1
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Fatality Prevention in the Workplace Forum Fatality Prevention in the Workplace Forum Managing the Contractor/ Contracted Services Risk Breakout – Best Practice Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation
2
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Process Flow 2 Pre-qualification & Verification Job-Site Monitoring Contract Language Mitigate Deficient Contractor Stop Work -Action-
3
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Contractor Pre-Qualification/Verification Trigger: The pre-qualification process does not always lead to selection of best contractor: 1. Need to select “less than “perfect” vendor 2. Limited vendor pool 3.No choice on vendor selection Examples The process needs to be set-up to manage risk “less than perfect contractors” bring: 1. Additional resources directed to “short list” contractors-paper vs. field review 2. Additional resources directed to deficient contractors 3. Establishing processes to select contractor with “eyes wide open” 3
4
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Using Contracts to Manage Risk Trigger: Contractors have a limited understanding of the risks they bring on site-either risks to themselves or others(other contractors/host employees) The contract can be used to manage the risk by specifying controls which flow directly from the scope of work. Examples: 1.Pre-task meeting with layers of participation designated. 2.Site safety officer. 3.Site specific safety plan. 4.Audits of compliance (host employer, contractor, joint) 5.Monitored corrective action. 1
5
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Monitoring Contractors While On-Site Trigger: Highest risk is presented during work performance and requires numerous controls to manage the risk Examples 1. Communication processes must be 2-way so that both parties have multiple methods. 2. Monitoring by host employer is “close.” This is done by management level staff as well as employees (Red Scorpion Team). 3. Single point of contact (host employer) is available for contractors. This also occurs during project start-up process. (Can be 1-year+ process.) 4. Publications/materials designed to inform & educate host employees are shared with contractors (ArcelorMitttal). 5. Formal safety meetings are held with all contractors & host employer representatives (annual/quarterly safety meetings/conferences) a. Senior management participation is critical b. Contractors asked to present on topics 6. Contractors utilize self-assessment process for risks (HIRAC) 7. Incident lessons learned are shared with all contractors 5
6
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Multiple Company Best Practice Alcoa, Chevron, Flour Const, Duke Energy and GM 6
7
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Stop Work Authority Trigger: Employees DO NOT FEEL EMPOWERED even though they are trained in stop work program Hazard : Situation where unsafe condition is observed and not corrected by other employees (includes hoist & contractor). Need to “reprogram” thinking that it is OK to exercise stop work authority Contract language Job conditions explicitly outlined in pre-task meeting/JSA Employee “Does Not Feel Right” STOP AND SEEK OUT (Alcoa) Good Faith Assumption - Consequence Free Source: Alcoa, Chevron, Flour Const, Duke Energy and GM 1
8
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation - Improving Deficient Contractor Performance Kathy Wilmer, Duke Energy 8
9
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Mitigating Deficient Contractors ISSUE: Dealing with contractors who have demonstrated deficient performance: On-Site and Post-Project Processes for dealing with deficient contractor safety performance have been developed in the business units. If a contractor is deficient, management and Health & Safety will evaluate the contractor’s programs and management commitment and then decide to either: Provide mentoring and continue the relationship. Determine if probationary period is appropriate. Suspend operations temporarily. Communicate Duke’s expectations. Discontinue the relationship permanently. Deficient performance includes: Observed performance deficiencies. Violation of Duke’s critical safety rules Fatality or serious injury Fitness for duty concerns. Message or Graphics area Senior management involved - site visits occur Source: Duke Energy 1
10
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Improving Deficient Contractor Performance- Duke Energy Dealing with contractors who have demonstrated deficient performance. Processes for dealing with deficient contractor safety performance have been developed in the business units. If a contractor is deficient, management and Health & Safety will evaluate the contractor’s programs and management commitment and then decide to either: Provide mentoring and continue the relationship. Determine if probationary period is appropriate. Suspend operations temporarily. Communicate Duke’s expectations. Discontinue the relationship permanently. Deficient performance includes: Observed performance deficiencies. Violation of Duke’s critical safety rules Fatality or serious injury Fitness for duty concerns. Message or Graphics area Source: Duke Energy 1
11
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Best Practice Tip 11 The sequence described below has been conducted for several serious injuries/ fatalities: 1.Incident investigation was conducted by Duke and contractor. 2.Corrective actions related to the event were assigned and completed. 3.Duke senior management and staff personnel visited contractor home office to meet with executives there. 4.Duke senior management communicated expectations and evaluated contractor management commitment. 5.Duke staff evaluated contractor’s programs. 6.Duke management and staff made decision to continue relationship in a mentoring mode OR discontinue relationship. 7.Continue? Contractor was assigned action items related to improving company programs, management commitment. 8.Duke management followed through over time with contractor progress in completing actions. Source: Duke Energy
