Presentation is loading. Please wait.

Presentation is loading. Please wait.

Set Up to Begin Evacuation

Similar presentations


Presentation on theme: "Set Up to Begin Evacuation"— Presentation transcript:

1 Set Up to Begin Evacuation
Bag Not Cinched Up to Prevent Liner From Being Sucked Into Bottom Valve

2 Notice That the Tie Off of the Bag Opening is in the Center
Top View of Bag Tie Off Front of Tote Notice That the Tie Off of the Bag Opening is in the Center

3 Migration of Tie Off Front of Tote Tie Off Notice That the Tie Off Starts Migrating Towards the Front of the Tote as the Front Side of the Liner is Being Sucked Down Towards the Valve Opening

4 Continued Migration of Tie Off
Front of Tote Tie Off Moving Closer to the Front off the Tote. The Liner Between the Tie Off and the Valve Being Sucked Down to the Valve.

5 Bag Now Sucked Into Valve
Tie Off Front of Tote Flow Has Now Stopped Due to Bag Being Sucked Into Valve. See How the Unrestricted Migration of the Tie Off Shows the Bag Movement Towards the Valve.

6 Cinching up the Bag With Come-A-Long
Simple and Inexpensive Solution. 2 x 4 Boards Clamped to the Sides of the Tote Suspend the Come-A-Long and Bag

7 Bag Properly Cinched Up
Valve Hose Front of Bag is Kept From Being Sucked Into the Bottom Valve

8 Tote Tilted for Better Evacuation
A Wheel Chock Placed Under the Rear of the Tote Tilts Contents Towards Front Valve

9 Tote Tilted for Better Evacuation

10 Better Evacuation The Backside of the Bag and Contents are Flowing Towards the Front Valve


Download ppt "Set Up to Begin Evacuation"

Similar presentations


Ads by Google