1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment.

Slides:



Advertisements
Similar presentations
11/08/2001 FSW/GS Splinter Meeting 3 rd FSW/GS Splinter November 8, Ball COS WFC3 (morning session, auditorium) O. Lupie, WFC3 STScI Review of Goals.
Advertisements

SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Science Calibration & Instrument Status TIPS 20 Nov 2003 Last COS TIPS Aug 2003.
Page 1 9/4/01 SMS Test Phase 2 & 3 WFC3 FSW and STScI Development Flow through SMGT 4/1/02-6/30/02 FSW 2.1 C&UT 7/8/01-8/15/01 FSW 2.2 C&UT - WFC3 Software.
November 13, 2003COS Preship Review1 Resolution Specification Definition of resolution –In all cases the resolution is defined as , where  is the FWHM.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS Update The NUV Gratings 18 October 2007 Last COS TIPS presentation: 21 December.
Initial Alignment Check / Calibration in Vacuum Dennis Ebbets With substantial contributions from Tom Delker, Erik Wilkinson, Steve Osterman, Ken Brownsberger,
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 21 August 2001.
November 7, Transition Planning 1.Purpose & Scope 2.Phase List 3.Key Assumptions 4.Transition – Phase by Phase.
January, Please join us in the Tech Tower Auditorium on Tuesday, January 30th for a WFC3 Post-CDR Celebration 4:30 to 7:30 pm Dinner and adult beverages.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
Data Management Subsystem Jeff Valenti (STScI). DMS Context PRDS - Project Reference Database PPS - Proposal and Planning OSS - Operations Scripts FOS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS TV Update 21 December 2006 Agenda Agenda Testing Setup and Status Testing Setup.
1 STScI Pipeline Thermal-vacuum data handling I. Neill Reid for WFC3 Instrument CALibration team ICAL.
Cosmic Origins Spectrograph Hubble Space Telescope James C. Green University of Colorado Cosmic Origins Spectrograph Instrument Design and Capabilities.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Status FUV Detector “1-bounce design” NUV Detector HST aberration fully-corrected Calibration.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review COS Lamp Lifetime Estimates for TAGFLASH Scenarios.
Keyes - 5 Mar 2001 Slide 1 of 16 COS Science Team Meeting – STScI Status  STScI Integrated Scheduling System Development – TIME-TAG (primary science mode)
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
COS PIPELINE PDR Daryl Swade December 7, 2000OPUS / OTFR Space Telescope Science Institute 1 of 24 Science Data Processing
HST Quarterly Review Page 1 Space Telescope Science Institute 12 February 2004 SI Status: COS STScI Support of COS Thermal-Vacuum Testing COS Thermal-Vacuum.
18 May 2006 Slide 1 of 10 STScI TAGFLASH Ground System Development Current ground system could support immediate COS launch Current ground system could.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Hubble Mission Status Review Charles D. (Tony) Keyes Last Review: 10 June August 2003.
TIPS COS Overview - Keyes : 18 May 2000 COS Overview v CDR: April 2000 v FUV delivery: January 2001 v Environmental (Thermal-Vac): spring 2002 v Launch:
The Status of COS Flat Fields Tom Ake TIPS 21 August 2008.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Outline of CALCOS Processing Steps and Keywords Reference Files Associations.
1-D Flat Fields for COS G130M and G160M Tom Ake TIPS 17 June 2010.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 January 2002.
Cosmic Origins Spectrograph
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline Calibration Goals of CALCOS Association Table Input and Output Files High Level.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA An Update on the COS Development Status TIPS 21 August 2003 (Last COS TIPS: Dec 2002) COS Integrated.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Pipeline PDR File Structure Overview Charles D. (Tony) Keyes 7 December 2000.
TIPS COS Status: SMOV update III STScI/CU COS Team 17 September 2009.
COS Training Series II. Optimizing Observations --- David Sahnow February mm.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Status STIC 13 February 2001.
"Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public disclosure." 19 Sept, 2002TIPS – WFC3 Status 1 -UVIS.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA SMOV4 Requirements Review Cosmic Origins Spectrograph Scott D. Friedman STScI 30 July 2003.
1 Hubble Science Operations Status Rodger Doxsey 18 November 2004.
Slide 1 of 5 COS Monthly Status Review David Soderblom STScI
COS PIPELINE CDR Jim Rose July 23, 2001OPUS Science Data Processing Space Telescope Science Institute 1 of 12 Science Data Processing
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 17 September 2002.
Click to Change Title Here is a text box to present information in paragraph format, instead of bulleted lists. We’ve left space to the right for an image.
WFC3 COS 5 th COS/WFC3 FSW/GS Splinter Meeting Baggett - 03 April 2002 Slide 1 of 8 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA 5 th COS/WFC3.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph Hubble Mission Status Review Charles D. (Tony) Keyes Last Review:
The Status of HST/COS and HST/STIS Cristina Oliveira 8/12/14COS and STIS Cal Workshop1 SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA.
HST Quarterly Review Page 1 Space Telescope Science Institute 15 October 2003 SI Status: COS STScI COS Program Activity SubprojectSTScI Activity Instrument.
WFC3 SMOV Report for TIPS 16 July 2009 John MacKenty This presentation contains material that is embargoed until after the SM4 ERO press conference. Images/spectra.
23-Nov-1999STScI Projects Monthly Status Review1 of 8 SpaceTelescopeScienceInstitute COS Status Report for period December, 1998 to November, 1999 Tony.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 24 October 2007.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS TAGFLASH System Requirements Review CALCOS Requirements Philip E Hodge 14 December 2005.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 17 January 2002.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 15 September 1999.
Cosmic Origins Spectrograph November 13, 2003 Page 1 “Data contained herein is exempt from ITAR regulations under CFR 125.4(13) -- data approved for public.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 April 2002.
Keyes – 1 February 2000 : Slide 1 of 6 COS Monthly Status Review v OP-01 updates and revisions – STScI and IDT schedule and agenda for continuing COWG.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA COS Monthly Status Review 22 January 2003.
STIS Status TIPS, September 17, 2009 Charles Proffitt for the STIS team.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS Cosmic Origins Spectrograph 20 September 2001.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA Cosmic Origins Spectrograph HST Quarterly Review – Instrument Status Charles D. (Tony) Keyes.
Cosmic Origins Spectrograph Monthly Status Review 17 April 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
COS Training Series COS Update: pre-SMOV / Cycle Tony Keyes March 2009.
MAVEN-SWEA Assembly, Integration & Test (AIT) Contents AIT: CESR Team Facilities Main subcontractors Applicable documents AIT documentation Cleanliness.
AHPS Program Plan FY07 Update. AHPS Program Plan Document Purpose  Provide an overview of AHPS and serve as a guide for the AHPS program  Defines in.
Cosmic Origins Spectrograph Monthly Status Review 19 June 2001 Charles D.(Tony) Keyes Page 1 of 10 Synopsis Role: STScI supports COS science operations.
SPACE TELESCOPE SCIENCE INSTITUTE Operated for NASA by AURA TIPS / COS 27 June 2002.
JWST Pipeline Overview
Characterization of the Post-Launch Line Spread Function of COS
COS FUV Flat Fields and Signal-to-Noise Characteristics
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2008.
CRaTER Pre-Environmental Review (I-PER) Completed Verification Results Bob Goeke September 10-11, 2007.
By: ______________________
Presentation transcript:

1 COS SI Testing and Delivery SI formally delivered to HSTP in May  N 2 purge alignment and NUV throughput testing pre- and post-ship  No effective alignment changes  Stored in clean room at GSFC  GSFC assumes responsibility for semi-annual functional testing after delivery  Next round of testing: late Nov 2004  All throughput data archived at STScI

2 STScI COS Effort Thermal-Vac Data Processing  Re-ingested T-V data with updated keywords  Initial Verification of CALCOS functionality for flatfielding, spectrum extraction, spectrum combination  Keyword dictionary prepared Completed TIR on Cumulative Exposure Image (FUV/NUV) and Pulse-height map (FUV) Completed ISR on high voltage transients in FUV detector and operational responses - Friedman (STScI), Brownsberger(IDT) FASTEX Standards Paper (Bohlin, Leitherer) in progress Deferred all SMGT, SMOV4, User Support effort

3 COS SI Issues Optic Select Mechanism drift characterized in testing at Ball and CU  Both thermal and mechanical components are present  No hardware amelioration planned  Must be corrected to achieve design resolution in many cases  Rely on operational correction procedure  Applies to time-tag only; requires lamp exposures during science  Algorithm described and procedures outlined  Requires extensive STScI ground system work to implement Knowledge and expertise is presently available at STScI  Full requirements development during FY05

4 Additional COS Pictures