12
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation H&S Contractor Management System Mike Dwyer, ArcelorMittal 12
13
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation To ensure all contractors and sub-contractors working perform the job as per the safety and environment management system H&S Contractor Management System Contractor Management Step by Step program focuses on improving health and safety performance of the contractors and the reduction of lost time incidents and fatalities. This is also the aim of Journey to Zero program. 1 Contractor Selection Contract Preparation Contract Award Orientation and Training Managing the Work Periodic Evaluation ArcelorMittal
14
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Best Practice Tip 14 Good Practices When selecting the contractors, we must consider the historical H&S performance, the suitable OH&S management system and the skills and behavior of their employees. contractors analyze the risks and present their own safety plan. On the basis of this safety plan and other purchasing requirements, the contractor is selected and the contract or the purchase request can be written or updated a pre-job conference, with the owner and all the contractors involved in the works; a risk assessment is performed at this moment and preventive measures are decided upon, in order to work safely audits need to be done during contractor work. If necessary, corrective actions need to be put in place Source: ArcelorMittal
15
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Risk Assessment Process Dave Bielecki, ArcelorMittal 15
16
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation ArcelorMittal Risk Assessment Process HIRAC-lite example (non-routine & infrequent tasks) 20 red (watch-out) boxes available, number of red boxes selected indicated risk profile for the task (note: controls must be identified for each red box selected by the team) 2
17
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Best Practice Tip 17 Contractors must conduct a formal risk assessment by completing a Hazard Identification, Risk Assessment and Control Checklist such as the HIRAC-Lite or similar document Source: ArcelorMittal
18
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Reducing risk through Implementation of Global Safe Permit to Work Program Heath Huschak, Koppers 18
19
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Reducing risk through Implementation of Global Safe Permit to Work Program (Koppers) Standardizing required controls for Employees and Contractors who perform tasks within scope of Safe Permit to Work Program Hazard – Various employee and contracted tasks with high hazard. Triggering Event – Lack of consistent control measures to manage known higher risk activities, some of which are known to result in fatalities. Fatality involving employees working on burner control equipment and improperly bypassing critical burner controls. 4 Source: Koppers
20
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Reducing risk through Implementation of Global Safe Permit to Work Program Standardizing required controls for Employees and Contractors who perform tasks within scope of Safe Permit to Work Program Best Practice – Develop policy, standard permits and guidance appendices for tasks within limited scope of program. Requires formal Task Hazard Assessment prior to assignment of work. Scope Includes: Hazardous Atmospheres Confined Spaces, External IDLH not associated with CSE Hot Work Working at Heights Scaffolding inspection standards Regulates of crane man basket work Requires formal evaluation of “ad hoc” use of fall arrest equipment 4 Source: Koppers
21
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Reducing risk through Implementation of Global Safe Permit to Work Program Standardizing required controls for Employees and Contractors who perform tasks within scope of Safe Permit to Work Program Scope Includes (cont.): Working on or near Energized Circuits Working on Critical Control Systems Boiler/Furnace Firing and Control Systems Fire Protection Detection and Suppression Systems Pressure/Vacuum Protection Systems or Devices Production Process Controls Environmental Pollution Control Equipment Special Hazards (radiological, asbestos, excavations, high pressure services) 4 Source: Koppers
22
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Engaged leadership taking project ownership Robert T. Geary, General Motors Corp. 22
23
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Engaged leadership taking project ownership Company leadership expectations to field managers on roles and responsibilities Corrective Measure – Top company leadership representing Operations, Manufacturing Engineering and Purchasing communicated rolls and responsibilities to those having oversight responsibility for managing construction and contracted services. The communication summarized recent incident events and leadership expectations to increase efforts of providing stronger oversight for all high risk work. - Triggering Event s– After a series of serious incidents that occurred on a number of global project/plant sites, several members of the top company leadership strategized on how field performance can be improved with both construction and contracted service suppliers. This company is currently engaged with manufacturing operations in over 30 countries and has over 100 ongoing construction related projects throughout the world. In the past year, 5 fatal incidents occurred with contracted service employees. 4 Contact Information: Global Health & Safety General Motors Corporation
24
