Presentation is loading. Please wait.

Presentation is loading. Please wait.

Project Planning Committee (PPC): Report

Similar presentations


Presentation on theme: "Project Planning Committee (PPC): Report"— Presentation transcript:

1 802.16 Project Planning Committee (PPC): Report
IEEE Presentation Submission Template (Rev. 9) Document Number: IEEE ppc-10/0004 Date Submitted: Source: Jose Puthenkulam Project Planning Committee Chair Venue: Bangalore, India Base Contribution: None Purpose: Project Planning Committee Report Notice: This document does not represent the agreed views of the IEEE Working Group or any of its subgroups. It represents only the views of the participants listed in the “Source(s)” field above. It is offered as a basis for discussion. It is not binding on the contributor(s), who reserve(s) the right to add, amend or withdraw material contained herein. Release: The contributor grants a free, irrevocable license to the IEEE to incorporate material contained in this contribution, and any modifications thereof, in the creation of an IEEE Standards publication; to copyright in the IEEE’s name any IEEE Standards publication even though it may include portions of this contribution; and at the IEEE’s sole discretion to permit others to reproduce in whole or in part the resulting IEEE Standards publication. The contributor also acknowledges and accepts that this contribution may be made public by IEEE Patent Policy: The contributor is familiar with the IEEE-SA Patent Policy and Procedures: < and < Further information is located at < and < >.

2 Outline M2M Study Report and PAR & 5C Development Plans for this week

3 M2M Study Report & PAR Development Plan
Goal: Finalize M2M Study Report and PAR by May Call for Initial Contributions issued for Study Report and PAR on March 24, 2010 for submission by April 5th AOE based on Initial Draft ToC ( /0024). Contributions also invited Conference Calls Planned for Development: CC#1: April 6: 8:30-10:30PM PST CC#2: April 15: 7:00-9:00AM PST CC#3: April 22: 7:00-9:00AM PST CC#4: April 26: 8:30-10:30PM PST CC#5: April 28: 7:00-9:00AM PST CC#6: May 3: 8:30-10:30 PM PST Agenda Schedule for Conference Call discussions: CC#1: Overall Plan, ToC Updates & Usage Models CC#2: Architecture & Requirements & Usage Model Updates CC#3: Requirements, Architecture, Usage Model Completion CC#4: Requirements &Architecture Completion, Standard Impacts for PAR Scope, Updated PAR Form & 5C CC#5: PAR Form & 5C Updated Draft for May Session & Study Report Final Draft CC#6: Study Report Final Draft Updates for Recommendations & Standards Impact, Introduction text, PAR Form and 5C comments Final Study Report and PAR & 5C expected to be completed this week in Session #67

4 Machine to Machine (M2M) Communications Study Report Development Status
The M2M Study Report was developed and available as document ppc-10/0002r6 (at Call for Comments was issued with a deadline of May 10th 5PM IST, for discussion this week Intent is to work towards completion of the M2M Study Report this week

5 Machine to Machine (M2M) Communications PAR & 5 Criteria Development Status
M2M PAR Form and 5C that was developed is available as document ppc-10/0003r3 (at Call for Comments was issued with a deadline of May 10th 5PM IST, for discussion this week Intent is to work towards WG approval for the M2M PAR and 5C this week

6 Plans for this week PPC Meeting Room is Sigma II/III
Timeslots and Agenda this week: Tue: AM1: 9-11AM; AM2: 11:15AM-1PM Comment resolution on M2M Study Report and M2M PAR & 5C Future Project Study Items Wed: AM1: 9-11AM; Wed: AM2: 11:15AM-1PM Joint session with GRIDMAN Discuss any PAR issues Thu: AM1: 9-11AM; AM2: 11:15AM-1PM Finalization of Study Report Finalization of M2M PAR & 5C for WG Approval Finalization of Plans for future Project Study items


Download ppt "Project Planning Committee (PPC): Report"

Similar presentations


Ads by Google