S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY 2009 - Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side:

Slides:



Advertisements
Similar presentations
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)Overview of the system. 2)Discriminating errors. 3)Tricks. RUNNING PRS AND SPD – FIRST DRAFT TUTORIAL.
Advertisements

M. Dracos LNGS, 03 August Target Tracker. M. Dracos LNGS, 03 August Rate tests SM1 Sensor (1,3,4) no signal Plane 6 absent Sensor (1,2,7)
SPD commissioning Ricci, Míriam, Daniel, Edu, Hugo et al. from 1.
Jianchun Wang Syracuse University 10/16/99 CLEO Meeting Outline DAQ problems solved Recent results Status of DAQ Work to be done.
MUID Status: General Detector Health In addition to two disabled HV chains there are four other chains (out of a total of 600) that are largely or totally.
ECAL electronics Guido Haefeli, Lausanne PEBS meeting 10.Jan
LKr readout: present and future R. Fantechi 30/8/2012.
Update on FMS Repair Stephen Trentalange STAR Management Meeting October 31,
1 ECS CALO HV Control CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  ECS HV control of the ECAL and HCAL.  ECS HV control.
Yu. Guz 18/12/20061 HCAL commissioning: status and plans Yu. Guz, IHEP, Protvino Outline 1. current status of HCAL a)CW+PM b)signal cables c)LED monitoring.
CMS ECAL End Cap EDR Meeting CERN 28 Nov. to 29 Nov 2000 A.B.Lodge - RAL 1 ECAL End Cap CMS ECAL End Cap Engineering Design Review. EDR meeting held 28.
1 TPC online  offline calibration November 2002.
1 HBD Commissioning (II) Itzhak Tserruya HBD group meeting November 28, 2006 Progress from October 3 to November 28, 2006.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester April 1, 2013.
Time Meeting 2/3/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
Status of NA62 straw electronics and services Peter LICHARD, Johan Morant, Vito PALLADINO.
Debugging of M2-M5 G. Passaleva. 11/02/2009 Muon System mini review G. Passaleva 2 outline Short summary of Muon readout channel organization Connectivity.
S.MonteilPS/SPD COMMISSIONING1 PS/SPD COSMICS STATUS COMMISSIONING MEETING – JUNE W2 Large cosmics runs have been taken last week : THE POSITIVE.
Installation and Commissioning Planning Leslie Camilleri Calorimeter Commissioning Meeting 5 th September 2006.
Problems with Muon System N. Bondar O.Maev
Faculty of Physics, University of Belgrade General meeting 19 th of August, ToF-LR HV Upgrade Jovan Puzović, Faculty of Physics, Belgrade.
Commissioning of the ECAL A-side Irina Machikhiliyan, Reference data samples: #45498 PM HV nominal, LED LV = nominal, 5K of 5 TAE events, LED.
Status of the Remote HV System 10 June 2015 TileCal week, upgrade session Roméo Bonnefoy, Romain Madar and François Vazeille ● Summary of performances.
On behalf of joint ITEP / IHEP team: A. Arefiev, N. Filimonov, T. Kvaratskheliya, I. Machikhiliyan, P. Shatalov, T. Zakoryuchkina, A. Zhokhov, S. Zvyagintsev.
L0 DAQ S.Brisbane. ECS DAQ Basics The ECS is the top level under which sits the DCS and DAQ DCS must be in READY state before trying to use the DAQ system.
PS VFE & PS/SPD FE Electronics Status and Plans 21 November 2007 LPC Clermont.
High Gain Mystery of WS(1-5) Solved (Hopefully…) C.Woody HBD Meeting April 13, 2010.
Outline:  Hw status (on the basis of last LED data);  Plans / requests; ECAL: status and plans.
CALO Commissioning Plans Pascal Perret LPC Clermont 17 March 2008.
18 March 2002 All Experimenters’ Meeting Alan L. Stone Louisiana Tech University 1 DØ Status: 03/11 – 03/18 Week integrated luminosity –1.1 pb -1 delivered.
PS VFE & PS/SPD FE Electronics Status and Plans 20 February 2008 LPC Clermont.
S.MonteilCaloPiquet1 August 2010 – A typical online Calo Piquet Analysis - Outline of the analysis (Fill 1264 – Run #77195) 1. Calorimeter 2DViews, inclusive.
S.MonteilCOMMISSIONING1 PS/SPD ELECTRONICS OUTLINE 1)STATUS OF PS/SPD FE BOARDS PRODUCTION 2)PHASES OF PS/SPD COMMISSIONING 1)LEDs AND DETECTORS 2)TUBES.
1/5 ECAL/HCAL Front-end status Calorimeter Meeting Frédéric Machefert Wednesday February 9 th, 2011.
PS VFE & PS/SPD FE Electronics Status and Plans 16 January 2008 LPC Clermont.
