WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: 2015-11-13 Agenda.

Slides:



Advertisements
Similar presentations
WG 3 Progress Report at TP12 Group Name: oneM2M TP12 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
Advertisements

WG5 - MAS Progress Report at TP #16 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG PRO Progress Report at TP17 Group Name: oneM2M TP17 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG-2 - ARC TP #17 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
WG5 - MAS Progress Report at TP #17 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
TST WG Progress Report at TP 15 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Miami, USA Agenda.
TST WG Progress Report at TP 17 Group Name: TST WG Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to , Sapporo, Japan Agenda.
Requirements Overview Group Name: Technical Plenary (TP19) Source: Shelby Kiewel, iconectiv, Meeting Date: Agenda Item:
Thoughts on oneM2M resource tree Group Name: WG2 Architecture at TP#7 (Sophia, October 2013) Source: Nicolas Damour, Sierra Wireless
Report of co-conveners WG1/WG2 meetings between TP1 and TP2 Group Name: Technical Plenary #2 Source: Omar Elloumi, Alcatel-Lucent,
Status of Active New Work Items Group Name: WPM Source: Karen Hughes, ETSI Meeting Date:
WG 3 Progress Report at TP13 Group Name: oneM2M TP13 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG-2 - ARC TP #16 Status Report Group Name: oneM2M TP #16 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
3GPP Rel-13 Interworking discussions
HGI activities transfer to oneM2M Group Name: MAS Source: Patricia MARTIGNE (Orange), Deutsche Telekom, Telecom Italia Meeting Date: Agenda.
WG 2 Progress Report at TP #8 Group Name: oneM2M TP #8 Source: WG2 leadership Meeting Date: /13 Agenda Item: WG Reports.
WG1 status report to TP#17 Group Name: oneM2M TP17 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#17, Item 10.3,
WG5 - MAS Progress Report at TP #9 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
Access Control Status Report Group Name: ARC/SEC Source: Dragan Vujcic, Oberthur Technologies, Meeting Date: 09/12/2013 Agenda Item:
WG5 - MAS Progress Report at TP #10 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: WG5 Chairs Meeting Date: to
WG 3 Progress Report at TP #7 Group Name: oneM2M TP #7 Source: Raymond Forbes, LM Ericsson, Meeting Date: /18 Agenda.
Status Report on Access TP8 Group Name: WG2 Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information  Contact:
Work Programme Management Ad hoc Group Report Group Name: one M2M TP13 Source: Convenor WPM Nicolas Damour, Meeting Date:
WPM ad-hoc group report TP#17 closing Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG 3 Progress Report at TP15 Group Name: oneM2M TP15 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
TP WG1 status report to TP#16 Group Name: oneM2M TP16 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#16,
TST WG Progress Report at TP 19 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP19, Item.
WG 2 Progress Report at TP#9 Group Name: oneM2M TP #9 Source: WG2 leadership Meeting Date: /21 Agenda Item: WG Reports.
SEC Conference calls following TP#11 Group Name: WG4 (SEC ) Decision  Meeting Date: Discussion  Source: OBERTHUR Technologies Information.
Access Control Status Report Group Name: ARC/SEC Source: Dragan Vujcic, Oberthur Technologies, Meeting Date: 09/12/2013 Agenda Item:
3GPP Rel-13 Interworking discussions
ARC ordinary F2F meeting Seoul, June 2013 WG2 MEETING NOTES.
WG-2 - ARC TP #18 Status Report Group Name: oneM2M TP #18 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda.
Release Timeline Discussion R2 and beyond Group Name: TP_WPM Source: Roland Hechwartner, WPM Convenor, Meeting Date:
TST WG Progress Report at TP #20 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP20, Item.
WG5 – MAS#19 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG1 status report to TP#21 Group Name: oneM2M TP21 Source: Shelby Kiewel (iconectiv) Meeting Date: to Agenda Item: TP#21, Item 10.4,
WG5 – MAS#21 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Status of Active Work Items Level of Completeness Group Name: WPM Source: Roland Hechwartner, WPM Convenor Updated:
WG 3 Progress Report at TP10 Group Name: oneM2M TP10 Source: Raymond Forbes, LM Ericsson, Meeting Date: to
WG2 PRO Status Report at TP19 Group Name: oneM2M TP19 Source: Peter Niblett, IBM Meeting Date: to Agenda Item: TP19, Item 10.3, Reports.
Call for input from WGs on things to test Group Name: TST Source: Jiaxin Yin, Huawei Technologies Co., Ltd., Meeting Date:
WG5 - MAS Progress Report at TP #8 Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang, Chair, Meeting.
WG1 status report to TP#20 Group Name: oneM2M TP20 Source: Joerg Swetina (NEC) Meeting Date: to Agenda Item: TP#19, Item 10.4, Reports.
Authorization Architecture Discussion Group Name: SEC WG Source: Seongyoon Kim, LG Electronics, Meeting Date: 28 MAY, 2014 Agenda.
TST WG Status Report to TP #21 Group Name: TP Source: TST WG Chair, JaeSeung Song (KETI) Meeting Date: to Agenda Item: TP21, Item.
TP WG1 - REQ Progress Report at TP #14 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chair (Joerg Swetina, NEC), Secretary Changho RYOO,
WG5 – MAS#22 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Tim Carey(Alcatel-Lucent, WG5 Vice Chair) Meeting Date:
WPM ad-hoc group report TP#20 Group Name: WPM (TP adhoc) Source: convener WPM Roland Hechwartner, Meeting Date:
WG1 - REQ Progress Report at TP #11 Group Name: WG1 REQ (Requirements) Source: WG1 Vice Chairs Meeting Date: to Agenda Item: TP#11,
Methods of Work Report Group Name: TP#10 Source: Enrico Scarrone, Telecom Italia, Meeting.
3GPP Rel-13 Interworking discussions Group Name: TP #18 Source: Rejesh Bhalla, ZTE Corporation, Meeting Date: Agenda Item:
WG5 – MAS#23 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG5 – MAS#24 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
Status of Active Work Items Level of Completeness
5 Day Forecast Mon Tues Wed Thu Fri.
Issues on TST #28 (Overview)
WG2 - ARC TP#29 Status Report
WPM ad-hoc group report TP#24
WG1 status report to TP#15 Group Name: oneM2M TP15
3GPP Rel-13 Interworking discussions
WPM ad-hoc group report TP#25
WG5 – MAS#27 Status Report Group Name: WG5 MAS (Management, Abstraction & Semantics) Source: Yongjing Zhang (Huawei, WG5 Chair) Meeting Date:
WG2 - ARC TP#29 Status Report
3GPP Interworking Abstraction
MON TUE WED THU
Sun Mon Tue Wed Thu Fri Sat
Sun Mon Tue Wed Thu Fri Sat
2016 | 10 OCT SUN MON TUE WED THU FRI SAT
Sun Mon Tue Wed Thu Fri Sat
Presentation transcript:

