Download presentation
Presentation is loading. Please wait.
Published byLinda Stone Modified over 6 years ago
1
IGG Agenda – April 19th 2007 Minutes from last IGG meeting – 10.10 Review of Action Items – 10.20 CER Update – 10.30 Gemserv Update – 10.40 Market Operations Update – 11.00 Networks SEM Update – 11.40 Retail Market Design Service Update – 11.50 Market Design Update – 12.00 Discussion Requests & Market Change Requests Next Steps 1
2
Minutes Minutes from IGG meeting – March 8th 2007 2
3
Action Items Actions Addressed in Advance of Meeting
Update on Action Items Actions to be covered during remainder of presentation Actions to be carried forward Other Action Items 3
4
Actions addressed in advance of meeting
Action Item 14 Reminder to be sent out to Suppliers for nominations for the Assurance Advisory Group Action Item 15 Publish agreed ToR for AAG on RMDS website Action Item 42 Circulate the agenda for Suppliers Forum (CER) 4
5
Update on Action Items Action Item 7 – RMDS to investigate the procedural issue whereby a duplicate MPRN is generated when a quotation is ‘rolled back’ Working Practice 13 redrafted covering points made at the last IGG ESB Networks currently reviewing the document Will issue to Market Participants shortly 5
6
Update on Action Items Action Item 9 – Review possibility of creating and providing dedicated MPRN data for use in all IPT tests This approach was used in a recent Requalification IPT Lessons learnt: - IPT SAP client will always be out of sync with live - Will suppliers live with different data for every IPT? - Refresh of IPT SAP client will mean loss of generated test data 6
7
Update on Action Items Action Item 13 – RMDS Draft Business Plan 2007
Issued to MPs on 5th January Final version with CER for approval 7
8
Action Items to be covered later in the presentation
MCR 0127 Decoupling of the Connection Agreement from Change of Supplier Action Item 12 Update DR Versioning of the 341 message Action Item 16 ESB Networks to report to CER on erroneous de-registrations Action Item 23 DR 0103 – Vulnerable Customers 8
9
Action Items to be carried forward
Action Item 1 – Update MCC Guidance document Document in Final Review Stage 9
10
Action Items to be carried forward
Action Item 5 – MCR 0130 – Extra validation checks required at creation of 306, 307, 106 and 332 messages MCR 0130 to issue shortly 10
11
Action Items to be carried forward
Action Item 8 – Investigate whether new 131 message could be issued for Special Read Request DR 0117 has been updated and will issue shortly 11
12
Action Items to be carried forward
Action Item 10 – Prepare proposals on addresses in the Retail Market Deferred until after SEM go-live at the request of the IGG 12
13
Action Items to be carried forward
Action Item 24 – DR New MPD 37 New Transmission Connected Sites Follow-up in progress 13
14
Action Items to be carried forward
Action Item 38 – RMDS to investigate if there is a quicker route for raising basic changes Agreed at March IGG to defer this item until June IGG meeting 14
15
Action Items to be carried forward
Action Item 39 – Get information on the volumes of readings – by DUoS Group - rejected because they are outside of the tolerance ranges Information requested but not available yet 15
16
Action Items to be carried forward
Action Item 40 – Investigate, as part of DR 0128, whether advanced readings for de-energised sites could be outsorted Item under investigation Advanced Readings issue complicated by late CX111 processing 16
17
Action Items to be carried forward
Action Item 41 – RMDS to raise a DR to propose the initiation of the updates to the Market systems of a QH to QH meter replacement at the same time as the MV90 is updated Under investigation 17
18
CER Update 18
19
Gemserv Update 19
20
Market Operations Update
20
21
Market Operations Update
MRSO Update 21
22
Market Operations Update
Information Point When acquiring a multi-site customer e.g. county council, could suppliers please check the MP Extranet for all of the relevant MPRNs to establish whether the sites are currently energised and confirm those that require energisation as the CoS process will automatically raise a re-energisation service order for de-energised sites on receipt of 010 22
23
Retail Electricity Market Issues Update
Cormac Madden, RMDS 23
24
Retail Electricity Market Issues Log
Log continuing to issue on a weekly basis Summary Statistics (as per last release – ) Total Number of Issues Logged Total ‘Closed’ Total ‘In Progress’ Total ‘Being Monitored’ Total ‘Logged’ Issues Resulting in DRRs Total Raised Since Last Issue Total Closed Since Last Issue 24
25
Retail Market Design Service Update
C. Madden, RMDS 25
26
Retail Market Design Service Update
RMDS have passed NSAI Audit and have been recommended for ISO 9000:2001 Vulnerable Customer – Phase 1 – go live date 3rd May 2007 Information Point for Suppliers: - when a supplier is acquiring a multi-site customer, could they please check the MP Extranet for all of the MPRNs and establish whether the sites are energised and confirm those that require energisation as CoS process automatically raises a re-energisation service order 26
27
Discussion Requests & Market Change Requests
Oonagh Delaney, RMDS 27
28
New Market Change Request
MCR Vulnerable Customer Requirements Circulated to the market on 12th April Feedback by next Conference Call 28
29
New Market Change Request
MCR Decouple Connection Agreement requirement from Change of Supplier where MIC >= 100kVA and there is no Change of Legal Entity Following market approval this MCR is with CER for approval 29
30
Market Change Requests
The following two MCRs went live as part of the Networks Special Enhancements project on 11th April 2007 MCR Changes required to MPD 5 to cater for Management of QH Eligibility All new connections at LV (excluding embedded generators) will be set up as NQH (currently LV new connections at 200KVA or higher are set up as QH). MCR MPD 35 CHANGE OF METERING FROM NQH TO QH This process covers the procedure for changes of metering from NQH to QH requested by the registered supplier at a meter point or following regular review of existing NQH sites by QHDC. These Changes will be incorporated in Version 6.1 of the Market Design. 30
31
Discussion Request MCR 144 – Data changes to accommodate new unmetered lamp types Circulated to the market on 12th April Feedback by next Conference Call 31
32
Discussion Request DR 123 - Versioning of the 341 message
Version 1.4 Circulated to the market on 12th April Feedback by next Conference Call 32
33
Next Steps Proposed Diary dates for subsequent meetings 07.06.07
(proposed date change from 12th July) 33
34
Next Steps Propose to continue with conference call every two weeks – proposed dates Call details will remain the same: Number: PIN : Contingency number remains: PIN: 60236 34
35
Thank You 35
Similar presentations
© 2024 SlidePlayer.com Inc.
All rights reserved.