1 Calorimeters LED control LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Status of the calorimeters LV power supply and ECS control Status of.
1 LHCb CALO commissioning meeting Anatoli Konoplyannikov /ITEP/ XCAL commissioning with LED Outline Scan data collected on HCAL and ECAL during.
9/17/2008TWEPP 2008, R. Stringer - UC Riverside 1 CMS Tracker Services: present status and potential for upgrade Robert Stringer University of California,
Status of Muon Activities W.Baldini, N. Bondar, O.Maev, B. Schmidt LS1 Meeting Dec. 20-rd 2013.
Infrastructure for LHCb Upgrade workshop – MUON detector Infrastructure for LHCB Upgrade workshop: MUON power, electronics Muon upgrade in a nutshell LV.
S.MonteilPRS timing1 November Clermont team - Calorimetry meeting Preshower timing / The cosmics and TED results / Collection of plots. 1. Overview.
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)STATUS SUMMARY. 2)PLANS AND OPERATIONS FOR THE NEXT MONTH. 3)CONCLUSION. COMMISSIONING MEETING – NOVEMBER 2007.
SPD VFE installation and commissioning (status and plans) I.Summary of VFE installation II.Stand alone VFE test: noise & offset III.Stand alone test: LED.
SPD VFE installation and commissioning (status and plans) I.Status of VFE test at Barcelona II.First commissioning experience at CERN (15 th -16 th March)
S.MonteilPS/SPD COMMISSIONING1 OUTLINE 1)PROGRESS REPORT. 2)PLANS. 3)CONCLUSION. COMMISSIONING MEETING – JUNE 2008.
14 February 2007 G. Bohner, R. Bonnefoy, M. Crouau, P. Jacquet, C. Lacan, J. Lecoq, S. Monteil, P. Perret, G. Reinmuth, K. Suchorski LPC Clermont PS Very-Front-End.
1 ECAL/PRS quality check with LED system Outline  Introduction, how to use LED time scan data for a detector quality check;  Last collected data of the.
Calorimeter global commissioning: progress and plans Patrick Robbe, LAL Orsay & CERN, 25 jun 2008.
S.MonteilPS COMMISSIONING1 MaPMT-VFE-FE ELECTRONICS COMMISSIONING AND MONITORING. OUTLINE 1)Ma-PMT TEST BENCHES MEASUREMENTS 2)VFE AND FE ELECTRONICS FEATURES.
1 ECS CALO LED Control System CALO Piquet Training Session Anatoli Konoplyannikov /ITEP/ Outline  Introduction  Calorimeter ECS LED monitoring.
Piquet report Pascal, Yuri, Valentin, Tengiz, Miriam Calorimeter meeting 16 March 2011.
ECAL status and plans C-side A-side Further plans People involved: Alexander Arefiev, Boris Bobchenko, Yury Gilitskiy, Tengiz Kvaratskheliya, Irina Machikhiliyan,
Piquet report (07/Aug/ /Aug/2012) D. Pinci.
30/March/2009SPD commissioning activities1 SPD status (1)Electronics tests (2)Control/clock cables problem (3)Plans Calo commissioning activities meeting.
Sumary of the LKr WG R. Fantechi 31/8/2012. SLM readout restart First goal – Test the same configuration as in 2010 (rack TS) – All old power supplies.
1 XCAL LED quality check and time alignment consideration CALO meeting Anatoli Konoplyannikov [ITEP / LAPP] Outline  CALO sub-detector status.
E.Gushchin,S.Filippov(INR,Moscow) 16 April 2008Calo commissioning meeting CERN PS/SPD LED monitoring system status General status LED signal is used for.
Faculty of Physics, University of Belgrade Collaboration meeting CERN, 24 th of September 2015 ToF-LR status and future Jovan Puzović, Faculty of Physics,
Calorimeter Cosmics Patrick Robbe, LAL Orsay & CERN, 20 Feb 2008 Olivier, Stephane, Regis, Herve, Anatoly, Stephane, Valentin, Eric, Patrick.
The MINER A Operations Report All Experimenters Meeting Howard Budd, University of Rochester Oct 14, 2013.
PS Timing & Alignement Progresses 17 April 2008 LPC Clermont.
Time Meeting 2/10/2015 PHENIX Run-15 Status Douglas Fields PHENIX Run-15 Run Coordinator University of New Mexico.
RICH Readout Plans F. Bucci, M. Piccini on behalf of the RICH WG.
1 Calorimeter LED & LV - HV control systems LHCb CALO meeting Anatoli Konoplyannikov /ITEP/ Outline Status of the calorimeters LV & MV power supplies.
PreShower Characterisations
LKr status R. Fantechi.
HF Test station at P5 A.Mestvirishvili.
PSD Front-End-Electronics A.Ivashkin, V.Marin (INR, Moscow)
2009: restart the system: few observations. Hw maintenance week:
Electronics for RPC Upscope
Presentation transcript:

