Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGy March Closing Report

Similar presentations


Presentation on theme: "TGy March Closing Report"— Presentation transcript:

1 TGy March Closing Report
doc.: IEEE /0387r0 March 2008 TGy March Closing Report Date: Authors: Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

2 March 2008 doc.: IEEE /0387r0 March 2008 Abstract This submission summarizes the TGy activity for IEEE Orlando (March 2008) meeting Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

3 March 2008 doc.: IEEE /0387r0 March 2008 TGy Report 08/318r2 March Report, 08/0359r0 March Plenary Meeting minutes, 08/0319r2 March Sponsor Ballot Conditional Report TGy started after March 2006 plenary, received 39 submissions, created 72 body pages of draft text 1190 participant hours, resolved 1633 comments There were 12 comments with processing errors – thanks for commenter’s forbearance while we corrected our mistakes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

4 March 2008 doc.: IEEE /0387r0 March 2008 Motions (3) Motion: To approve document 08/0319r2 as the report to the 802 Executive Committee (EC) on the requirements for conditional approval to forward y to RevCom. Moved: Rich K Second: Jim R Vote: Motion: Passes Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

5 March 2008 doc.: IEEE /0387r0 March 2008 Motions (4) Move to request conditional approval to send the draft of y to RevCom upon the conclusion of a Sponsor Recirculation Ballot that meets all requirements for recirculation ballots. Moved: Jim R Second: Rich K Vote: Motion: Passes P802.11y Draft 8.0 had a 94.9% approval on the last Sponsor Recirculation Ballot. There were 5 voters that had voted Disapprove. 1 of the 5 NO voters changed to an Approve vote. Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems

6 Attendance March 2008 Tuesday AM1: Peter Ecclesine, Cisco Systems
doc.: IEEE /0387r0 March 2008 Attendance Tuesday AM1: Peter Ecclesine, Cisco Systems Rich Kennedy, ETS-Lindgren Eldad Perahia, Intel Corp Jim Petranovich, Viasat Douglas Chan, Cisco Systems Dan Lubar, Relay Services Dick Roy, Connexis Jim Raab, Dell Computer Jeremy Landt, Transcore Alaistair Malarky, Mark IV Industries Wayne Fisher, ARINC Brian Hart, Cisco Systems Tushar Moorti, Broadcom Randy Roebuck, SIRIT/OmniAir Peter Ecclesine, Cisco Systems Peter Ecclesine, Cisco Systems


Download ppt "TGy March Closing Report"

Similar presentations


Ads by Google