JBMCambridge Workshop 6th to 7th January 2003 1 DAQ-DCS Communication.

Slides:



Advertisements
Similar presentations
ECAL Electronics, DCS Main DCS console (PVSS, JCOP Framework) Main DCS console (PVSS, JCOP Framework) HV (PVSS) LV (?) DSS (PVSS) Cooling (?) Laser (?)
Advertisements

Preparation for ATLAS SCT/ID Endcap Completion at CERN Jo Pater Manchester, 4 January 2006.
The Control System for the ATLAS Pixel Detector
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
TPC-RO DCS set-up PVSS main(s) Iseg OPC server HV Iseg crates (3)LV Wiener crates (22) CAN bus Interface to FEE -temp.mon -I &V mon. Wiener OPC server.
SPD DCS Status Report Ivan Amos Calì a,b, S.Ceresa a,c, C.Torcato de Matos a a CERN-AIT a CERN-AIT b Università degli studi di Bari b Università degli.
Peter Chochula CERN-ALICE ALICE DCS Workshop, CERN September 16, 2002 DCS – Frontend Monitoring and Control.
8 April Doors Network Configuration Parameters (Single Site Mode)
Peter Chochula, January 31, 2006  Motivation for this meeting: Get together experts from different fields See what do we know See what is missing See.
Introducing GAC’s New Line of Intelligent Generator Set Controllers
The Detector Control System for the ATLAS SemiConductor Tracker
1.ATLAS and ID 2.SCT 3.Commissioning 4.Integration 5.Latest Runs 6.Conclusions Commissioning the ATLAS Silicon Microstrip Tracker IPRD08 - Siena Jose E.
March 2003 CHEP Online Monitoring Software Framework in the ATLAS Experiment Serguei Kolos CERN/PNPI On behalf of the ATLAS Trigger/DAQ Online Software.
28 June 2004 ATLAS SCT/Pixel TIM FDR/PRR Martin Postranecky TIM OVERVIEW1 ATLAS SCT/Pixel TIM FDR/PRR 28 June 2004 Physics & Astronomy HEP Electronics.
Chabot College ELEC autoinstall and SLARP.
Susanne Kersten, Wuppertal University November 21/22, 2013.
Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2012 Xavier Vilasis.
DAQ System at the 2002 ATLAS Muon Test Beam G. Avolio – Univ. della Calabria E. Pasqualucci - INFN Roma.
Summary DCS Workshop - L.Jirdén1 Summary of DCS Workshop 28/29 May 01 u Aim of workshop u Program u Summary of presentations u Conclusion.
What is system software and what are its parts? Programs that control operation of computer Two parts are operating systems utility programs.
MDT PS DCS for ATLAS Eleni Mountricha
SMACS Slow Monitor And Control System Developed system for CDF-TOF proposed for Atlas-MDT/RPC.
JCOP Workshop September 8th 1999 H.J.Burckhart 1 ATLAS DCS Organization of Detector and Controls Architecture Connection to DAQ Front-end System Practical.
REMOTE POWER SWITCHES HARDWARE TPC uses three remote power switches installed on the platform which are used to power cycle various devices. The switches.
Clara Gaspar, October 2011 The LHCb Experiment Control System: On the path to full automation.
INTER REGIONAL PROCESSOR. DESIGN PHILOSOPHY n Based on industry standard pc hardware. n Industrial specification IBM compatible computer running Fylde.
XXVI Workshop on Recent Developments in High Energy Physics and Cosmology Theodoros Argyropoulos NTUA DCS group Ancient Olympia 2008 ATLAS Cathode Strip.
DCP 12 May 2010 Jan Godlewski PH-DT-PO 1 DETECTOR COOLING PROJECT WP2 CO2 activities status report Jan Godlewski PH-DT-PO
André Augustinus 10 September 2001 DCS Architecture Issues Food for thoughts and discussion.
22 October 20151/23Fabio Vinagre -- TileCal DCS TileCal DCS Expert tutorial - DCS 22 October 2015.
June 3, 2005H Themann SUSB Physics & Astronomy 1 Phenix Silicon Pixel FEM S. Abeytunge C. Pancake E. Shafto H. Themann.
ATLAS DCS S. KhomoutnikovDDC Tutorial1 DAQ – DCS Communication Tutorial ( DDC v. 4.1, online ) 58 slides with comments printing note pages before.
SMS Module Model : SB-DN-SMS/IP Configuration of SMS Module.
European Organization for Nuclear Research Geneva - Switzerland Ing. Robert van der Vlugt CERN/PH Alice Detector Control System Serial Communication, simple,
