Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005.

Slides:



Advertisements
Similar presentations
for Pipelines & Casings
Advertisements

Imperial College 1 Progress at the RAL Front End Test Stand J. Pozimski Talk outline : Overview Ion source development LEBT RFQ Beam Chopper MEBT.
Introduction to Radio Frequency Quadrupoles
Front end test stand — WP2
RAL Front End Test Stand Overview, Status and Plans RAL 12 th January 2005 Alan Letchford, ISIS Injector Group.
C. Rossi – L4 Project Meeting 3 March 2011 Status and Plans of 3 MeV Test Stand.
GCB Service Earthing Switch Retrofit Kit for HGC-3 & HEC 3..6 ABB High Current Systems Services © ABB Group April 15, 2017 | Slide 1.
Peter Spiller, IHEP, Protvino GSI, Peter Spiller IHEP FAIR in kind Contributions.
Status of the RFQ (i.e. the 4-vane cold model) Ajit Kurup UKNF Meeting 3 rd October 2007.
VRVS, Jan. 2006CERN AB-ATB1 Safety Review Solenoid & Cryogenics CERN AB-ATB VRVS session, Jan
Final Report Document. Format Title Page Executive Summary Table of Contents Introduction Mission Statement Main PDS items Brief justification of the.
Costing the Target Ajit Kurup May 17, Page 2 Costing the Target Ajit Kurup Costing of the target for the RDR needs to be done using the CERN costing.
Costing Meeting Ajit Kurup 13 th June Page 2 Costing Meeting 13 th June 2011 Ajit Kurup Summary of CERN costing workshop. Proposed Level 3 breakdown.
> >
MEP201 Mechanical Engineering Drawing 1 st semester S R Kale Lecture Piping Drawings.
Water Services Trust Fund The Urban Projects Concept (UPC) Implementation Workshop for WSPs and the Field Monitors Training Workshop Engineering Options.
They also develop power- using machines such as refrigeration and air- conditioning equipment, machine tools, material handling systems, elevators and.
Linac Front-End R&D --- Systems Integration and Meson Lab Setup
Ajit Kurup, Imperial College London. Neil Bliss, Norbert Collomb, Alan Grant, STFC/DL, Daresbury. Costing Methodology and Status of the Neutrino Factory.
Front End Test Stand Klystron Commissioning Alan Letchford UKNF Plenary Meeting 22 nd April 2009.
Cryogenic cavern in Asian site Conceptual design of the cryogenic system Layout of the cryogenic plant for site A & B New layout of the cryogenic system.
Experts in Chem-Feed and Water Treatment Pre-Engineered Systems 1.
Tracking Studies of Phase Rotation Using a Scaling FFAG Ajit Kurup FFAG07 12 th – 17 th April 2007.
Ajit Kurup, C. Bontoiu, M. Aslaninejad, J. Pozimski, Imperial College London. A.Bogacz, V. S. Morozov, Y.R. Roblin Jefferson Laboratory K. B. Beard, Muons,
Chapter 16 Selling the Layout. Objectives After reading the chapter and reviewing the materials presented the students will be able to: Develop an appropriate.
Level 2 Unit 3 Engineering Applications of Computers Engineering Diploma Level 2 Unit 3 Engineering Applications of Computers In this unit you will discover.
Ajit Kurup, Imperial College London P. Bonnal, B. Daudin, J. De Jonghe, CERN An Accelerator Design Tool for the International Design Study for the Neutrino.
The RAL Front End Test Stand Alan Letchford CCLRC RAL ISIS Injector Group Joint Accelerator Workshop 28–29 March 2006.
Engineering Design Dein Shaw. Chapter 1 Introduction What is design?
Proton Driver at Fermilab Keith Gollwitzer Accelerator Division Fermilab IDS-NF 7 th Plenary Meeting Oct 17-19,2011.
UKNFIC meeting, 20 Oct 2005 – From Physics model to Engineering model Peter Savage From Physics model to Engineering model.
Imperial College 1 Plans and Costs Front End Test Stand Aim is to demonstrate a 60 mA, 2 ms, 50 pps chopped beam at 3 MeV RAL/ISIS (ION SOURCE, CHOPPER,
Introduction Analyze components of a box fan through reverse engineering. Gain a clear understanding on how mechanical and electrical components work.
Compressor status AWAKE Technical Board meeting 19 August 2015.
F.E.T.S. Mechanical Engineering Update By P. Savage 7th September 2007.
Status of Scaling FFAG Phase Rotation ICOOL Simulations Ajit Kurup ISS Machine Group Meeting 27 th July 2006.
NEUTRINO DETECTORS Cutting-Edge Accelerator Research for a Neutrino Factory and Other Applications Ajit Kurup for the FETS and UKNF Collaborations Cutting-Edge.
