MICE CM 32 Wrap UP. Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122.

Slides:



Advertisements
Similar presentations
1 UK Project Alan Grant, STFC. Finance How savings are made Update on stepIV position Milestones Critical Path - stepIV Concerns 2.
Advertisements

Project Managers Update Roy Preece Particle Physics Department, STFC MICE Video Conference, 18 th September 2014.
Project Update for the Muon Ionization Cooling Experiment (RAL) Mark Palmer Fermilab December 15, 2014.
MICE Top-Level Project Schedule Step IV Step V Step VI Revision date: 17 th June,
MICE Collaboration meeting May 31 st – June 3 rd 2009 RAL Tim Hayler, Andy Lintern DRAFT SEQUENCE OF EVENTS STEPS
Spectrometer Solenoids MICO 146 Steve Virostek LBNL June 6, 2011.
1 MICE PM Report General Update –Phase I civil engineering –R5.2 in June –Phase II design work –Phase II hardware –A few questions –Schedule, milestones.
Alain Blondel MICE: Constraints on the solenoids 2.Field Homogeneity: or ? this will be dictated by the detector requirements. TPG will be.
MICO 1 st February 2010 Terry Hart (MOM). MICO 1 st February June 2015 Decay Solenoid DS will not be ready for Machine Physics. Matt Hills spent.
Project Report Paul Drumm CM15, FNAL June MICE Schedule Overview First beam September/October 2007 –Shutdown from January 2007 –Eight months for.
MICE FAC Alain Blondel 7 October   MICE The International Muon Ionization Cooling Experiment MICE CM19.
MICE Video Meeting, 10 Jan 081 Spectrometer Magnet Progress Michael A. Green Lawrence Berkeley Laboratory.
1 MICE PM Report Installations to date Future installation work Preparations for Phase Two Target status MICE Video Conference, 22nd May, 2008.
1 MICE Project Board Schedule and milestones Reconstructing the schedule Present status Monitoring and feedback Key schedule drivers and concerns Andy.
Spectrometer Solenoid Fabrication & Testing Update Steve Virostek Lawrence Berkeley National Lab MICE CM24 at RAL June 1, 2009.
MOM Report Paul Soler MICE Operations Manager University of Glasgow MICO April 19, 2010.
Detector Systems Update MICO March 10, MICE Detector Systems  CKOV u No update  TOF0/1 u Tests with laser injection system progressing. u Tests.
Update Hardware for conductive cooling of the quench resistors has been fabricated at LBNL. Preparation for installation to start this week. Installation.
Electrical Installation CM39 Andy Gallagher & Ian Mullacrane.
MICE magnetic measurements Sequence of events and MICE hall movements Alain Blondel – 10-April 2012 revision from 13 December 2012.
1 MICE CM28 STEP III or STEP IV? – some practicalities Andy Nichols/Tim Hayler, STFC 4 th October 2010 Considerations Step II Step III Step IV Conclusions.
Alan Grant OsC 30/4/ UK Project Finance & Schedule.
1 MICE CM32 Summary Scheduling and planning; aims for this year Schedule update Main schedule drivers Keeping us on schedule Comment on Steps V & VI Detail.
Overview and status of international systems Reminder of the principal deliverables Status reports on: Spectrometer solenoids Radio Frequency Coupling.
MICE CM Alain Blondel 1   MICE GOALS OF THE MEETING Welcome to MICE CM28.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MOM Report Galina Vankova RAL, MICE Video Conference.
1 MICE Running L. Coney – UCR MPB – 31 Oct Coney - MPB - 31 Oct 2012Outline Current Running Current Running Shift personnel training Shift personnel.
Linda Coney MC VC May 19, 2011 MICE Operations Manager Report.
Goals & Status MICE CM 33 Thanks go out to the organizers: Paul Soler, Ryan Bayes and Valerie Flood.
Tracker Summary Alan Bross MICE CM October 10, 2007.
Status of the MICE Project & Dashboard MICE Project Board 14 th November 2013 Roy Preece.
MICE FAC Alain Blondel 21 september   MICE The International Muon Ionization Cooling Experiment BRIEF STATUS OF MICE.
MICE CM35 Status and Goals Alain Blondel 1 WELCOME TO MICE CM35! – Status and Goals - Many thanks to Chris Rogers, Debbie Loader and Rose Hayes for taking.
1 MICE PM Report Summary since CM21 Decay solenoid Infrastructure progress Step One Installation Worries MICE Video Conference, 19 th June, 2008.
Spectrometer Solenoid Schedule MICE Schedule Review May 23 rd 2011 Roy Preece (STFC RAL, LBNL)
MPB 31 October 2012 and FAC 15 November monitor how well we are doing in assembling step IV ! -- should deliver a ‘realsitic schedule scenario’
Pre-CM33 schedule planning SuperMICO meeting, June 6th Motivation: For all of us to understand the main drivers behind the top-level MICE schedule So that.
OsC mtg 24/4/2014 OsC mtg Alan Grant. 2 OsC mtg 24/4/ MICE Finances - Forward Look.
1 Mice Collaboration Meeting CM33 Glasgow University 25 th – 29 th June 2012 STFC Daresbury Laboratory Electrical Infrastructure Report Authors : Ian Mullacrane.
Electronics Spares for StepIV Operations MICE CM39 C.Macwaters 25/6/14.
MICE VC Alain Blondel 1 1. MOM is now Victoria 2. Linda Coney is new MICE Online Group coordinator (rep Jean-Sebastien) May we held.
Muon Ionization Cooling Experiment Update 1Alan Bross AEM October 14, 2013.
1 UK PM Report Costs & Schedule Alan Grant, STFC.
MICE CM32 Goals of the Meeting Alain Blondel 1 WELCOME TO MICE CM32! – Goals and Status - Many thanks to Victoria Blackmore, Stefania Ricciardi and Mary-Elizabeth.
1 MICE Schedule Review no 1 Aims of review and description of review charge Motivation and external drivers Aims of the review A few of the problems Description.
Software Overview 1M. Ellis - CM21 - 7th June 2008  Simulation Status  Reconstruction Status  Unpacking Library  Tracker Data Format  Real Data (DATE)
MICE CM30 Goals of the Meeting Alain Blondel 1 MICE CM30 – Goals and Status.
MICE CM23 Introduction and Meeting Goals Michael S. Zisman Center for Beam Physics Accelerator & Fusion Research Division Lawrence Berkeley National Laboratory.
Technical Board Summary Alan Bross MICE CM17 CERN February 25, 2007.
15 June 2010PC Analysis PC Schedule Tuesdays fortnightly Provisional dates 1 June 15 June 28 June (JC away) CM27 7 – 10 RAL Let me & Yagmur.
1 UK Project Roy Preece – STFC Alan Grant, STFC. Finance Staffing Update on stepIV position Milestones Critical Path – stepIV Magnetic field mitigation.
1 MICE PM Report Phase One installations to date Phase One remaining items Progress with Phase Two Worries Don’t have time for a detailed status report,
MICE VC Alain Blondel 1 MICE NEWS MICE VC Next Collaboration meeting will be at Cosener’s14-16 February meeting at Coseners House.
Coney - CM36 - June Online Overview L. Coney – UCR MICE CM36 – June 2013.
US Project Plan for MICE Peter H. Garbincius, Mark Palmer, Alan Bross, Rich Krull Fermilab April 5, 2016.
What do we want to achieve in this running period? Michael S. Zisman Deputy Spokesmouse Center for Beam Physics Lawrence Berkeley National Laboratory MICO.
K. Long, 28 June, 2016 Introduction to MICE — and the role of the Hydrogen Delivery System.
1 UK Project Finance & Schedule. Overview Finance  Budget Setting 2013/14  June Finance  Forward look to complete stepVI Schedule  Overview 2.
MICE. Outline Experimental methods and goals Beam line Diagnostics – In HEP parlance – the detectors Magnet system 2MICE Optics Review January 14, 2016.
1 MICE CM29 Engineering Summary Cooling channel moving platforms – Norbert Floor Beams and plates – Andy L Magnetic modelling – Mike RF Engineering – Andy.
Project Managers Report CM38 – Napa Roy Preece 24th February 2014.
L. Coney UC Riverside MICE CM32 – Glasgow – June 2012
Status of the MICE Construction Project
Project Manager’s Report + DC/MoM Report
MICE CM31 Schedule summary
Spectrometer Solenoid Fabrication Status and Schedule
Controls & Monitoring in MICE
How to turn on MICE Step IV
Presentation transcript:

MICE CM 32 Wrap UP

Step IV “Almost There” We Must “Keep Our Eyes on the Prize” Alan BrossMICE CM 32 February 8-11, 20122

But

All Magnets MUST WORK! – No Mistakes, No risk taking, We get no MORE Mulligans! Then: Assembly and integration of all the subsystems in limited space this year is a challenge! Integration/Engineering activity needs better communication. Positioning of magnetic-field sensitive equipment is now highly critical. Alan BrossMICE CM 32 February 8-11, 20124

What are the implications of this? We can sleep When we are Dead * * Apologies to Warren Zevon who is, unfortunately, now sleeping

Instrumentation, DAQ, Online, Offline, Analysis Target operations and Development – Projections indicate stable and long-term running in MICE Cerenkov, TOFs, KL, Trackers – Ready to Go (Mostly) EMR – On Track DAQ, Online, Monitoring and Analysis – All making Excellent progress Alan BrossMICE CM 32 February 8-11, 20126

Step IV…. Magnets, Magnets, & more Magnets * * Plus some explosive bits

Spectrometer Solenoids First SS ready for leak check in 2 weeks – Arrives at RAL mid-June Second in close pursuit – Arrives at RAL late August Alan BrossMICE CM 32 February 8-11, 20128

AFC Alan BrossMICE CM 32 February 8-11, 20129

LH 2 System R&D complete and Test cryo decommissioned – June 12 Alan BrossMICE CM 32 February 8-11,

And then a bit of magic * …. * I mean much hard work!

Step IV Goal: Make this graphic a Photo - Christmas ‘12 Alan BrossMICE CM 32 February 8-11,

And then, there will be no sleep, even when we are Dead (tired)

Alan BrossMICE CM 32 February 8-11,

Step VI Alan BrossMICE CM 32 February 8-11, My Goal: Photo Christmas ’15 ±

“May you live in exciting Times” * The next 9 months WILL be exciting! – And we all hope very rewarding 2013 WILL yield the first cooling measurements And prepare the way for MICE – the Final Frontier * Chinese curse? - 寧為太平犬,不做亂世人 níng wéi tàipíng quǎn, bù zuò luànshì rén Alan BrossMICE CM 32 February 8-11,

On To CM 33 Alan BrossMICE CM 32 February 8-11, Next time: Haggis, deep-fried Snickers and Single-Malt Apologies to Yordan