Presentation is loading. Please wait.

Presentation is loading. Please wait.

21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting.

Similar presentations


Presentation on theme: "21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting."— Presentation transcript:

1 21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting

2 Electronics 1 Electronics 2 Machine Shop 2Markus Friedl21 Sept 2009 Mission Statement Development & maintenance of high-tech electronics & precision mechanics for HEP experiments –Electronics: In-house circuit design, assembly, firmware development and testing –Mechanics: Precision machining of prototypes and small series Support for CMS-Trigger, CMS-Tracker, Belle, ILC and Outreach projects

3 Electronics 1 Electronics 2 Machine Shop 3Markus Friedl21 Sept 2009 List of Members Electronics 1 –Staff: 8 persons, 7.1 FTE –Head: A.Taurok –Members: B.Arnold, H.Bergauer, M.Eichberger, K.Kastner, B.Neuherz, M.Padrta, T.Schreiner Machine Shop –Staff: 2 persons, 2.0 FTE –Head: A.Taurok –Members: M.Oderits, R.Stark Electronics 2 –Staff: 7 persons, 4.85 FTE –Head: M.Friedl –Members: I.Gfall, C.Irmler, M.Pernicka, J.Pirker, S.Schmid, H.Steininger

4 Electronics 1 Electronics 2 Machine Shop 4Markus Friedl21 Sept 2009 Skills Schematics design, PCB layout Assembly FPGA programming & simulation Beam tests Testing Machining Software development

5 Electronics 1 Electronics 2 Machine Shop 5Markus Friedl21 Sept 2009 Equipment …and many others: Software for Schematics/PCB and FPGA programming Pattern generators, oscillators, scopes Plate cutting & bending machines, drills, saws, … Vapor phase soldering machine BGA soldering machine 8 GHz real time oscilloscope CNC milling machine

6 Electronics 1 Electronics 2 Machine Shop 6Markus Friedl21 Sept 2009 Completed Projects DELPHI –FCA & VFT subdetectors –LTD electronics boards NA48 –Clock distribution –Calorimeter trigger –960 MHz-ADC system Outreach –LHC2008 exhibition CMS –Drift Tube Trigger –Global Muon Trigger –Global Trigger –Central Trigger Control –Analog Optohybrid –Pixel-FED Belle –FADCs for Silicon Tracker (SVD2)

7 Electronics 1 Electronics 2 Machine Shop 7Markus Friedl21 Sept 2009 Present Activities CMS –Trigger & Pixel: fine-tuning, adaptations, maintenance –R&D for CMS upgrade Belle II –Silicon Tracker for Belle II: R&D for Detector Module, Repeater, Data Acquisition, Control ILC Experiment –Mixed SiLC/CMS upgrade/Belle II beam test Outreach –Animated LHC wall poster

8 Electronics 1 Electronics 2 Machine Shop 8Markus Friedl21 Sept 2009 Present Activities – CMS Trigger Global Trigger upgrade Trigger definition using MATLAB Simulink Xilinx SystemGenerator makes VHDL code DSP inside CONDITION CHIP ALGO + FinOR (FDL) 12 4 2 8 FPGA CTRL FPGA 4 4 CTRL FPGA 4 4 3.2 Gbps Optical Links Mentor/ISE software implements chip design PSB_opt (Pipelined Synchronising Buffer) 3.2Gb/s optical links instead of cable Central Trigger Control Advanced version

9 Electronics 1 Electronics 2 Machine Shop 9Markus Friedl21 Sept 2009 Present Activities – CMS Tracker Pixel-FED upgrade Digital optical link instead of analog Partly re-using existing components Firmware development for heavy ion mode

10 Electronics 1 Electronics 2 Machine Shop 10Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami Chip-on-Sensor Concept Thinned readout chips (APV25) on sensor Strips of bottom side are connected by flex fanouts wrapped around the edge All readout chips are aligned  single cooling pipe Shortest possible connections  high signal-to-noise ratio side view ~60cm Ladder configuration top view

11 Electronics 1 Electronics 2 Machine Shop 11Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Full readout chain to DAQ To be designed and built by HEPHY Prototypes exist for all stages Origami module Repeater box FADC+PROC VME Data processing and hit time finding (~3ns RMS) in FPGA firmware

12 Electronics 1 Electronics 2 Machine Shop 12Markus Friedl21 Sept 2009 Present Activities – Outreach Animated LHC model + light queue = animated LHC wall poster Will be ready for the “Lange Nacht der Forschung” (Long night of research) outreach event, 7 November 2009 + =

13 Electronics 1 Electronics 2 Machine Shop 13Markus Friedl21 Sept 2009 Timeline of Papers, Talks and Posters

14 Electronics 1 Electronics 2 Machine Shop 14Markus Friedl21 Sept 2009 Future Plans Belle II –Production of full silicon tracker (together with semiconductor group) and its complete readout chain CMS –Trigger: Development of Global Trigger for CMS upgrade –Tracker: Upgrade of Pixel-FED, stacked modules for L1 track trigger Outreach –New, improved spark chamber for our exhibitions Generic (motivated by Belle II and CMS) –Fast serial links –FPGA design & simulation, embedded programming

15 Electronics 1 Electronics 2 Machine Shop 15Markus Friedl21 Sept 2009 Some Objects Made by Us CMS – Analog Optohybrid CMS – Pixel-FED Belle II – Origami Module Outreach – Spark Chamber CMS – Global Trigger Belle II – Repeater

16 Electronics 1 Electronics 2 Machine Shop 16Markus Friedl21 Sept 2009 Backup Slides

17 Electronics 1 Electronics 2 Machine Shop 17Markus Friedl21 Sept 2009 Completed Projects – LHC2008 Exhibition LED- animated 3D-LHC model GRID globe (live data) CMS Optohybrid mobile Light queue (data transfer from CMS to GRID)

18 Electronics 1 Electronics 2 Machine Shop 18Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami chip-on-sensor module


Download ppt "21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting."

Similar presentations


Ads by Google