Giovanni Polese1 RPC Detector Control System for MTCC Pierluigi Paolucci, Anna Cimmino I.N.F.N. of Naples Giovanni Polese Lappeenranta University.
MICE RF System Power Supplies, Control and Monitoring Status report February 2012 Chris White, STFC Daresbury Laboratory MICE Collaboration Meeting CM32,
Online Software 8-July-98 Commissioning Working Group DØ Workshop S. Fuess Objective: Define for you, the customers of the Online system, the products.
Overview of DAQ at CERN experiments E.Radicioni, INFN MICE Daq and Controls Workshop.
CERN, O.Pinazza: ALICE TOF DCS1 ALICE TOF DCS Answers to DCS Commissioning and Installation related questions ALICE week at CERN O. Pinazza and.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
Alice DCS workshop S.Popescu 1 1. News from TPC DCS cooling prototype Project overview: Aim of the prototype: investigating and developing standard.
Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.
28 June 2004ATLAS Pixel/SCT TIM FDR/PRR1 TIM tests with ROD Crate John Hill.
Alice MTR DCS F.Jouve 15 th DCS workshop CERN 13/03/2006 UX-A,B,D Detector PVSS II Detector Ethernet Database(s) OPC client DIM client 1672 Detector ?
1 H C A L S.Sergueev, NEC2001, Varna, September 2001 CMS HCAL Slow Control System for the CMS Hadron calorimeter S.Sergueev, FNAL/JINR CMS HCAL.
Alice DCS workshop S.Popescu ISEG Crate controller + HV modules ISEG HV modules 12 Can bus PVSS OPC Client 1 Generic OPC Client Iseg OPC.
GIF++ Control System (GCS) Gilles MAIRE PH-DT-DI1.
17 Establishing Dial-up Connection to the Internet Using Windows 9x 1.Install and configure the modem 2.Configure Dial-Up Adapter 3.Configure Dial-Up Networking.
ATLAS SCT Power Supply System
DCS Workshop, CERN MARCH ACORDE (Alice Cosmic ray detector) 60 scintillator modules (120 HV channels) Each module will have two scintillator counters.
DCS Workshop 17 June 2002 PHOS DCS status Serguei Sadovski.
5th March 0718th DCS Workshop1 News on ISEG & WIENER Lionel Wallet, CERN High Voltage, Low Voltage & VME Crate control.
Programming Software and Setting. Default IP Add : , also can be changed via Programming Software, if forget IP address, Programmer can.
AFP Trigger DAQ and DCS Krzysztof Korcyl Institute of Nuclear Physics - Cracow on behalf of TDAQ and DCS subsystems.
Status of the DCS Richard Brenner (Uppsala University) " Structure of the DCS " Cabling of DCS sensors " Interlock " Status and near future plans.
FPD SOFTWARE TEST MOTIONS / CONNECTIONS / CONFIGURATION / SOFTWARE / TESTS / CONCLUSION Lionel Peyrichoux 14 March 2001.
S.Sergeev (JINR). Tracker consists of  4 stations of 4 views (planes) each In total ~7200 drift tubes (~450 per view) To be controlled/monitored 
1 DAQ.IHEP Beijing, CAS.CHINA mail to: The Readout In BESIII DAQ Framework The BESIII DAQ system consists of the readout subsystem, the.
Summary of TPC/TRD/DCS/ECS/DAQ meeting on FERO configuration CERN,January 31 st 2006 Peter Chochula.
André Augustinus 17 June 2002 Detector URD summaries or, what we understand from your URD.
DCS Meeting - 17/6/2002 G. De Cataldo, A.Franco - INFN Bari - 1 The implementation of the HMPID DCS in the PVSS-JCOP Framework The Liquid Circulation and.
10/09/10FV 1 News and observations from Brussels' meeting.
André Augustinus 18 March 2002 ALICE Detector Controls Requirements.
Mitglied der Helmholtz-Gemeinschaft PANDA MVD Slow Control Issues Harald Kleines, Forschungszentrum Jülich, ZEA-2.
Lar status Calorimeters cold and stable: The pressure in the C-side cryostat is not nominal because of a problem being fixed An electronic repair campaign.
20OCT2009Calo Piquet Training Session - Xvc1 ECS Overview Piquet Training Session Cuvée 2009 Xavier Vilasis.
FPix DCS Subgroup Report
The Data Handling Hybrid
DAQ for ATLAS SCT macro-assembly
RPC Configuration DataBase Pierluigi Paolucci - I.N.F.N. of Naples.
Presentation transcript:

JBMCambridge Workshop 6th to 7th January DAQ-DCS Communication

JBMCambridge Workshop 6th to 7th January Supervisor Modules HVLVT Cooling Monitor Barrel & Surroundings CoolingCold Room FSI Temp Mechanics Chiller NESLab Robot & UPS Racks Humidity Pressure Power Crates DAQ (Main) PVSS DAQ (RCC ) TIM ROD DCS for Barrel Assembly Provider ROD PC Serial Port Non-ELMB CAN Serial CAN Link TCP/IP (Ethernet) VME F-O link To Modules DDC Commands Responses (Status, acks) Crate Controller Cooling System PLC Serial Link Monitoring Commands + Monitoring DCS-DAQ information

JBMCambridge Workshop 6th to 7th January DAQ States and Transitions Running Paused Configured Loaded Initial Absent(Off) Closed StartStop PauseResume ConfigUnconfig Load Unload Shutdown Boot SetupBoot Cold Start Lukewarm StartLukewarm Stop Cold Stop Warm StopWarm Start ShutdownClose

JBMCambridge Workshop 6th to 7th January DCS States and Transitions Monitoring Running Monitoring Configured Off Configured Monitoring Running DCS Status Local Control Remote Control LV=On, HV=Standby LV=Standby, HV=Standby LV=On, HV=On

JBMCambridge Workshop 6th to 7th January

JBMCambridge Workshop 6th to 7th January States and Voltages Local Remote DAQDCSLVHV Off/Initial Loaded Configured Running Off Configured Monitoring Remote Off On Off On Standby (ATLAS) On Off Paused Running Configured Loaded Off/Initial Remote Off Standby (or higher) Local DCS

JBMCambridge Workshop 6th to 7th January Command Summary DAQ->DCS. Change State DCS->DAQ. Confirm successful processing of request. DCS->DAQ. Alarm message. DAQ->DCS. Request IV curve. DAQ->DCS. Perform a hard reset. DAQ->DCS. Confirm successful processing of request. DAQ->DCS. Perform DCS parameter dump. DAQ->DCS. Set/check value of CLOCK SELECT control line. DAQ->DCS. Set/check VCSEL bias. DAQ->DCS. Set/check PIN bias. DAQ->DCS. Set/check ALL LV and HV values.

JBMCambridge Workshop 6th to 7th January Command Format … XXX Commands/Functions will be provided via the SCT API XXX Numerical or text data is passed between DAQ and DCS

JBMCambridge Workshop 6th to 7th January Addressing Components Addressable items are: Barrel Row Module ROD MUR Module Serial Number ALL Disk Ring Quadrant

JBMCambridge Workshop 6th to 7th January DDC : Existing Facility DDC-CT DAQ->DCS Command DAQ<-DCS Response DDC-MT DCS->DAQ Message DDC-DT DAQ DCS Data

JBMCambridge Workshop 6th to 7th January Specific Member Functions void setDcsToRunning()int confirmDcsToRunning() void setDcsToMonitoring()int confirmDcsToMonitoring() void requestIvCurve ( string curveDetails ) void requestHardReset()int confirmHardReset() void setItemXxxxxx( string settingDetails )

JBMCambridge Workshop 6th to 7th January End

JBMCambridge Workshop 6th to 7th January Domain Controller Oxford ATLAS Assembly Computer Network Back to DCS for Barrel Assembly