Presentation is loading. Please wait.

Presentation is loading. Please wait.

2016 Product Additions and Improvements

Similar presentations


Presentation on theme: "2016 Product Additions and Improvements"— Presentation transcript:

1 2016 Product Additions and Improvements

2 New Saddle Color available in Oak, Maple, and Cherry

3 Installed Accessories
BFH9PO BFH12PO SWB18 SWB21 SWB24

4 DWB18 DWB21 DWB24 DWB21FH DWB24FH

5 Base Corner Cabinets PBC48PO-L PBC48PO-R EXAMPLES OF RIGHT HAND
PBC48LM-L PBC48LM-R

6 Corner Wall Cabinets LSCWC2430 LSCWC2730 LSCWC2436 LSCWC2736 LSCWC2442

7 Roll-Out Trays All roll-outs in wood Punch-out system
The drawer dictates standard drawer or FX S in single door at bottom with shelf D in single door-one at bottom-one in middle position Full height door will be in same position as standard cabinet RT in UCs will only come with 4 RT option Available in Spring 2016

8 Mirror Trim

9 Floating Shelves

10 VANITY COLLECTION EXPANDED

11

12

13

14

15 Additional Hoods Additional 48” Wide Hoods Where Available
New Artisan Hood- 36”, 42”, 48” New Euro Hood-30”, 36”, 42” (Special Order) New Mantle Hood-48” and 60” Liners Included Blowers available in 390 and 500

16 Range Hood Additions RHART36 RHART42 RHART48

17 Euro Hood RHEUR30 RHEUR36 RHEUR42 (Special Order)

18 Mantle Hood RHMNT48 RHMNT60

19

20 Range Hood Chimney Nomenclature changed to be width and height

21 Utility Cabinet Expansion
All top areas will have the same amount of shelves as a wall cabinet The bottom will have 3 shelves If it gets a roll-out trays, they will get 4 Roll-outs available as standard in 24” and 21” deep cabinets Added 21” deep as standard Added 12”, 21”, 27”, and 33” wide

22 Refrigerator Panels Added 108” and 120” High Veneer and Plywood
No new ones in birch Available in RP (1 ½” Styles) RP3 (3” Styles) REP

23 Additions Hinge Handing-February 1 4X4 Beadboard
OCs will have BP doors available WCC double doors will have BP doors available Remove toe kick - $225 Modification Fill in gaps: UFWD327P LSWD327P VFWD3 These fillers will come with no toekick attached

24 CABINET REVISIONS

25 Microwave Cabinet Changes-Trim
Decrease top rail to 1 ½” Replace bottom drawer with D4B Added 33”

26 Microwave Cabinet

27 Farm Sink Redesign 18” High Cabinet Doors 10” Rails
Approximately 3.5” at top Added 39”

28 Changes Painted Lead Time back to 2 weeks
Natural interior in Alpine and Fairmont Plan in place for replacement and add-on to orders Cut-off the week of February 22nd for zones Cut-off February 26th for non-zones Original ship date of March 14th All Fairmont accessories will be priced as maple Alpine Exception is Refrigerator Panels Plywood cabinets only available unfinished or both sides finished Discounted end price

29 Nomenclature Changes VSD30 VFHSD30 VSD36 VFHSD36 VSD30BH VSSD30BH
VDL58 VFHMD58BP VDL58BH VSMD58BPBH RPBC PBC OVDUC OVDUC8412S(Set)

30 General Launch Information
Target Date Samples Week of 2/15 .pdf of Price & Spec book 20/20 Update/Pricer Week of 2/22 ProKitchen March Letter/Literature/Price Book White Casing Pricing Noon on 2/26 Saddle on Website 2/27 .pdfs and launch literature on website

31 QUESTIONS??


Download ppt "2016 Product Additions and Improvements"

Similar presentations


Ads by Google