Presentation is loading. Please wait.

Presentation is loading. Please wait.

1 E-MBS DG Opening Report Document Number: IEEE C80216m-09/2121 Date Submitted: 2009-08-31 Source: Kaushik Josiam, Yan-Xiu Zheng

Similar presentations


Presentation on theme: "1 E-MBS DG Opening Report Document Number: IEEE C80216m-09/2121 Date Submitted: 2009-08-31 Source: Kaushik Josiam, Yan-Xiu Zheng"— Presentation transcript:

1 1 E-MBS DG Opening Report Document Number: IEEE C80216m-09/2121 Date Submitted: 2009-08-31 Source: Kaushik Josiam, Yan-Xiu Zheng Email: kjosiam@sta.samsung.com, zhengyanxiu@itri.org.twkjosiam@sta.samsung.comzhengyanxiu@itri.org.tw Samsung Electronics, ITRI Venue: IEEE Session #63, Jeju, Korea. Re: IEEE P802.16m/D1: Feature DG: E-MBS Purpose: To discussion in the DG session. Notice: This document does not represent the agreed views of the IEEE 802.16 Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE 802.16. Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: and.http://standards.ieee.org/guides/bylaws/sect6-7.html#6http://standards.ieee.org/guides/opman/sect6.html#6.3 Further information is located at and.http://standards.ieee.org/board/pat/pat-material.htmlhttp://standards.ieee.org/board/pat

2 E-MBS DG Opening Report Kaushik Josiam, Yan-Xiu Zheng Samsung Electronics, ITRI

3 Contributions 36 contributions submitted so far Categorized – General contributions – Specific advanced feature contributions OBJECTIVE of the E-MBS DG: to develop text on support for E-MBS that has the broadest consensus

4 Areas – E-MBS MAC E-MBS Basic Operation (Priority # 1) 1817 (ETRI), 2101 (INTEL), 1992 (LGE), 1935 (Nokia),1946 (Samsung), 1779 – 1780 (ZTE), – E-MBS Mobility Management 1764 ( ITRI), 1768 – 1769 (III), 1816 (ETRI), E-MBS advanced operation – E-MBS feedback channel : 1957 – 1958 (NTUST), 1877 (Mediatek), 1807-1808 (ETRI), 1683-1684 (NTU) – Retransmissions: 2111 (NEC), 1776 (ITRI), 1682 (NTU) – E-MBS multicarrier : 1933 (Nokia), 1717 (ZTE) – Dynamic Multicast: 2014 (LGE),

5 Areas – E-MBS PHY E-MBS Control & MAP 1992 (LGE), 2112 (Intel), 1818 (ETRI), 1775 (ITRI), 1877 (Mediatek), 2020 (Samsung) Multiplexing of Unicast with E-MBS 2049 (LGE), 1778 (ZTE), 1946 (Samsung) E-MBS MIMO 1896 (NTU/Mediatek), 1876(Mediatek), 1762 (ITRI), 1946 (Samsung) E-MBS Zone specific pilots 1688 (ITRI), 1733 (Panasonic), 1800 (ZTE), 1951 (Samsung)

6 Proposed Plan Amendment Text Drafting – Develop text with the broadest consensus Basic Operation for E-MBS E-MBS Control and MAP E-MBS MIMO E-MBS Zone specific pilots – Can be parallel activity – By Hawaii meeting, invite comments and text for E-MBS advanced operation E-MBS multiplexing Remaining issues

7 Modes of communication Conference calls – To develop the text with broadest consensus Basic Operation for E-MBS E-MBS Zone Specific Pilots needs lot of cross-comparison and harmonization – Establish a leader for harmonization (Volunteer?) – If time permits, we can use the time to discuss specific advanced features for E-MBS Members encouraged to harmonize offline Emails – For members to provide comments – Drive consensus using the forum for discussions

8 Timeline through Session 63.5 Aug 31/Sep 2, 2009 Sep 8, 2009 Sep 11, 2009 Sep 14, 2009 Sep 17, 2009 Sep 18, 2009 f2f – contribution presentation and scope definition Initial draft shared Comments on first draft due Conference call #1 Comments on second draft due Conference call #2 Comments on third draft due Conference call #3 Call for text on Advanced features Comments on fourth draft due (including the new text on advanced features) Conference call #4 (to resolve comments on the basic operation only) Conference call #5, if necessary

9 DG Plan Out of Jeju Meeting – Agree on Scope for DG – Release initial ToC – Share initial “starting” text proposal After Jeju & Before Hawaii – Finish Basic E-MBS operation text – Harmonization on E-MBS Pilot pattern – Down-selection of options (Straw-polls) In Hawaii – Comment resolution on E-MBS Pilot Pattern, MBS MAP, MBS MIMO and advanced features – Down-selection of options (Straw-polls) – Recommendation to TGm to adopt the consensus text Straw-poll Policy: > 75% support required for consensus text


Download ppt "1 E-MBS DG Opening Report Document Number: IEEE C80216m-09/2121 Date Submitted: 2009-08-31 Source: Kaushik Josiam, Yan-Xiu Zheng"

Similar presentations


Ads by Google