GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large.

Similar presentations


Presentation on theme: "GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large."— Presentation transcript:

1 GLAST Large Area Telescope Instrument Flight Software F2F Meeting March 17, 2005 Jeff Fisher FSW Manager Stanford Linear Accelerator Center Gamma-ray Large Area Space Telescope

2 FSW Key Issues Completing ITC Software Package(s) –Significant progress made –Expected code completion is 3/25 Mode Control –Assigned to NRL for development Getting to Candidate Release –Completion of ITC packages is gating item –Getting prepared for bug tracking through JIRA FSW Test –Relaying out approach and schedule to utilize VSC –Filter Testing Develop procedures and scripts that will be useful during ops phase for filter updates and validation Discussing approach with Steve Ritz

3 Development Status/Schedule Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities Processor Basic Services (PBS, VXW) Complete100% coded0CompleteNone Primary Boot10/30/04100% coded0CompleteTesting Multiple Boot Image, Checksum 1/21/05100% coded0CompleteN/A Secondary Boot10/30/04100% coded0CompleteNone LAT Communications Board Driver (LCBD) 12/15/04100% coded0CompleteNone LCB Service (LCS)3/14/0590% coded13/25/05Coding in progress Command and Telemetry/1553 Service (CTS) 3/21/0590% coded13/25/05Coding in progress Abstract/Inter-task Communications (ITC) 3/14/0590% coded13/25/05Coding in progress Instrument Configuration (LATC) 12/01/04100% coded0CompleteNone Command and Telemetry Data Dictionary (LCAT) 1/10/05LCAT tool complete0CompleteNone

4 Development Status/Schedule (2) Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities File and Memory Mgmt (LFS, File/Object) 11/30/04100% coded1CompleteUnit testing underway Housekeeping (LHK)3/22/0595% coded13/31/05Needs minor update after ITC complete Thermal Control (LTC)3/22/0595% coded13/31/05Complete except for T&C interface Spacecraft Interfaces (LSM)3/15/0595% coded23/31/05Needs minor update after ITC complete Watchdog (LSW)4/15/0570% coded34/15/05Coding begins after ITC Mode Control (LIM)4/30/05NRL getting up to speed 64/30/05Assigned to NRL, Underway Power/Initialize GASU (PIG, part of Basic Services layer) 11/15/04100% coded0CompleteBug fixes.

5 Development Status/Schedule (3) Function Planned Code/Unit Testing Complete Status Remaining Effort (person weeks) Forecast Code/Unit Testing Complete Continuing Activities Charge Injection Calibration (LCI) 4/18/0550% coded44/18/05Good progress made this month Diagnostics (LDF)5/15/054 Related to calibration; will continue after calibration completed Event Integrity and Delivery (part of LPA) 3/22/0590% coded13/22/05Good progress made; code nearing production status Event Filtering (part of LPA)3/22/0590% coded13/22/05Good progress made; code nearing production status GRB Detection and Response (part of LPA) 5/15/0560% coded25/15/05Deferred until completion of filter & diagnostics