SCPM Survival Guide for PCD Suppliers
How to view your forecast and return a commit
2
https://offerings.e2open.com/web/e2open/portal
Browser URL for SCPM January 2005
3
Signing in to SCPM January 2005
4
Verify Your e-mail Address in SCPM
January 2005
5
If Incorrect or Missing . . .
Click “Edit” to add or change info January 2005
6
Change e-mail & other info in Edit Profile screen
Click on “Done” button to save your changes January 2005
7
Five Things to Know in SCPM
Downloading your Forecasts (and Order book) Using the Excel macro to review your data and make a Commit Uploading your Commit file Making a new Commit in the GUI (Graphical User Interface) Getting help January 2005
8
Downloading Your Forecast
9
Setting Up Your File Download
1 4 2 3 5 Select or type in a Start Date and End Date (optional) Make “File Format” equal “IBM Spreadsheet” and wait until screen refreshes (10 sec) Make “Timeline Patterns” equal “Hybrid view: 6 weeks of daily buckets and 46 weeks (Sunday)” – no other choice will show any PCD data in download In “Data Measure Selection Box” choose a data measure, or choose more than one by holding down on your PC’s “Control” key while clicking on each one you want Click the “Next” button to go to the next screen January 2005
10
Using the Download Filter
Click “Add All” seven times, waiting until the yellow highlight moves down to the next line January 2005
11
Save Your Filter to Use Next Time
2 - Enter a name for your filter and click “Save” 3 – Click “Next” to start download 1- Click “Save” to save your filter (next time you can “Apply” this filter instead of going through seven steps) January 2005
12
Download is assigned a number – note it
January 2005
13
Use menu on left to go to “Alerts – Inbox”
In “Message Category” drop-down box, choose “Upload/Download” January 2005
14
Download message is in “Alerts – Inbox”
Clicking on this message will show you how many records are in download January 2005
15
Download file is also in “Alerts – Inbox”
Click on this link to download your file Congratulations! You’ve saved your Forecast Download file. January 2005
16
Using the Excel macro to review your data and make a Commit
17
Download the SCPM Macro Tool
Use menu at left to select “Macro Tool” and click “Save” on “File Download” popup screen. You will have to unzip the file to use it. January 2005
18
SCPM Macro is an Excel-based Program
Click here to open your saved Download file January 2005
19
Each PN/Site/Supplier/Subgeo has its own lines
January 2005
20
Buttons at top create and save Commit upload file
These buttons let you copy “Proposal” (your forecast from last week), “Forecast” or “Order Book” (OEM suppliers only receive this) directly to the “Commitment” line This button lets you save your “commitment” as a file which can be uploaded into SCPM (WARNING: Each upload file must be for one PCD Manufacturing Line only) These buttons let you choose what two quantities that Excel compares in the “Delta” and “Cum Delta” lines. The check box indicates whether you want RSC Stock included as a commit in the current week (yes if checked) January 2005
21
Uploading your Commit file
22
Uploading file is easy Choose “Upload File(s)” from “Upload/Download” menu Click on “Point_in_Time” radar button Click on “Browse” button to search for saved Commit file on your PC Click on “Upload” button to complete upload January 2005
23
Upload is assigned a number – note it
NOTE: Error file number does not mean there were any errors in your upload. January 2005
24
Use menu on left to go to “Alerts – Inbox”
In “Message Category” drop-down box, choose “Upload/Download” January 2005
25
Upload status in three links in “Alerts – Inbox”
January 2005
26
Making a new Commit in the GUI (Graphical User Interface)
27
Use Search screen to find all or some parts
If you do not enter any search terms, you will get a listing of all of your parts (you can use “*” as a wildcard in your search) January 2005
28
Select all or some parts to view
Click top box to select all parts on page, or click individual parts Last Step is to click “View” Click this to select all parts on all pages January 2005
29
This icon leads to “View/Update by Subgeo”
Or use one of these to copy FC or Proposal to Commit line January 2005
30
Pop-up screen for making commits
Choose subgeo (if any) from dropdown box Always finish by clicking “Update” January 2005
31
Getting Help
32
On any page, clicking “Help” will bring up this screen
January 2005
33
Customer Support Location Hours of Coverage Telephone number / Contact
Address Bangalore, India 8AM-6PM (Monday to Friday) Shanghai, China 6PM-6AM (Sunday- Friday) (11) Cindy Zhang Budapest, Hungary 6AM-8AM (Monday- Friday) (011) Antonio Spata Note: Global call-in numbers being implemented January 2005
34
On April 1st, PCD becomes Lenovo
You may currently be receiving forecasts for both PCD and x-Series parts. There is no way to tell them apart, and some are common. Both will continue to send forecasts to you through SCPM. x-Series will stay a part of IBM. Before April 1st you will be issued a second SCPM user ID, so that you will have one for IBM x-Series and one for Lenovo. Please log in with each user ID and see if you have forecasts in one or both of them. January 2005
35
SCPM Plants 2/14/2004 4/1/2004 SCPM SCPM 1 Instance 1 Instance SNG2
IND2 SNG6 IND6 SNG IND RTP2 GNK2 RTP6 GNK6 RTP GNK ON2 FUJI2 ON6 FUJI6 ON FUJI OFF2 GDL2 OFF6 GDL6 OFF GDL IBM Sites Lenovo Sites
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.