Presentation is loading. Please wait.

Presentation is loading. Please wait.

FIRST TERM SCHEME OF WORK.

Similar presentations


Presentation on theme: "FIRST TERM SCHEME OF WORK."— Presentation transcript:

1 FIRST TERM SCHEME OF WORK.
WEEKS TOPICS 1. Drawing of engineering components. 2. Assembly drawing of engineering components. 3. Assembly of simple mechanical components including bolts and nuts. 4. Sectioning of machine components. 5. Sectional views of machine components. 6. Freehand sketching of mechanical tools, electrical / woodwork tools components. 7. Drawing of electrical and building conventional symbols. 8. Application of scale drawing e.g. reduced scale. 9. Revision 10. Examination.

2 Drawing of engineering components.
Drawing of engineering components makes the students to be familiar with the various engineering components in use. These engineering components are designed for the purpose of coupling a complete engineering mechanism. TYPES OF ENGINEERING COMPONENTS: fuller, (ii) spanner (iii) hammer, (iv) oil can (v) try square, (vi) hardie, (vii) Plier etc.

3 Engineering components
Straight pein hammer Ball pein hammer Claw hammer

4

5 List 6 engineering components and state their uses.
CLASS WORK List 6 engineering components and state their uses. Draw 4 of the components listed in question number one.


Download ppt "FIRST TERM SCHEME OF WORK."

Similar presentations


Ads by Google