Presentation is loading. Please wait.

Presentation is loading. Please wait.

Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII.

Similar presentations


Presentation on theme: "Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII."— Presentation transcript:

1

2 Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII – Problems 2

3

4 4

5 5

6 6

7 7

8

9 SCT Shift Desk ACR, CERN, Meyrin Shift Leader Desk ACR, CERN, Meyrin 9

10 TDAQ ScreenDQM Screen DCS and Alarm Screens 10

11 11

12 12

13 13 Short summary….. ******************************************* 15.00: start of shift 15.04: Recovered module Crate 22 Ch 4 which showed a trip error. 17.03: end of run 139303 17:05 Expert takes over DAQ to investigate XXX 18:30 DAQ tests concluded. The result is that blah blah blah... and more blah, blah, blah… Changes have been applied, blah, blah, blah… 18.40: SCT on stand-by 19.17: Start of Physics run 139334 19.30: SCT on during LB 6. 20.00: Monitoring the number of errors, stable and around 20-30,see separate report from MON shifter. … 21.12: Run 139336. Try a short cosmics run again (8 bins, 1000 triggers, timeout 60s) Result status -> no fail, but quite a few problematic modules? …

14 SCT Links General Information 14

15 Important Announcements Phones 15

16 16

17 17

18

19 Log Window Options Applications 19

20 Select the setup script (/det/tdaq/scripts/setup_TDAQ.sh will always point to the production release)1 Select the partition db file (i.e., /atlas/oks/tdaq-02-00- 03/combined/partitions/ATLAS.data.x ml) 2 Get the partition(s) described in db (the Part Name list will be automatically filled) 3 Tell the DAQPanel to acquire the information 4 20

21 21

22 22 RootController Commands Tab Panels MRS Log Window Run Information & Settings

23 23 Change subscription Message format Clone table Start from DAQPanel – Main tab – MRS button

24 24

25 25

26 26 Data shows different options depending on the kind of display selected (Module Configuration in this case) Views: Geometry and ROD crates List of: Barrels/Wheels or Crates in the configuration Different module groups Each of the squares is a module

27 27 Example: SCT View SIDE Coordinates of the module under the mouse 0 – No Data 1 – Bad Data 2 – CLK/2 a – Corrupt Data A – ABCD Error code C – Config Readback mode E – Returning events J – Junk Data O – Other

28 28 You can access to the different menus using the toolbar or with a right click on the empty part of the screen - Module Configuration: Change modules in the configuration - Probe Data: Check for modules with errors and recover them. Using this display you can perform actions like Power Cycle, Reset, Configure… - Data Manager: Allows you to access to results and plots from a test - Test Results: Show test results for all the modules - DCS Conditions: Several of the DCS parameters related with the modules are available through the SctGui (Temperature, LV, HV,...)

29 29 How to check the ROD which is BUSY? Right Click at the TIM Module and select TTC Status - If Right Click on any of the Crates a menu will show three possibilities: - Clear Latch - Mask ROD Busy - Raise ROD error (manual stop-less removal) : Use this one if a busy appears and is not picked up by the automatic removal Only do this if DAQ EXPERT (162034) ask you to do it TTC Status

30 30 - In SctGui : Tools Menu  Physics Mode Scan - Need to be in Physics mode (standalone) or in ATLAS partition - Uses triggers to acquire events, number of events and crates can be selected - Results are displayed in the SctGui – Test Results Physics Mode

31 31

32

33 33 Also available on the WEB @ http://atlasop.cern.ch/atlas-point1/operRef.php?subs=dcs/dcs/process.php?page=ATL_LHC Beam Intensity From LHC (P4) / bunch Beam Intensity From Beam Pick Up / bunch

34 34

35 35

36 36

37 37 How to see if SCT is in STANDBY? Masks Link to the LHC Handshake page

38 38 SCT Status : Injection Permit and HV Link to the LHC Handshake page Beam Protection OFF / ON

39 39 SCT Status : Injection Permit and HV Beam Flag Protection OFF / ON LHC Status