Overview and Status of the Fermilab High Intensity Neutrino Source R&D Program Giorgio Apollinari for Bob Webber.
Christoph Gabor, ASTeC HIPPI—Meeting (WP 5) 26 th – 28 th September 2007 Non—destructive transverse emittance measurement device The Front End Test Stand.
UNIKL TRAINNING MODEL MODULE CONTENT 1- INTRODUCTION MODULE2 DAYS 2- PROCESS PIPING DESIGN & LAYOUT 7 DAYS 1- Piping Component 2- Equipment Datasheet 3-
Source Page US:official&tbm=isch&tbnid=Mli6kxZ3HfiCRM:&imgrefurl=
PS/SPS Days Roberto Losito/Oliver Aberle 13th January 2004
RFQ – Design, Components and Fabrication 1 We aim to design and manufacture a Radio Frequency Quadrupole (RFQ).
FETS meeting, 14th February 2007 Peter Savage The Front End Test Stand Collaboration 1 Finalising the design of the FETS main support stands.
1 CTF3 CLEX day July 2006 CLEX day 2006 Introduction G.Geschonke CERN.
The RAL Front End Test Stand David Findlay for Alan Letchford Accelerator Division, ISIS Department Rutherford Appleton Laboratory HIPPI-05, Cosener’s.
Safety Interlocks Group Front End Equipment Protection System Currently there are 55 FEEPS Systems in Service –This consists of: 43 Version 1 system 4.
Page 1 End-to-End Process Flow Visualization – Day 2 Jan, 2014.
WP3: The Neutrino Factory Costing Status Ajit Kurup CERN Costing Workshop 8 th December 2011.
ISIS OPTIMVS NEVTRONVM SPALLATIONENSIVM FONS ORBIS TERRARVM RAL Front End Test Stand — Context David Findlay Accelerator Division ISIS Department Rutherford.
Путешествуй со мной и узнаешь, где я сегодня побывал.
D. Li, Project X Collaboration Meeting, Fermilab (October 25-27, 2011) Overview of Project X Frond-End R&D at LBNL Derun Li Project X Collaboration Meeting.
Introduction to the Accelerator layout February 2016 Nick Gazis Mechanical Integration Lead Engineer.
1May, IPPP- Imperial College, London1 NF activities at IC (part II) m. apollonio.
English for Engineering Management ( 1 ) Detail 1-1 Fill out the missing words on the drawing (5 are missing) Where is the detail located on the building?
UK Neutrino Factory Conceptual Design
The RAL Front End Test Stand
The RAL Front End Test Stand
Highveld Industrial Park Workshop No. 12 Information Memorandum
Highveld Industrial Park Workshop No. 2 Information Memorandum
Highveld Industrial Park Storage Warehouse No. 3
Highveld Industrial Park Workshop No. 16 Information Memorandum
Neutrino Factory Mercury Catcher Concept
Page 1. Page 2 Page 3 Page 4 Page 5 Page 6 Page 7.
(i.e. the 4-vane cold model)
One quarter of RFQ vessel + vacuum pumps and supports
Ion Source and LEBT Beam Diagnostics
Key challenges to solve in a floating solar system
Simon Jolly UKNFIC Meeting 25th April 2008
Presentation transcript:

Layout of the Front-End Test Stand Ajit Kurup UK Neutrino Factory Meeting 12 th January 2005

Page 2 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Introduction Show some drawings of the layout that our design engineer Peter Savage has been working on. Initial problems to solve: –Location of beam. –Access to components for easy installation and maintenance. –Location of water and power supply routes to the components. Review old test stand design.

Page 3 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Photo of Old Test Stand in R8

Page 4 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Location of Beam Line of Old Test Stand

Page 5 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Plan View of Old Test Stand Enclosure

Page 6 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup New Plan View of R8

Page 7 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup New Design for the Support Stand

Page 8 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Detailed Drawing of the RFQ and Chopper

Page 9 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup New Plan View Including Ion Source ancillary equipment

Page 10 Layout of the Front-End Test Stand UK Neutrino Factory Meeting 12 th January 2005Ajit Kurup Summary Some alternative designs have been created that allow better access. Space requirements for the ion source has been looked at. Need to determine space required for power supply units. Diagnostics ?