Download presentation
Presentation is loading. Please wait.
Published bySônia Brezinski Canário Modified over 6 years ago
1
Regional Pedestrian and Cycling Masterplan (PCMP)
Completed: March 2011
2
Regional Transportation Plan
CONTEXT: Building on Travel Choices Directive to establish a regional approach to walking and cycling came from Travel Choices Strategy (2002) This is a sub-strategy of the Regional Growth Strategy (RGS) RGS Sub-strategy: Travel Choices Regional Transportation Plan TDM Strategy PCMP Corridor Study Ph I Rapid Transit Project Transit Future
3
Phased Approach to PCMP
Understand the Context Jurisdictional complexities Definition of “regional” and “regionally significant” in the context of active transportation Consultation Technical Advisory Committee (municipalities) Citizen’s Advisory Committee (community) Advocates’ Sessions Draft the Masterplan
4
Practical Purpose of a Masterplan
What we learned regarding establishing a regional approach to active transportation Efficiencies gained through coordination Consistency is most important
5
Masterplan Vision 4 Types of Cyclists
“The Capital Region will be a truly livable and environmentally sustainable community, where walking and cycling are key components of an innovative and integrated transportation system. Citizens of all ages in all parts of the region will find active travel irresistible on a seamless network of Class I on- and off-street facilities appropriate for user of all abilities. In 2038, the CRD will be lauded for its 15% regional and 25% high density area mode share for cycling and 15% mode share for pedestrian travel.”
6
Mode Shares No Change in Mode Share Over the Last Ten Years
7
Project Overview 5 “Es” Engineering Encouragement Education Evaluation
Enforcement
8
Engineering Primary Inter-Community (PIC) Bikeway Network
Goal is to upgrade the network to Class I or “Low Stress” bikeways
9
Metrics 775 km bikeway network 192 km meet Class 1 standard
583 km need improvement Existing Proposed Total Multi-use, off street trail 110 18 128 Separated on-street cycle track 329 Bike lane / shoulder way 68 191 259 Shared 14 45 59 192 583 775
10
Relationship Between Network Development, Programs and Mode Split
11
Engineering – On-Street Bikeway Typology
Recommended Facility Separation Big idea
12
Level of Separation Based on speed and volume
Credit: GVCC and Pedal Forward
13
Engineering – On-Street Bikeway Typology
14
Engineering – On-Street Bikeway Typology RURAL
15
Engineering – On-Street Bikeway Typology
16
Engineering – On-Street Bikeway Typology
17
Colwood: Existing Facilities
2 1
18
Colwood: Proposed Facilities
2 3 1
19
Example: Sooke Road Strong / fearless Enthused and confident
Interested but concerned
20
Engineering – Pedestrian Standards
Universal design Consistent facilities installed throughout the region Focus on high pedestrian traffic areas: transportation hubs, commercial centres, civic destinations Pedestrian and Cycling Design Guidelines Wayfinding Transit accessibility Parking standards
21
Education and Encouragement
Active Safe Routes to School ASRTS Road Skills Courses Special Events / Promotion Rights and Responsibilities Education Detour management for construction zones
22
Evaluation and Enforcement
Inter-municipal Oversight Cttee (PCMP) Bicycle and Pedestrian Account Police Liaison
23
Regional Transportation Plan
Next Step: “E”mplementation Short Term Medium – Long Term Distill big, long-term, ambitious plan down to short-term actions RSP – Gas Tax Proposal Oversight Cttee Soft E’s Innovation Pilots Amenities Regional Transportation Plan Recommendations for moving forward
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.