40 40

41 41

42 42

43 43

44 44

45 45

46 46 NO BEAM Short Interruption INJECTION PERMIT=FALSE PROTECTION ACTIVE STABLE BEAM=False NO BEAM Long Interruption INJECTION PERMIT=FALSE PROTECTION OFF STABLE BEAM=False INJECTION INJECTION PERMIT=True PROTECTION ACTIVE STABLE BEAM=False STABLE BEAM INJECTION PERMIT=False PROTECTION ACTIVE STABLE BEAM=True RAMP/SQUEEZE/.. INJECTION PERMIT=True PROTECTION ACTIVE STABLE BEAM=False Injection handshake warning Inject and dump cycle or lose the beam (no dump) LHC Page 1 announces NO BEAM for > 8hours NO YES 1) SL notifies ARC and shifters in the ACR 2) Shifters inform their SRC if instructed to 3) SRC requests to ARC to override STABLE BEAM flag 4) ARC checks LHC plan, gives permission for STABLE BEAM flag override 5) SRC can override STABLE BEAM flag and notifies SL 1) SL notifies ARC and shifters in the ACR 2) Shifters inform their SRC if instructed to 3) SRC requests to ARC to override STABLE BEAM flag 4) ARC checks LHC plan, gives permission for STABLE BEAM flag override 5) SRC can override STABLE BEAM flag and notifies SL SL Removes Injection Permit SL Removes Injection Permit Injection handshake warning 1) SL notifies ARC 2) Remove STABLE BEAM override 1) SL notifies ARC 2) Remove STABLE BEAM override LHC Page 1: Beam <2hours 1) SL notifies ARC 2) Remove STABLE BEAM override 3) SL goes through Injection handshake 1) SL notifies ARC 2) Remove STABLE BEAM override 3) SL goes through Injection handshake Beam dump ARC= ATLAS Run Coordinator. SRC= Sub system Run Coordinator SL = Shift Leader SL goes through Injection Handshake & brings ATLAS to STDBY, gives Injection Permit Beam dump Acronyms

47 47

48 48

49

50 50

51 51 Log in as yourself !

52 52 Log in as yourself ! Beam Flags Summary SCT Status Beam Status Alarms

53 53 Padlocks: Padlocks: No control, Free No control, Included Exclusive, Owner Shared, Owner Exclusive, NOT Owner Shared, NOT Owner No control, Locked Out Padlock background: Padlock background: Tree complete Excluded children (partitionable trees) Disabled children (non-partitionable ) Control: Control: No propagation, NO commands Propagation, NO commands Propagation (if Included), Commands by you Propagation (if Included), Commands by all Propagation (if Included), NO commands Propagation (if Included), Commands by all No propagation, NO commands Tree complete Excluded children (partitionable sub-trees) Disabled children (non-partitionable sub-trees or devices)

54 54 ON/OFF flag shows when FSI laser is ON (light in SCT), in the Barrel and/or both End-caps. Note FSI laser is usually ON, even when FSI partition is not running. Access under: SCT -> INFRASTRUCTURE -> FSI History plots show peak and mean power in each SCT region: fibres 0 & 1 are Barrel, fibres 2 & 3 are both End-caps.

55 55

56 56 Access to ROD Crates Power

57 57

58

59 59 Comment Help

60 60 OHP Configuration Buttons to OHP and DQM Main tab

61 61 If NULL monitoring could be not working or between updates Colors show the result of the Checks from DQM Links to different tabs

62 62 SCT Tree SCT tab Bad Module - RED

63 63 Mon Advanced tab Last Update (60 s) Press to get last update

64 64 Mon Advanced tab

65 65 > 35 hits > 70 % error rate < 90 % efficient > 0.001 NO OUT + Masked Online

66 66

67

68 68

69 69

70


Download ppt "Part I – Shifter Duties Part II – ACR environment Part III – Run Control & DAQ Part IV – Beam Part V – DCS Part VI – Data Quality Monitoring Part VII."

Similar presentations


Ads by Google