Presentation is loading. Please wait.

Presentation is loading. Please wait.

TGm E-MBS Rappatour Group Report

Similar presentations


Presentation on theme: "TGm E-MBS Rappatour Group Report"— Presentation transcript:

1 TGm E-MBS Rappatour Group Report
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16m-1233 Date Submitted: Source: Ken Stanwood NextWave Richard Li ITRI Jerry Chow ZTE Venue: IEEE Interim, Session #57, Kobe, Japan Base Contribution: N/A Purpose: For discussion by IEEE TGm Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 E-MBS RG Activities this Week
38 E-MBS contributions highlighted by TGm spreadsheet RG chairs selected 14 representative contributions for presentation Focus was on variety of topics, not on validity of proposal Due to lack of time 9 contributions were presented, for information only, without discussion 2

3 E-MBS RG Activities this Week
TGm C: 09:00 – 10:00 AM, Sept.18, 2008 General: Time allocation: 10min/contribution 1056r2; Proposal for m E-MBS; CABC, Timi, Intel 1047; Physical Layer Aspects of E-MBS in IEEE m; Samsung 1134; Discussion on Technologies for E-MBS; Alcatel SB 918: Multicast/Broadcast Services in m; NextWave, LGE MAC: Time allocation: 3min/contribution 1011r1; Service Continuity of Enhanced-MBS; ITRI 904r1; Location update for MBS in Idle State; III, NCU, TKU, NIU 975; E-MBS feedback channel for adaptive E-MBS; LGE 1097r2; Dynamic RRM Support for Enhanced Multicast Broadcast Services; NTUST PHY: 959r1; Multiplexing of MBS and unicast services in 16m; ZTE 1002r1; Proposed E-MBS Channel Structure for m, Toshiba MIMO: 969r1; A novel UEP scheme for MBS using D-STTD; Huawei, HKU 1003; m E-MBS and MIMO Transmissio; ALU 1136; MIMO E-MBS with Precoding, Alcatel SB 1173; Considerations on the E-MBS in m : Physical Structure and MIMO Support; LGE 3

4 Plan going forward Recommend reject all E-MBS SDD comments
All contributions will be considered in development of harmonized E-MBS text Authors of material on individual topics will be requested to develop harmonize text or provide text listing alternatives where harmonization is not possible. Identification of use case for ideas will be stressed 4


Download ppt "TGm E-MBS Rappatour Group Report"

Similar presentations


Ads by Google