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation 24 Company leaderships expectations to field managers on rolls and responsibilities Engaged company leadership taking project ownership Directive to Field : Internal leadership communication was published to summarize project /contract ownership rolls and responsibility with additional focus to emphasize that all high risk work performed by contractors/contracted service resources have greater company oversight of the work being performed. Communications and process changes to key focus areas, include; -All contractors must be adequately trained in the work being performed. (Verify prior to commencing work) -Past contractor safety performance must be part of the pre-bid process. Global standards set. -Company project and service provider managers must provide greater “oversight” of both contract compliance and field safety performance. High risk operations must have increased company oversight in overseeing all high hazard work. -Layered audits will be performed to assure compliance with all safety practices. Contact Information: Global Health & Safety General Motors Corporation
25
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Contractor Safety at United States Steel Corporation Edward Mazurkiewicz, US Steel 25
26
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 1 Contractor Safety at United States Steel Corporation
27
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Discussion Topics S-001 Key Elements U. S. Steel Managements Responsibilities Source: United States Steel Corporation 2 Contractor Safety at United States Steel Corporation
28
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation S-001 Key Elements U. S. Steel’s standard specification for contractors Sets forth the governing contractor safety responsibilities Contractors must be pre-approved by the Safety and Industrial Hygiene Department Contractors are required to comply with S-001 whenever working on U. S. Steel property Source: United States Steel Corporation 3 Contractor Safety at United States Steel Corporation
29
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation S-001 Key Elements Establishes a minimum level of contractor safety requirements for all persons working within U. S. Steel facilities Is not intended to provide legal or other professional advice Is U. S. Steel’s legal responsibility to warn contractors of all the hazards (hidden or obvious) that they may encounter Source: United States Steel Corporation 4 Contractor Safety at United States Steel Corporation
30
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 5 Contractor Safety at United States Steel Corporation
31
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 6 Contractor Safety at United States Steel Corporation
32
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 7 Contractor Safety at United States Steel Corporation
33
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation U. S Steel Management's Requirements Before a contractor is permitted to perform work inside a U. S. Steel facility, we must: Have U. S. Steel Procurement approval Have Safety Program reviewed by ISNetworld Purpose Ratings Weight on grading Plant protection procedures reviewed and approvals given Attend contractor orientation by the Safety Department Source: United States Steel Corporation 8 Contractor Safety at United States Steel Corporation
34
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation U. S. Steel Management's Requirements Department Management administers the following PRIOR to start of job: U. S. Steel Contractor Safety Line-Up form U. S. Steel Work Permit Site-specific hazards related to contractor project Source: United States Steel Corporation 9 Contractor Safety at United States Steel Corporation
35
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 10 Contractor Safety at United States Steel Corporation
36
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 11 Contractor Safety at United States Steel Corporation
37
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation U. S. Steel Management's Requirements Inform contractor management of site-specific hazards Do not supervise contractor employees Assist in emergency situations Consistently administer and record Contractor Safety Line-Up, Work Permits, etc. Source: United States Steel Corporation 12 Contractor Safety at United States Steel Corporation
38
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation U. S. Steel Management's Requirements The U. S. Steel Manager conducting the safety line-up meeting must be from the operating area where the contractor will be working Additional line-up meetings shall be conducted whenever the designated U. S. Steel Manager deems it necessary based on changes in work scope, site conditions, or hazard. Source: United States Steel Corporation 13 Contractor Safety at United States Steel Corporation
39
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation U. S. Steel Management's Requirements Day of Job: Ensure each contractor employee has been through U. S. Steel Contractor Orientation Training Has up-to-date D&A testing Has checked in with Security at the gate U. S. Steel site management must complete the Work Permit Contractors must conduct and document a pre-task plan Source: United States Steel Corporation 14 Contractor Safety at United States Steel Corporation
40
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation Source: United States Steel Corporation 15 Contractor Safety at United States Steel Corporation
41
Sponsored by Indiana University of Pennsylvania Safety Sciences Department in cooperation with Alcoa Foundation ALL Incidents MUST Be Reported! When an incident occurs, contractors must: STOP work and secure the work area Report the incident to: 1. Plant Protection 2. Department Manager AND 3. Safety Department Begin investigations File preliminary report by end of shift File final report within 24hrs Source: United States Steel Corporation 16 Contractor Safety at United States Steel Corporation