S.MonteilPS/SPD COMMISSIONING1 HW Maintenance – JANUARY Clermont team Outline: 2009: restart the system: few observations. Hw maintenance C-side: - The devices to repair. - The checks.

S.MonteilPS/SPD COMMISSIONING2 HW Maintenance – JANUARY : restart the system: few observations. 1) Power rectifiers changed. We checked that each module of interest for us powers correctly. A reboot of RCM crates was necessary. 2) HV system repaired and reinstalled (and calibrated): it worked fine. 3) LEDs: we saw light in the DAQ. This is a way to say that the entire slow control chain was used. Several problems here and there overcame (as usual). Online system for standalone detector Run Control was made unstable by the FEST test. 4) Evgueni and Anatoli took over (see corresponding talks).

S.MonteilPS/SPD COMMISSIONING3 HW Maintenance – JANUARY 2009 HW maintenance: latest observations. We performed systematic pedestal measurements and connectics checks for the whole A-side and C-side. They exhibit the same problems as before. In addition, we lost the PSFEB07 half-board (VFE SM1-T03). Pedestals were wiggling in a recent past.

S.MonteilPS/SPD COMMISSIONING4 HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 1) Two malfunctionning VFE boards:  SM3-T01,  SM1-T03.  Symptom: a half-board KO. Fix:  The malfunction was related to unstable LV supply: -0.3 V w.r.t the nominal one. The VFE electronics shall anyway work under these conditions. Most likely, oscillating LV.  Touching, pushing, blowing on the corresponding fuse restored the nominal LV.  We have to think hard about a more robust patch panel.

S.MonteilPS/SPD COMMISSIONING5 HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 2) List of malfunctionning or dead channels ([Feb,Ch] Matrix):  [23,28], dead channel. Guess: bad VFE connection.  [53,24], large pedestal : 263. Fix:  For the former, plug/replug the cable. It actually came back to 270. Still high but as previously.  For the latter, we already decided to live with that.

S.MonteilPS/SPD COMMISSIONING6 HW Maintenance – JANUARY 2009 HW maintenance: C-side actions. 3) One PMT base has a too large current consumption as indicated by the HV control readout. (SM2-T03). But no effect observed on cosmics data. Actions:  Change the board. No effect.  It was a fake observation.  Anatoli is investigating.  The initial board was reinstalled.

S.MonteilPS/SPD COMMISSIONING7 HW Maintenance – JANUARY 2009 CONCLUSIONS 100% of the C-side channels are functionnal. We have to think about improvement of the VFE-LV patch panel distribution.