Download presentation
Presentation is loading. Please wait.
Published byFrank Nelson Modified over 9 years ago
1
21 Sept 2009 Markus Friedl Electronics 1 Electronics 2 Machine Shop HEPHY Scientific Advisory Board Meeting
2
Electronics 1 Electronics 2 Machine Shop 2Markus Friedl21 Sept 2009 Mission Statement Development & maintenance of high-tech electronics & precision mechanics for HEP experiments –Electronics: In-house circuit design, assembly, firmware development and testing –Mechanics: Precision machining of prototypes and small series Support for CMS-Trigger, CMS-Tracker, Belle, ILC and Outreach projects
3
Electronics 1 Electronics 2 Machine Shop 3Markus Friedl21 Sept 2009 List of Members Electronics 1 –Staff: 8 persons, 7.1 FTE –Head: A.Taurok –Members: B.Arnold, H.Bergauer, M.Eichberger, K.Kastner, B.Neuherz, M.Padrta, T.Schreiner Machine Shop –Staff: 2 persons, 2.0 FTE –Head: A.Taurok –Members: M.Oderits, R.Stark Electronics 2 –Staff: 7 persons, 4.85 FTE –Head: M.Friedl –Members: I.Gfall, C.Irmler, M.Pernicka, J.Pirker, S.Schmid, H.Steininger
4
Electronics 1 Electronics 2 Machine Shop 4Markus Friedl21 Sept 2009 Skills Schematics design, PCB layout Assembly FPGA programming & simulation Beam tests Testing Machining Software development
5
Electronics 1 Electronics 2 Machine Shop 5Markus Friedl21 Sept 2009 Equipment …and many others: Software for Schematics/PCB and FPGA programming Pattern generators, oscillators, scopes Plate cutting & bending machines, drills, saws, … Vapor phase soldering machine BGA soldering machine 8 GHz real time oscilloscope CNC milling machine
6
Electronics 1 Electronics 2 Machine Shop 6Markus Friedl21 Sept 2009 Completed Projects DELPHI –FCA & VFT subdetectors –LTD electronics boards NA48 –Clock distribution –Calorimeter trigger –960 MHz-ADC system Outreach –LHC2008 exhibition CMS –Drift Tube Trigger –Global Muon Trigger –Global Trigger –Central Trigger Control –Analog Optohybrid –Pixel-FED Belle –FADCs for Silicon Tracker (SVD2)
7
Electronics 1 Electronics 2 Machine Shop 7Markus Friedl21 Sept 2009 Present Activities CMS –Trigger & Pixel: fine-tuning, adaptations, maintenance –R&D for CMS upgrade Belle II –Silicon Tracker for Belle II: R&D for Detector Module, Repeater, Data Acquisition, Control ILC Experiment –Mixed SiLC/CMS upgrade/Belle II beam test Outreach –Animated LHC wall poster
8
Electronics 1 Electronics 2 Machine Shop 8Markus Friedl21 Sept 2009 Present Activities – CMS Trigger Global Trigger upgrade Trigger definition using MATLAB Simulink Xilinx SystemGenerator makes VHDL code DSP inside CONDITION CHIP ALGO + FinOR (FDL) 12 4 2 8 FPGA CTRL FPGA 4 4 CTRL FPGA 4 4 3.2 Gbps Optical Links Mentor/ISE software implements chip design PSB_opt (Pipelined Synchronising Buffer) 3.2Gb/s optical links instead of cable Central Trigger Control Advanced version
9
Electronics 1 Electronics 2 Machine Shop 9Markus Friedl21 Sept 2009 Present Activities – CMS Tracker Pixel-FED upgrade Digital optical link instead of analog Partly re-using existing components Firmware development for heavy ion mode
10
Electronics 1 Electronics 2 Machine Shop 10Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami Chip-on-Sensor Concept Thinned readout chips (APV25) on sensor Strips of bottom side are connected by flex fanouts wrapped around the edge All readout chips are aligned single cooling pipe Shortest possible connections high signal-to-noise ratio side view ~60cm Ladder configuration top view
11
Electronics 1 Electronics 2 Machine Shop 11Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Full readout chain to DAQ To be designed and built by HEPHY Prototypes exist for all stages Origami module Repeater box FADC+PROC VME Data processing and hit time finding (~3ns RMS) in FPGA firmware
12
Electronics 1 Electronics 2 Machine Shop 12Markus Friedl21 Sept 2009 Present Activities – Outreach Animated LHC model + light queue = animated LHC wall poster Will be ready for the “Lange Nacht der Forschung” (Long night of research) outreach event, 7 November 2009 + =
13
Electronics 1 Electronics 2 Machine Shop 13Markus Friedl21 Sept 2009 Timeline of Papers, Talks and Posters
14
Electronics 1 Electronics 2 Machine Shop 14Markus Friedl21 Sept 2009 Future Plans Belle II –Production of full silicon tracker (together with semiconductor group) and its complete readout chain CMS –Trigger: Development of Global Trigger for CMS upgrade –Tracker: Upgrade of Pixel-FED, stacked modules for L1 track trigger Outreach –New, improved spark chamber for our exhibitions Generic (motivated by Belle II and CMS) –Fast serial links –FPGA design & simulation, embedded programming
15
Electronics 1 Electronics 2 Machine Shop 15Markus Friedl21 Sept 2009 Some Objects Made by Us CMS – Analog Optohybrid CMS – Pixel-FED Belle II – Origami Module Outreach – Spark Chamber CMS – Global Trigger Belle II – Repeater
16
Electronics 1 Electronics 2 Machine Shop 16Markus Friedl21 Sept 2009 Backup Slides
17
Electronics 1 Electronics 2 Machine Shop 17Markus Friedl21 Sept 2009 Completed Projects – LHC2008 Exhibition LED- animated 3D-LHC model GRID globe (live data) CMS Optohybrid mobile Light queue (data transfer from CMS to GRID)
18
Electronics 1 Electronics 2 Machine Shop 18Markus Friedl21 Sept 2009 Present Activities – Belle II R&D Origami chip-on-sensor module
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.