extension Seminar CONTROL & MONITORING ENVIRONMENT Air Quality Measurement Water Quality at Resource Water Waste Quality after Treatment WORKER Pre-employment Medical Check-up Periodical Medical Check-up Pre-replacement Medical Check-up
25
JICOSH Extension Seminar HAZARD SUMMARY HAZARDS Ash Dust Noise Vibration Heat Herbicide and Insecticide Chemical Radiation Poisonous animals attack Waste EFFECT Worker’s Health Respiratory System Hearing System Nervous System Heat Stroke & Water Body losses Acute & Chronic Intoxication Skin & eyes Irritation GIT disturbance Poison effect of animal Radiation effects Environment Air Pollution Water Pollution Natural Balance Social Aspect HYGIENE In-house keeping ENVIRONMENT Waste Management Waste Water Treatment Reforesting, Green Belt Routine Monitoring HEALTH Emergency Help Curative Action Preventive Action Promotive Action
26
JICOSH Extension Seminar Month Debit (M 3 /day) pH BODCODTSS (ppm) April3,3718.83307041 May4,5498.63327635 June3,6068.53337520 July3,5148.16418540 August2,8168.46429050 September4,3068.31437042 Tolerable Value6 - 96010050 EFFLUENT ANALYSIS BY GOVERNMENT, 2003
27
JICOSH Extension Seminar EFFLUENT ANALYSIS BY GOVERNMENT, 2003
28
JICOSH Extension Seminar Parameter Ambient Emission Measured Tolerable Value MeasuredTolerable Value SO 2 50.11 ug/m 3 3656.32 mg/m 3 1000 NO X 26.82 ug/m 3 15069.53 mg/m 3 1000 CO875 ug/m 3 10.000254.23 mg/m 3 - CO 2 --5.13 %- O2O2 --11.48 %- H2SH2S< 0.001 ppm0.02-- NH 3 0.003 ppm2-- Total Particle--214.26 mg/m 3 350 Ash42.1 ug/m 3 230-- Noise Level48.6 dB70-- AIR QUALITY MEASUREMENT BY GOVERNMENT, 2003
29
JICOSH Extension Seminar ENVIRONMENT AWARD
30
JICOSH Extension Seminar OUR CONSTRAINTS Human Factor (negative attitude & bad habit) Indiscipline Carelessness Low awareness of the importance of OSH Need training and OSH campaign It is the nature of sugar industry to create hazards Noise, Heat, Vibration, Ash, etc Need more budget to provide safety infrastructures & protection equipment Daily workers turn-over is high, and they work only in harvesting season. Need OSH continual campaign
31
JICOSH Extension Seminar OUR COMMITMENT Healthy Worker, Healthy Company No Serious Hazard No Environmental Damage No Occupational Disease GMP Sugar is the cleanest sugar produced in the region
32
Thank You
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.