1 802.16 Project Planning Committee (PPC): Next revision project
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE C802.16ppc-10/0068 Date Submitted: Source: Vladimir Yanover Wonil Roh Venue: Dallas, Texas, USA Base Contribution: None Purpose: Project Planning Committee Session #70 Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 Background: WiMAX Forum TWG timeline for Release 2
“Spec ready” means completion of compliance & test specifications Updated the OR timelines : OR 1b as Q4 ’10; “completion of definition of OR 1c” as Q2 ‘11 R2 profile timeline is official (approved by TSC)

3 Problem statement Completion of WiMAX Forum Release 2.0 System Profile is scheduled to Dec 2010 From Jan 2011 development of complementary documentation will start including test specifications From 16e experience, development of the documentation generates many questions on interpretation of the standard Certain problems can be discovered WiMAX TWG maintains communication with WG to deliver requests for interpretation and problem reports Normally addressed by Maintenance TG

4 Proposed solution In view of that, seems reasonable to have in WG a dedicated project to address this type of problems discovered by individual members and by WiMAX Forum The most appropriate format of this project would be a short time revision project in Q2-Q4 of 2011 The revision project will also editorially merge previous revision and all amendments completed by that time (802.16h, j, m)