WG2 - ARC TP #20 Status Report Group Name: oneM2M TP #20 Source: WG2 Chair (Nicolas Damour – Meeting Date: Agenda Item: WG Reports

Items for INFORMATION 17 contributions opened on Mon 4 sessions04/sess. 22 contributions opened on Tue5 sessions04/sess. 28 contributions opened on Wed4 sessions07/sess. 27 contributions opened on Thu5 sessions05/sess. 22 contributions opened on Fri2 sessions11/sess. © 2015 oneM2M Partners TP WG2-ARC_Status_Report_at_TP20 2

Items for INFORMATION Summary of Meeting objectives MNT and STE CRs to TS-0001-Functional_Architecture – 2 Agreed Baselines ARC R01 (Rel.1) and ARC (Rel.2) – 9x2 Agreed MNT Change Requests against TS-0001 (Rel ) – 4 Agreed other STE CRs against TS-0001 Rel.2 WG2-relevant Work Items with impact on TS-0001 – 3 Agreed CRs for R2 TS-0001 (WI-0005, WI-0033 and WI-0041) Progress WI TS-0014-LWM2M_Interworking – 75% complete – 3 Agreed contributions (-2219, -2218R02, -2230R10) Progress WI TS-0021-oneM2M_and_AllJoyn_Interworking – 75% complete – Baseline and contributions agreed at ARC#19.4 Progress WI TR-0023-oneM2M_and_OIC_interworking – 60% complete – TR ready to be frozen and skeleton TS available © 2015 oneM2M Partners TP WG2-ARC_Status_Report_at_TP20 3

Items for INFORMATION Summary of Meeting objectives Progress WI TR-0024 – 3GPP Interworking – 20% complete – 4 Agreed contributions (-2214R02, -2220R03, -2221R02, -2234R04) Progress WI TR-0020 – Service Transactions & SL Context – 20% complete - 2 Agreed input contributions (-2233R02, -2264R02) Progress WI TR-0021 – Action Triggering in oneM2M – 30% complete - 1 Agreed input contributions (-2231R01) Ensure consistency between WG2-ARC and WG3-PRO work – Held joint sessions, contribution PRO reviewed – Several CRs reviewed, agreed and action items taken Ensure consistency between WG2-ARC and WG4-SEC work – Held joint sessions, reviewed SEC-0652, SEC-0633, SEC-0655, SEC-0657 © 2015 oneM2M Partners TP WG2-ARC_Status_Report_at_TP20 4

Item for DECISION TS-0001 Approve TP CR_Pack_TS-0001: – 9x2 MNT Change Requests (Release 1 and Release 2) – 4 STE Change Requests (Release 2 only) – 5 Change Requests related to approved Work Items (Release 2 only) © 2015 oneM2M Partners TP WG2-ARC_Status_Report_at_TP20 5

Next Meetings / Calls ARC 20.1 Tuesday01/12/ :30 – 15:00 UTC ARC 20.2 Tuesday15/12/ :30 – 15:00 UTC ARC 21.0 Face to Face /01/2016 in San Diego ARC 21.1 Face to Face /01/2016 in San Diego ??? tbc. © 2015 oneM2M Partners TP WG2-ARC_Status_Report_at_TP20 6